Examples of Minor Outage in a sentence
The failure of a single access point will be deemed a Minor Outage and will be replaced within three (3) business days of notification by a Department technician or system.
The failure of a single access point will be deemed a Minor Outage and will be replaced within three (3) business days of notification by a Department technician or system.
Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.
Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.
Outage has the meaning set forth in the CAISO Tariff.
Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.
Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.
Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Unplanned Service Interruption means any Service Interruption where events or circumstances prevent the timely communication of prior warning or notice to the Trader or any affected Customer;
Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,
Unscheduled Outage means any outage that is not a “Scheduled Outage”. “Committed Time” shall mean, as to each Business Day, one hour before the trading session for that day is scheduled to open on the NYSE and one hour after the trading session on the NYSE for that day finally closes, but excluding the following periods of Scheduled Outage (defined below). A “Scheduled Outage” shall mean (1) those time periods from 12 AM Saturday to 6:00 AM Sunday each week and 11:00 PM to 12:00 AM daily, during which Computershare’s System maybe unavailable due to routine maintenance; and (2) any time period as to which Company has received prior notice. ≥99.5% <99.5% to ≥98% <98%
Scheduled Outage has the meaning given to it in the Grid Code;
Planned Service Interruption means a Service Interruption that has been scheduled to occur in accordance with schedule 5;
Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.
Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.
Maintenance Outage means NERC Event Type MO, as set forth in attached Exhibit B, and includes any outage involving ten percent (10%) of the Facility’s Net Output that is not a Forced Outage or a Planned Outage.
Modular building retailer means any person who purchases or acquires a modular building from a
Permanent radiographic installation means an enclosed shielded room, cell, or vault, not located at a temporary jobsite, in which radiography is performed.
Catastrophic illness or “injury” means an illness or injury that is expected to incapacitate the employee for an extended period of time, or that incapacitates a member of the employee’s family which incapacity requires the employee to take time off from work for an extended period of time to care for that family member, and taking extended time off work creates a financial hardship for the employee because he or she has exhausted all of his or her sick leave and other paid time off.
Catastrophic disability means a physical and not a psychological
Covered Building Service Contract means a contract or subcontract to provide Building Services to the City of Cambridge or any of its departments or subdivisions.
Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:
Modular building means, but shall not be limited to, single and multifamily houses, apartment
Outages means the planned unavailability of transmission and/or generation facilities dispatched by PJM or the NYISO, as described in Section 35.9 of this Agreement.
Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.
Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;
Mental abnormality or "personality disorder" means a congenital or acquired condition that affects