Phase 1 Works definition

Phase 1 Works means the design, development, construction, completion, commissioning (but not the works subject to the Decant and Commissioning Programme) and testing of the Phase 1 Areas at the Site and access thereto from the highway, including the Highway Works and the Services Connections and works required as the result of any Variation to the Phase 1 Areas during the Phase 1 Design and Construct Phase (including the physical assets resulting from the same).
Phase 1 Works means the works conducted by the Landlord in respect of the design and construction of the core and shell of the Facility, such that the Facility achieves the TOP;
Phase 1 Works means the Water Infrastructure works required to complete the construction and installation of the Water Treatment Facility at the Temporary Water Facility Site, including all works and infrastructure needed to convey water from the reservoir to the Temporary Water Facility Site, and from the Temporary Water Facility Site to UBID's water main as part of the Water Infrastructure;

Examples of Phase 1 Works in a sentence

  • For instance, we can write productions quite naturally as sentence --> noun_phrase, verb_phrase.

  • Phase 1 Works: All five civil works contract packages of phase 1 upgrading works, which constitute a total length of 232 km, have been awarded at a total contract price of Rs 5890 million [approximately US$ 130.9 million @ 1 US$ = Rs 45].

  • There are two types of AI algorithms: one is designed with a specific goal in mind, and there are self-learning systems that learn from, among other things, historical data.

  • Kin reached an agreement with the regulators to conduct a phased approval process (refer ASX announcement 17 August 2017 , Kin Lodges Phase 1 Works Approval for Leonora Project).

  • We have obtained the tender report from the Quantity Surveyor and noted that the proposed tender sum and the Defects Liability Period Extension Price of the Main Contractor for each of the Phase 1 Works and the Phase 2 Works was lower than that of the other candidate.

  • Lower revenue mainly due to lower progress claims from the Pan Borneo Highway project in the State of Sarawak (Phase 1 Works Package Contract – WPC-09) undertaken by the subsidiary Company i.e KKBWCT Joint Venture Sdn Bhd., which contributed revenue of RM4.5 million in the current quarter, down by 90.9% as compared to RM49.2 million recorded in the preceding year corresponding quarter.

  • The Board considered and approved a late, separately circulated report of the City Surveyor providing Governors with a Progress Report on the Master Plan – Phase 1 Works.

  • Navan GDA Cycle Network: Athlumney to Trim Road Cycle and Pedestrian Scheme – Phase 1 Works from Solstice to Beechmount.• Final interrogation of Tender Documents for the Phase 1 Construction element.

  • The satisfaction of the first series of conditions precedent will lead to the granting of a building licence agreement (‘BLA’) to the Developer with respect to the Phase 1 Works.

  • Received – 03.07.2017Ref: P-0-33 P03 – Upper School – Ground Floor Plan Phase 1 Works.


More Definitions of Phase 1 Works

Phase 1 Works means the Water Infrastructure Works required to complete the construction and installation of the Water Treatment Facility at the Temporary Water Facility Site, including all works and infrastructure needed to convey water from the reservoir to theTemporary Water Facility Site, and from the Temporary Water Facility Site to UBID’s water main as part of the Water Infrastructure.(j) “Phase 2 Works” means the Water Infrastructure Works required to complete the construction and installation of the Water Treatment Facility at the Permanent Water Facility Site, including construction of the new permanent reservoir and all other works and infrastructure needed to convey water from Langley Lake to the Permanent Water Facility Site and from the Permanent Water Facility Site to UBID’s water main as part of the Water Infrastructure, as such works may be constructed in stages.Definition (i) and (j) above describe a Phase 1 temporary water treatment plant to be built at the site of the existing UBID water disinfection plant, which is situated on KIP land and leased to UBID, and a Phase 2 water treatment plant to be built at the Permanent Water Facility Site on other lands owned by UBID.(u) “Water Service” means the distribution and supply of potable water from Langley Lake to the Lands for residential and commercial purposes;(y) “Water Supply Infrastructure (Developer)” means the Water Supply Infrastructure the Developer is responsible for to construct under this Agreement, which includes, without limitation:(i) the Water Treatment Facility, the building that houses the Water Treatment Facility at the Temporary Water Facility Site;
Phase 1 Works has the meaning given to it in paragraph 19.1(c)(i) of Schedule 6.2 (Great Western Franchise Specific Provisions);
Phase 1 Works means the first phase of the Works and the Project Deliverables during the Works;

Related to Phase 1 Works

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Development Work means any work carried out in relation to the physical construction of a mine;

  • Work/ works means work / works to be executed in accordance with the contract.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • The Works/Project means the works to be executed or done under this contract.

  • Project Improvements means site improvements and facilities that are:

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Development Phase means the period before a vehicle type is type approved.

  • Demolition works means any physical activity to tear down or break up a structure (or part thereof) or surface, or the like, and includes the loading of demolition waste and the unloading of plant or machinery.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected. Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.

  • piece-work means any system by which earnings are calculated upon the quantity or output of work performed;

  • Development Project means a project for the development of land within a project area.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Licensee Improvements means any enhancement to or modification or improvement of the Licensed Patents and/or the Proprietary Information created by or on behalf of Licensee and/or any of its subsidiaries.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Research Project means a discrete scientific endeavor to answer a research question or a set of research questions related to medical marijuana and is required for a medical marijuana research license.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Digital audio-visual work means a series of related images which, when shown in succession, imparts an impression of motion, together with accompanying sounds, if any.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Project Work means the work required to complete the Project.

  • Development Area means that area to which a development plan is applicable.

  • Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalised Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.