After the Design Kick Sample Clauses

After the Design Kick. Off Meeting, the Designer shall review the Owner’s library of Record Drawings and Documents and select the drawings and documents, if any, which may be applicable to the Project. The Designer shall also field verify both the applicable Record Drawings and Documents, and existing site conditions, as required by the Project Deliverables, EDC-06. 2.2.3.1 The Designer is responsible to have knowledge of the project’s geographical location and the environmental conditions for the construction and operation of the facility. The Design shall identify and analyze requirements of governmental authorities having jurisdiction to approve the portions of the Project designed by the Designer with whom consultation is to be undertaken in connection with the Project. 2.2.3.1.1 The Designer shall thoroughly familiarize itself with all existing conditions and available as- built documentation that relate in any way to the Project or Services requested. 2.2.3.1.2 The Designer is responsible to identify all the permitting requirements for the construction and operation of the facility and provide the listing to the Authority at the 30% design submittal. The Permit Listing shall include a schedule of when the permits will be required for the Project. 2.2.3.1.3 For phased Work the Permit Listing shall also include any required multiple permits needed to obtain a Certificate of Occupancy. 2.2.3.2 The Designer shall not contact the permitting authorities directly on the Owner’s behalf without the Owner’s consent. 2.2.3.3 For projects funded by the Federal Aviation Administration (FAA) and project funded by the Florida Department of Transportation (FDOT), the Design and Engineer’s Report shall comply with all FAA and FDOT requirements as promulgated by the FAA’s Orlando Airport District Office and by the FDOT.
AutoNDA by SimpleDocs

Related to After the Design Kick

  • Access to Shareholder List Shareholders of record may apply to the Trustees for assistance in communicating with other shareholders for the purpose of calling a meeting in order to vote upon the question of removal of a Trustee. When ten or more shareholders of record who have been such for at least six months preceding the date of application and who hold in the aggregate shares having a net asset value of at least $25,000 or at least 1% of the outstanding shares, whichever is less, so apply, the Trustees shall within five business days either: (i) afford to such applicants access to a list of names and addresses of all shareholders as recorded on the books of the Trust; or (ii) inform such applicants of the approximate number of shareholders of record and the approximate cost of mailing material to them and, within a reasonable time thereafter, mail materials submitted by the applicants to all such shareholders of record. The Trustees shall not be obligated to mail materials which they believe to be misleading or in violation of applicable law.

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services. A. Applicants are encouraged to emphasize the following components in the design of their projects. Projects must: 1. Use a collaborative approach to maximize existing community resources and avoid duplication of effort; 2. Enhance systems and local processes to make it easier for people to transition to, from, and between services; 3. Address barriers to ensure services are accessible to people regardless of setting or location; and 4. Promote improvement and positively impact health and well-being through coordinated service delivery. B. To be effective, services and activities provided or made available as part of the Proposed Project should have policies and procedures in place and include with the application as an attachment that: 1. Delineate the timely provision of services; 2. Deem Client eligibility and service provision as soon as possible and no later than 30 calendar days from initial request; 3. Require staff to assess and prioritize Client needs; 4. Implement with model fidelity to an evidence-based program or based upon best available research; 5. Plan in partnership with the person and are inclusive; 6. Provide in an environment that is most appropriate and based on a person’s preference including reasonable clinic/reception wait times that are not a barrier to care; 7. Provide referral sources for Clients that cannot be served or receive a specific service; 8. Are culturally and linguistically sensitive; 9. Tailor services to a person’s unique strengths and needs; 10. Manage funds to ensure established Clients continuity of care throughout budget year; 11. Continue to provide services to established Clients after allocated funds are expended; 12. Have processes to identify and eliminate possible barriers to care; 13. Do not deny services due to inability to pay; 14. Have appropriate key personnel and required staff to meet the medical and health needs of Clients; 15. Bill services appropriately and timely through TMHP; 16. Effectively communicate and document information related to health care needs with next steps available to Client; 17. Establish outreach and education plan for the community; and 18. Outline successful delivery of direct clinical services to Clients By submitting an Application under this RFA, the Applicant certifies that Applicant has or will have at time of grant award services, policies, or procedures that conform with the requirements in this section as applicable. HHSC, in its sole discretion, may request to review relevant documentation during the project period as necessary to ensure program fidelity.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall: 1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the Work to be performed and furnished by Contractor. 2. Visit the Site as needed to assist in preparing the final Drawings and Specifications. 3. Provide technical criteria, written descriptions, and design data for Owner’s use in filing applications for permits from or approvals of governmental authorities having jurisdiction to review or approve the final design; assist Owner in consultations with such authorities; and revise the Drawings and Specifications in response to directives from such authorities, as appropriate. 4. Advise Owner of any recommended adjustments to the opinion of probable Construction Cost. 5. After consultation with Owner, include in the Construction Contract Documents any specific protocols for the transmittal of Project-related correspondence, documents, text, data, drawings, information, and graphics, in electronic media or digital format, either directly, or through access to a secure Project website. Any such protocols shall be applicable to transmittals between and among Owner, Engineer, and Contractor during the Construction Phase and Post- Construction Phase, and unless agreed otherwise shall supersede any conflicting protocols previously established for transmittals between Owner and Engineer. 6. Assist Owner in assembling known reports and drawings of Site conditions, and in identifying the technical data contained in such reports and drawings upon which bidders or other prospective contractors may rely. 7. In addition to preparing the final Drawings and Specifications, assemble drafts of other Construction Contract Documents based on specific instructions and contract forms, text, or content received from Owner. 8. Prepare or assemble draft bidding-related documents (or requests for proposals or other construction procurement documents), based on the specific bidding or procurement-related instructions and forms, text, or content received from Owner. 9. Contract shall include contractor provided changeable message signs to communication construction information. 10. Furnish for review by Owner, its legal counsel, and other advisors, 6 copies of the final drawings and Specifications, assembled drafts of other construction Contract Documents, the draft bidding-related documents (or requests for proposals or other construction procurement documents), and any other final design Phase deliverables, by the established due date, with the Final Design Phase, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items, and any instructions for revisions. B. Engineer’s services under the Final Design Phase will be considered complete on the date when Engineer has delivered to Owner the final Drawings and Specifications, other assembled Construction Contract Documents, bidding-related documents (or requests for proposals or other construction procurement documents), and any other Final Design Phase deliverables. C. In the event that the Work designed or specified by Engineer is to be performed or furnished under more than one prime contract, or if Engineer’s services are to be separately sequenced with the work of one or more prime Contractors (such as in the case of fast- tracking), Owner and Engineer shall, prior to commencement of the Final Design Phase, develop a schedule for performance of Engineer’s services during the Final Design, Bidding or Negotiating, Construction, and Post-Construction Phases in order to sequence and coordinate properly such services as are applicable to the work under such separate prime contracts.

  • After the Closing Seller shall, and shall cause its Affiliates to, preserve, in accordance with Seller’s, or its applicable Affiliates’, standard document retention policies and until the earlier to occur of (i) such date as such books and records are transferred to Buyer or its Affiliates or (ii) the end of the Retention Period, all pre-Closing Date books and records of the Acquired Companies and the Business (including any Business Data) that have not been transferred to Buyer. During such period, upon any reasonable request from Buyer or its Representatives, the member of the Seller Group holding such books and records shall (i) provide to Buyer or any of its Representatives reasonable access to such books and records during normal business hours; provided, however, that such access shall not unreasonably interfere with the conduct of the business of Seller or any of its Affiliates holding such books and records and (ii) permit Buyer or any of its authorized Representatives to make copies of such books and records, in each case, at no cost to Buyer or its applicable Representatives (provided that Xxxxx will reimburse Seller for reasonable out-of-pocket costs or expenses incurred by Seller). Nothing herein shall require Parent, Seller or any of its Affiliates to disclose any information to Buyer if such disclosure would (A) jeopardize any applicable attorney-client privilege, the work product immunity or any other applicable legal privilege or similar doctrine, (B) contravene any applicable Law or contractual confidentiality obligation, (C) jeopardize the health and safety of any employee of Seller or any of its Subsidiaries, in light of COVID-19 or any COVID-19 Measures or (D) result in competitive harm to Seller or any of its Subsidiaries, it being understood that Seller shall use its reasonable best efforts to make other arrangements (including redacting information or entering into joint defense agreements), in the case of each of clauses (A) to (D), that would enable any otherwise required disclosure to Buyer or its Representatives to occur without so jeopardizing any such privilege or immunity or contravening such applicable Law or contractual confidentiality obligation or jeopardizing health and safety or resulting in competitive harm or (E) require Parent, Seller or any of its Affiliates to disclose its Tax records (except for Tax records exclusively of, or with respect to, the Acquired Companies or the Business). Such books and records may be requested under this Section 9.5(b) for any reasonable business purpose, including to the extent reasonably required in connection with accounting, litigation, financial reporting, federal securities disclosure, compliance with contractual obligations of Buyer or any of its Affiliates or review of the Closing Statement.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Acceptance of Deliverables The State’s Project Manager shall be responsible for the sign-off acceptance of all Deliverables required and performed/submitted pursuant to this Agreement. Upon successful completion of a Deliverable, Contractor shall provide the State’s Project Manager with a completed Acceptance and Signoff Form (Exhibit E). The State’s Project Manager will apply the standards established in Exhibit D and the acceptance criteria set forth in subparagraph B of this article, as appropriate, to determine the acceptability of the Deliverable provided by Contractor. If the State’s Project Manager rejects the Deliverable, the parties agree to any dispute(s) resulting from such rejection(s) will be resolved as set forth in this article. Acceptance Criteria for Deliverables (“Criteria”) provided by Contractor pursuant to this Agreement include: Timeliness: The Work was provided on time; according to schedule; Completeness: The Deliverable contained all of the, Data, Materials, and features required by the Agreement; and Technical accuracy: The Deliverable complied with the standards of this Agreement, or, if this Agreement lacks a standard for provision of the Work, the currently generally accepted industry standard. Contractor shall provide the Deliverable to the State, in accordance with direction from the Project Manager and as provided for in Exhibit D. The State shall accept the Deliverable, provided that Contractor has delivered the Deliverable in accordance with the Criteria. The State’s Project Manager shall assign the Acceptance and Signoff Form to notify Contractor of the Deliverable’s acceptability. If the State rejects the Deliverable provided, the State’s Project Manager shall submit to Contractor’s Project Manager a written rejection describing in detail the failure of the Deliverable as measured against the Criteria. If the State rejects the Deliverable, then Contractor shall have a period of ten (10) Business Days from receipt of the Notice of rejection to correct the stated failure(s) to conform to the Criteria.

  • Access to Site 3.05.1 Contractor may enter and leave the premises at all reasonable times without charge. Contractor and its employees may use the common areas and roadways of the premises where it is to perform the services together with all facilities, equipment, improvements, and services provided in connection with the premises for common use. This excludes parking for Contractor’s personnel. Contractor shall repair any damage caused by it or its employees as a result of its use of the common areas.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!