All Risk Builders Risk Insurance Sample Clauses

All Risk Builders Risk Insurance. During the entire construction period, Seller shall maintain, or cause to be maintained, All-Risk Builders’ Risk Insurance in an amount not less than 100% of the replacement cost of the Generating Facility to protect against loss of, damage to, or destruction of the Generating Facility, and including expediting expense coverage. Such Builder’s Risk Insurance shall also provide for Boiler and Machinery Coverage (or, at Seller’s option, the required Boiler and Machinery Coverage may be written as a stand-alone coverage with a joint loss adjustment agreement with the Property Insurance policy/insurer). Such Insurance shall contain a waiver of subrogation in favor of Anaheim.
AutoNDA by SimpleDocs
All Risk Builders Risk Insurance. X This Project is New Construction, Addition, or Major Renovation. Contractor shall procure and maintain “all-risk” Builder’s Risk insurance as set forth in Section 12 of the General Conditions for a Site which is Contractor controlled during construction. This Project is Limited Renovation. Contractor shall procure and maintain “all risk” Builder’s Risk insurance as set forth in Section 12 of the General Conditions for Limited Renovation.
All Risk Builders Risk Insurance. CenturyLink will effect and maintain "All Risk" builders risk insurance to cover that portion of the Service, materials and equipment incorporated in the Service and upon all materials and equipment on or about the Site, and off-site storage within 1000 feet of the Site which are ultimately intended for permanent use or incorporation in the Service, or incidental to the construction thereof. The builder's risk policy specifically does not provide coverage for any construction manager’s or any Supplier's or subcontractor’s machinery, tools, equipment, appliances or other personal property owned, rented or used by any construction manager, or any Supplier or subcontractor or anyone employed by Supplier in the performance of the Service. The policy also covers renovations under construction but does not cover buildings or structures existing prior to the construction of improvements, alterations or repairs.
All Risk Builders Risk Insurance. Coverage shall be all-risk (or all-risk installation floater for instances in which the project involves solely the installation of material and/or equipment), including, but not limited to, fire, extended coverage, vandalism and malicious mischief, theft and, if applicable, flood, earth movement and named storm. Builder’s risk and installation floater limits shall be equal to 100 percent of the Contract Sum plus, if any, existing property and Owner-furnished equipment specified by Owner. The policy shall be written jointly in the names of Owner and Contractor. Subcontractors shall be named as additional insureds. The policy shall have endorsements as follows:  This insurance shall be specific as to coverage and not contributing insurance with any permanent insurance maintained on the property.  This insurance shall not contain an occupancy clause suspending or reducing coverage should Owner partially occupy the Site and before the parties have determined Substantial Completion.  Loss, if any, shall be adjusted with and made payable to Owner as trustee for the insureds as their interests may appear. Owner shall be named as loss payee.  For renovation projects or projects that involve portions of Work contained within an existing structure, refer to Supplementary or Special Conditions for possible additional builder’s risk insurance requirements.  For Owner furnished equipment or materials that will be in care, custody or control of Contractor, Contractor will be responsible for damage and loss.  For those properties located within a Tier 1 or 2 windstorm area, named storm coverage must be provided with limits specified by Owner.  For those properties located in flood prone areas, flood insurance coverage must be provided with limits specified by Owner.  Builder’s risk insurance policy shall remain in effect until Substantial Completion.  If this Contract is for asbestos abatement only, the foregoing All-Risk Builder’s Risk or All-Risk Installation Floater is not required.
All Risk Builders Risk Insurance. Prior to commencement of the Work, Tenant’s Contractor shall obtain on a policy acceptable to Landlord, and thereafter at all times during the performance of the Work maintain All Risk Builder’s Risk Insurance insuring the interest of Landlord and Tenant’s Contractor, as their interests may appear, set forth in the single policy, written on the completed value basis in an amount not less than the Construction Costs and all authorized change orders.
All Risk Builders Risk Insurance a. An All Risk Builders Risk insurance policy including earthquake and flood include start-up and testing for installed equipment, coverage for materials and equipment while under the care, custody and control of the Contractor during performance of the work, at the site, offsite or while in transit to the site.
All Risk Builders Risk Insurance. At, or prior to, execution of the GMP Amendment, CMR shall obtain and maintain all-risk builder’s risk insurance, or all- risk installation floater for those instances in which the Project involves solely the installation of material and/or equipment.
AutoNDA by SimpleDocs
All Risk Builders Risk Insurance. All risk" builder’s risk insurance, including vandalism and malicious mischief, covering improvements in place and all material and equipment at the job site. The minimum limits of liability shall be a combined single limit with respect to each occurrence in an amount of not less than that specified in Exhibit I.
All Risk Builders Risk Insurance. Contractor shall obtain and maintain All-Risk Builder’s Risk Insurance, or all-risk installation floater for those instances in which the Project involves solely the installation of material and/or equipment.
All Risk Builders Risk Insurance. ESCO shall obtain and maintain All-Risk Builder’s Risk Insurance, or all-risk installation floater for those instances in which the Project involves solely the installation of material and/or equipment.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!