ANALYSIS SUMMARY Sample Clauses

ANALYSIS SUMMARY. TABLE 1 - RESOURCES Tower Elevation Drawing: Prepared by Xxxxxx Engineering Solutions, dated December 14, 2005. Tower Mapping Report: Prepared by Advantage1 Wireless Services, dated September 21, 2010. RF Site Design: Prepared by Xxx Xxxxx, received November 30, 2010. Site Visit: CTS Telecom performed a limited site visit on August 17, 2010. Tower Analysis Software: RISA Tower v. 5.4.2.0 TABLE 2 – ANALYSIS CRITERIA Code: ANSI/TIA-222-G • Structure Classification = III • Exposure Category = B • Topographic Category = 1
AutoNDA by SimpleDocs
ANALYSIS SUMMARY. In summary, the ACOBAR Experiment did not affect marine mammal species and no takes of marine mammals occurred as a result of this experiment, including those marine mammals designated as endangered or threatened under the U.S. ESA or the IUCN. The relatively low power of the acoustic sources and relatively short transmission period, followed by long periods with no transmissions, resulted in small acoustic ZOIs (<15.9 m), which are indicative of the negligible potential impact to any marine mammal species. The ACOBAR Experiment had no effects on the water column and only a transitory, non-permanent effect on the benthic environment due to the mooring anchors. There was limited potential for acoustic impacts on fish species; thus, potential impacts on fish, including the IUCN-listed Atlantic cod, were considered negligible. Thus, no impacts occurred to commercial fisheries in the region. Further, the ACOBAR Experiment did not affect the habitats or resources of designated MPAs since they were located so far from the experiment area. Since no commercial shipping lanes are located in the experiment area, shipping was not impacted by the experiment, especially since most of the deployed equipment resided at depths well beyond potential interaction with ships. It should be noted that the impacts analysis performed for this EAR pertains only to the underwater sound sources cited in Table 1-2 and should not be construed to relate to any other underwater sound sources (e.g., acoustic deterrent devices).

Related to ANALYSIS SUMMARY

  • Analysis LICENSEE represents and agrees that it will only incorporate Components received from authorized suppliers into Licensed Products and for no other purpose, and that LICENSEE will not directly or indirectly attempt to reverse-engineer any material provided to it hereunder by LICENSEE or any supplier of any Component.

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • JOB SUMMARY Vouches sample transaction in audit verification assignments and submits findings to supervisor; • Records proceedings of entry and exit conferences; • Collects and analyses data and statistics; • Prepares audit working papers for review by supervisor; • Supervises subordinate staff; • Undertakes any other duties that may be assigned by the Internal Auditor.

  • DATA COLLECTION AND ANALYSIS The goal of this task is to collect operational data from the project, to analyze that data for economic and environmental impacts, and to include the data and analysis in the Final Report. Formulas will be provided for calculations. A Final Report data collection template will be provided by the Energy Commission. The Recipient shall: • Develop data collection test plan. • Troubleshoot any issues identified. • Collect data, information, and analysis and develop a Final Report which includes: o Total gross project costs. o Length of time from award of bus(es) to project completion. o Fuel usage before and after the project.

  • Budget Summary Other Sources (Page BudgetSum 2-3 - Acct 7000), must equal Other Uses (BudgetSum 2-3 - Acct. 8000). Estimated Beginning Fund Balance July,1 2020 for all Funds (Cells C3 - K3) (Line must have a number or zero. Do not leave blank.) OK Estimated Activity Fund Beginning Fund Balance July,1 2020 (Cell C83) (Cell must have a number or zero. Do not leave blank.) OK Transfer Among Funds (Funds 10, 20, 40 - Acct 7130 - Cells C29, D29, F29), must equal (Funds 10, 20 & 40 - Acct 8130 - Cells C52, D52, F52). OK Transfer of Interest (Funds 10 thru 90 - Acct 7140 - Cells C30:K30), must equal (Funds 10 thru 60, & 80 - Acct 8140 - Cells C53:H53, J53). OK Transfer to Debt Service to Pay Principal on Capital Leases (Fund 30 - Acct 7400 - Cell E39) must equal (Funds 10, 20 & 60 - Acct 8400 Cells C57:H60). OK Transfer to Debt Service to Pay Interest on Capital Leases (Fund 30 - Acct 7500 - Cell E40) must equal (Funds 10, 20 & 60 - Acct 8500 - Cells C61:H64). OK Transfer to Debt Service Fund to Pay Principal on Revenue Bonds (Fund 30 - Acct 7600 - Cell E41) must equal (Funds 10 & 20 - Acct 8600 - Cells C65:D68). OK Transfer to Debt Service to Pay Interest on Revenue Bonds (Fund 30 - Acct 7700 - Cell E42) must equal (Funds 10 & 20 - Acct 8700 - Cells C69:D72). OK Transfer to Capital Projects Fund (Fund 60 - Acct 7800 - Cell H43) must equal (Fund 10 & 20, Acct 8800 - Cells C73:D76). OK

  • Disturbance Analysis Data Exchange The Parties will cooperate with one another and the NYISO in the analysis of disturbances to either the Large Generating Facility or the New York State Transmission System by gathering and providing access to any information relating to any disturbance, including information from disturbance recording equipment, protective relay targets, breaker operations and sequence of events records, and any disturbance information required by Good Utility Practice.

  • COMPENSATION ANALYSIS After the expiration of the second (2nd) Renewal Term of this Agreement, if any, a Compensation Analysis may be performed. At such time, based on the reported Total Gross Revenue, performance of the Concession, and/or Department’s existing rates for similarly- performing operations, Department may choose to increase the Concession Payment for the following Renewal Term(s), if any.

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

Time is Money Join Law Insider Premium to draft better contracts faster.