BILLING AND BUDGET Sample Clauses

BILLING AND BUDGET. This Agreement is for provision of: (Check A. or B. and when applicable C.)
AutoNDA by SimpleDocs
BILLING AND BUDGET. This Agreement is for provision of: (Check A. or B. and when applicable C.)  A. Services Controlled by the DHMH Human Services Agreements Manual If this Agreement is for the provision of human services using a cost reimbursement methodology, the Department of Public Safety and Corrections must submit payment requests in the manner prescribed in the Department's Human Services Agreements Manual, using the DHMH 437 billing forms package. For such human services agreements, the Department of Public Safety and Corrections must also complete a DHMH 432 budget package and enclose it with this Agreement. This completed 432 budget package is deemed to be an incorporated part of this Agreement, as indicated by its reference in Section VII. Payment shall be limited to reimbursement of actual costs as identified by the Department of Public Safety and Corrections on form DHMH 440 end of year reconciliation.  B. Other Services Billing and Budget If this Agreement is for the provision of services which are not controlled by the Human Services Agreements Manual, the submission of a detailed budget, in which indirect cost is specifically identified, is required. This completed budget will be deemed to be an incorporated part of this Agreement, as indicated by its reference in Section VII.  C. Services Provided by any Other State Agency If this agreement is with another agency of the State of Maryland, both parties agree to comply with the directives of the Comptroller of the State of Maryland concerning payment for inter-agency agreements. Payment to the Department of Public Safety and Corrections under this agreement will be made via the Financial Management Information System (FMIS) of the State Comptroller's Office, using an Interagency Transfer. The shall include the following information on all invoices:

Related to BILLING AND BUDGET

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. Purchaser may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net scale in percentage of gross scale, or based on the merchantability factor, whichever is stated in A2. If necessary to assess extent of defect, Purchaser shall make sample saw cuts or wedges. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • Annual Work Plan and Budget 1. The Recipient shall, not later than November 30th of each year, prepare and furnish to the Association an annual work plan and budget (“Annual Work Plan and Budget”) for the Project for the subsequent year, said Annual Work Plan and Budget of such scope and detail as the Association shall have reasonably requested.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Annual Work Plans and Budgets The Recipient shall furnish to the Association as soon as available, but in any case not later than September 1 of each year, the annual work plan and budget for the Project for each subsequent year of Project implementation, of such scope and detail as the Association shall have reasonably requested, except for the annual work plan and budget for the Project for the first year of Project implementation, which shall be furnished no later than one (1) month after the Effective Date.

  • TESTING AND COMMISSIONING 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73

  • Budget The System Agency allocated share by State Fiscal Year is as follows:

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Timeline Contractor must perform the Services and deliver the Deliverables according to the following timeline: • •

  • METERING AND BILLING Metering requirements and billing procedures shall be set forth in the AEC rate schedule(s) applicable to the electric service account assigned to the location where the Generating Facility is connected.

Time is Money Join Law Insider Premium to draft better contracts faster.