-- CONTRACTOR PROVIDED EQUIPMENT Sample Clauses

-- CONTRACTOR PROVIDED EQUIPMENT. In order to introduce the Contractor's branded concepts for preparation and service, the Contractor may install its own equipment, fixtures, or furnishings within the Dining Facilities. Installation of Contractor owned equipment shall require prior written authorization from the ACOR. The ACOR will require installation drawings, plans, or other information needed to evaluate the installation. If additional electric power, water, steam or other changes to the Dining Facility are required to support the installation and maintenance, the cost shall be borne by the Contractor. PERFORMANCE REQUIREMENT XXXXXX Performance Requirement Summary (PRS) Fort Xxxxxxxx Food Service-Dining Facility Attendant Service: Statements Standards/AQLs Incentive/Remedy
AutoNDA by SimpleDocs
-- CONTRACTOR PROVIDED EQUIPMENT. All service trucks must not exceed the manufacturer's GVWR and GAWR when fully equipped.
-- CONTRACTOR PROVIDED EQUIPMENT. Mobile Chainsaw Repair Unit shall meet all standards established by specification or incorporated by reference and shall be maintained in good repair by the Contractor. .
-- CONTRACTOR PROVIDED EQUIPMENT. D.2.1.1 -- Equipment Typing. (The typing on these tables is from lowest to highest horsepower.) .
-- CONTRACTOR PROVIDED EQUIPMENT. Mobile Sleeper Units shall meet all standards established by specification or incorporated by reference and shall be maintained in good repair by the Contractor. .
-- CONTRACTOR PROVIDED EQUIPMENT. D.2.1.1 -- Minimum Equipment Requirements.
-- CONTRACTOR PROVIDED EQUIPMENT. D.2.1.1 -- Minimum Requirements.
AutoNDA by SimpleDocs
-- CONTRACTOR PROVIDED EQUIPMENT. (a)Mechanical Refrigeration Unit.
-- CONTRACTOR PROVIDED EQUIPMENT. The Contractor shall supply, at Contractor’s own expense, all equipment necessary to handle, push, spread, sort, grind, chip, process, screen, provide dust control, and otherwise perform the requirements of this Agreement. The equipment utilized must be specifically designed for the use intended. Modified or “built-up” equipment will not be acceptable. The Contractor shall properly protect the equipment and place it in the charge of competent operators.
-- CONTRACTOR PROVIDED EQUIPMENT. D.2.1.1 -- Equipment Typing.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!