Design Concept Conference. In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document the Design Concept Conference (DCC) to be held prior to the 30 percent milestone submittal. In preparation for the DCC, the Engineer shall complete a State’s Design Summary Report to serve as a checklist for the minimum required design considerations. The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on:
AutoNDA by SimpleDocs
Design Concept Conference. In accordance with the State's Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document a Design Concept Conference (DCC). In preparation for the DCC, the Engineer shall complete a State's Design Summary Report to serve as a checklist for the minimum required design considerations. The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on:  Roadway and drainage design parameters  Engineering and environmental constraintsProject development scheduleOther issues as identified by the State  Identify any Design Exceptions and waivers  Preliminary Construction Cost Estimate
Design Concept Conference. In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document the Design Concept Conference (DCC) to be held prior to the 30 percent milestone submittal. In preparation for the DCC, the Engineer shall complete a State’s Design Summary Report to serve as a checklist for the minimum required design considerations. The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on: • Roadway and drainage design parameters • Engineering and environmental constraints DocuSign Envelope ID: CB7B82B2-FA3B-4DDD-957A-C5AE0E5F436A Contract No. 24-8IDP5005 PSoft Contract No. 8064 • Project development scheduleOther issues as identified by the State • Identify any Design Exceptions and Waivers • Preliminary Construction Cost Estimate
Design Concept Conference. In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document a Design Concept Conference (DCC) to be held prior to the 60 percent milestone submittal. In preparation for the DCC, the Engineer shall evaluate and update the State’s Design Summary Report prepared by AIA Engineering Ltd. to serve as a checklist for the minimum required design considerations. DocuSign Envelope ID: 2A7B488B-5C00-44C6-9BDC-02741E62A6F2 The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on:
Design Concept Conference. In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the State, shall DocuSign Envelope ID: 82ABE615-A8AB-4523-B50C-6FA5DBECD719 plan, attend and document the Design Concept Conference (DCC) to be held prior to the 30 percent milestone submittal. In preparation for the DCC, the Engineer shall complete a State’s Design Summary Report to serve as a checklist for the minimum required design considerations. The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on: • Roadway, drainage and bridge design parameters • Traffic, ITS, other engineering and environmental issuesPublic involvement strategy and approach • Aesthetic concepts • Project development scheduleOther issues as identified by the State • Identify any Design Exceptions and Waivers • Preliminary Construction Cost Estimate
Design Concept Conference. The Engineer shall submit the updated preliminary Design Summary Report (DSR) to the State for review and approval and shall attend an initial PS&E Kick-Off Meeting to review and agree on fundamental aspects and concepts and to review the basic features and design criteria for the project. This meeting will be coordinated with any adjacent projects to ensure continuity.
Design Concept Conference. In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the County and State, shall plan, attend and document the Design Concept Conference (DCC) to be held prior to the 30 percent milestone submittal. In preparation for the DCC, the Engineer shall complete a State’s Design Summary Report to serve as a checklist for the minimum required design considerations. The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on: • Roadway and drainage design parameters • Engineering and environmental constraintsProject development scheduleOther issues as identified by the County • Identify any Design Exceptions and Waivers • Preliminary Construction Cost Estimate
AutoNDA by SimpleDocs
Design Concept Conference. In accordance with the TxDOT’s Project Development Process Manual, in cooperation with the City/TxDOT, plan, attend and document the Design Concept Conference (DCC) to be held prior to the 30 percent milestone submittal. In preparation for the DCC, complete TxDOT’s Design Summary Report to serve as a checklist for the minimum required design considerations. The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on:
Design Concept Conference. In accordance with TxDOT’s Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document the DCC to be held prior to the 30% PS&E milestone submittal. In preparation for the DCC, the Engineer shall update the DSR to serve as a checklist for the minimum required design considerations. The conference will provide for a brainstorming session in which decision makers, stakeholders and technical personnel may discuss and agree on:  Roadway and drainage design parameters  Engineering and environmental constraintsProject development scheduleDesign Exceptions and Waivers  Other issues as identified by the State FUNCTION CODE 120 (120) – SOCIAL, ENVIRONMENTAL, AND PUBLIC INVOLVEMENT
Design Concept Conference. A design concept conference shall be held in accordance with the State’s Project Development Process Manual and include review of a Design Summary Report will serve as a checklist for the minimum required design considerations including roadway and drainage design parameters, engineering and environmental constraints, project development schedule, etc.