EMPLOYER’S WORKS INFORMATION Sample Clauses

EMPLOYER’S WORKS INFORMATION. Contents When the document is complete, insert a ‘Table of Contents’. To do this go to: Insert, → Reference, → Index and tables → Table of Contents. Three levels and the title (but not the subtitle) may be shown if the formats used in this template are retained.
AutoNDA by SimpleDocs
EMPLOYER’S WORKS INFORMATION. Part 3: Scope of Work 27 C3.1: Employer’s Works Information 28 1 Description of the works 31
EMPLOYER’S WORKS INFORMATION. C3.2 Contractor’s Works Information1 Total number of pages . TABLE OF CONTENTS Clause number and description Page Part 3: Scope of Work 29 C3.1: Employer’s works Information 30 1. Description of the works 30
EMPLOYER’S WORKS INFORMATION. Contents 1 Description of the works 33
EMPLOYER’S WORKS INFORMATION. 1 Description of the works The works are the design, manufacture, supply, packaging, transportation, delivery to the Site, of new paging system, the removal of existing old Plant and Materials, installation of new Plant and Materials, testing and commissioning of the new installed paging system for Modification 11020 DTV (the replacement of the paging system) as per TRS 240-134664990 (herein refered to as TRS 11020 Rev 2).
EMPLOYER’S WORKS INFORMATION. 1. Description of the works [provide a general description of the works, including the general arrangements and location drawings. Sufficient information should be included so as to enable the tenderer to determine whether they have the resources and capability to carry out the work] Description of the Work / Services: The project scope includes the following: Design and construct the canopy structure or similar approved structure that will be able to protect passengers from adverse weather conditions. The scope will entail design including conceptual designs by the Architect (proposals to be submitted to ACSA with different canopy arrangement or equivalent shelter structure. The agreed structure will have to be designed and signed off by a registered Engineer. This project will further include procurement of material and construction supervision (EPCM model). Design is to address the following deliverables: -
EMPLOYER’S WORKS INFORMATION. Description of the works Executive overview Construction Services – Blesbok and Bosbok subcontracting of demolition of garages and paving removal, storm water line installation, layer works, installation of paving, new Guard house, aprons around the buildings and palisade fencing . .
AutoNDA by SimpleDocs
EMPLOYER’S WORKS INFORMATION. Description of the works Executive overview The scope of work includes the following for all six units at Xxxxx Power Station:  Modification of the existing air supply line to the snooper line system;  Installation of new air supply line from existing control air system up to existing fire protection valve;  Supply and installation of isolating valve and 3/2 way solenoid valve upstream of new air supply line connection to fire protection valve;  Install cabling from the DCS to the solenoid valve;  Updating the logics on the control system controllers for the solenoid trip signal;  Updating the logics on the control system controller for the 3 oil pumps to not use the pressure reading to trip but us the solenoid trip signal from the operator on order to trip;  Updating the HMI on the control system servers; Employer’s objectives and purpose of the works The objective of the modification is to eliminate spurious trips by changing the automatic tripping of the snooper system to a critical alarm which shall notify the operator of a pressure drop in which case the operator will confirm whether it is a fire before he manually trips the turbine and the three power oil pumps. The operator will dump the air supply to the fire protection valve which will then automatically drain the control oil and subsequently trips the turbine. Interpretation and terminology The following abbreviations are used in this Works Information: Abbreviation Meaning given to the abbreviation CA Compressed Air UCLF Unplanned Capability Loss Factor ECN Engineering Change Notification EDMS Engineering Document Management System Management and start up. Management meetings During installation, daily meetings will be held at the Employer’s Site. The times for the meeting will be as per agreement by both parties. Ad-hoc meetings may be called by the Project Manager as the need arises i.e. compensation event meeting, assessment meeting. Regular meetings of a general nature may be convened and chaired by the Project Manager as follows: Meetings of a specialist nature may be convened as specified elsewhere in this Works Information or if not so specified by persons and at times and locations to suit the Parties, the nature and the progress of the works. Records of these meetings shall be submitted to the Project Manager by the person convening the meeting within five days of the meeting. All meetings shall be recorded using minutes or a register prepared and circulated by the person who con...
EMPLOYER’S WORKS INFORMATION. 1. Description of the works In brief, the contractor shall be responsible for maintenance of airside pavements and paint markings at O.R Tambo International Airport as and when required. The NEC3 Term Service Contract, April 2013 general conditions of contract shall apply. The objective is to maintain the serviceability of the infrastructure at ORTIA in a sustainable manner at the lowest operating and maintenance costs while ensuring compliance to general safety and aviation related legislation. The nature of the contract is as follows:
EMPLOYER’S WORKS INFORMATION. 1 Description of the works The Kriel Power Station is situated approximately half way between Bethal and Ogies on the R545, being just over 30 km from each town and 10 km north-west of Kriel town.