Environmental Assessment and Approval Process Sample Clauses

Environmental Assessment and Approval Process. Regulatory approval of development projects is undertaken by the National Directorate for Environment (NDE) under Decree-Law 5/2011 Environmental Licencing that defines the environmental licensing system for public and private projects that are likely to produce environmental and social impacts. The licensing system sets out the process, procedures, roles and responsibilities of the Project Proponent. The Project ‘proponent’ is defined as “a person, including a legal person, both public and private, who requires a licence to carry out a project” in the Decree. The port proponent will be the private sector entity awarded the concession by GoTL to design, build and operate the Port (the ‘Concessionaire’). The EIA process commences when the project proponent prepares a Project Document (PD) and submits this to NDE. The PD identifies the proponent, describes the project, outlines the major likely impacts, provides layout drawings and site maps, and provides copies of any permits or government support already obtained. This has been completed by the Ministry of Transport and Communication as of May 2014. In accordance with Decree-Law 5/2011, Tibar Bay Port is classified as a Category A development as it has “the potential to cause significant adverse impacts”, and therefore requires a detailed EIA. For Category A projects the proponent must prepare a Scoping Report and Draft ToR for the EIA for review by GoTL. GoTL has a maximum of 10 Business Days to review the ToR and provide comments to the proponent. The Scoping Study was completed in October 2013, and this document is the draft ToR. The proponent – in this case the selected Concessionaire – then prepares the Draft EIA in compliance with the approved ToR, incorporating an Environmental Management Plan (EMP), and submits this to NDE for assessment. NDE establishes an Evaluation Committee consisting of representatives of relevant agencies and institutions to review the Draft EIA, and the report is made available for public review. The maximum Draft EIA review period, including technical review and consultation, is 50 days. The Final EIA is prepared by the proponent taking into account the comments received from the Evaluation Committee’s technical review and public consultation, then submitted to NDE for approval. If the project is approved, an Environmental Permit is issued and may contain conditions of consent, including the requirement to implement the mitigation and monitoring measures set out in the EIA,...
AutoNDA by SimpleDocs

Related to Environmental Assessment and Approval Process

  • Environmental Assessment and Mitigation Development of a transportation project must comply with applicable environmental laws. The party named in article 1, Responsible Parties, under AGREEMENT is responsible for the following:

  • Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other xxxxx or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test xxxxx or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.

  • Environmental Audit Upon reasonable notice, Director shall have the right but not the obligation to conduct or cause to be conducted by a firm acceptable to Director, an environmental audit or any other appropriate investigation of the Premises for possible environmental contamination. Such investigation may include environmental sampling and equipment and facility testing, including the testing of secondary contamination. No such testing or investigation shall limit Tenant’s obligations hereunder or constitute a release of Tenant’s obligations therefor. Tenant shall pay all costs associated with said investigation in the event such investigation shall disclose any Hazardous Materials contamination as to which Tenant is liable hereunder.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • Environmental Compliance The Borrower and its Subsidiaries conduct in the ordinary course of business a review of the effect of existing Environmental Laws and claims alleging potential liability or responsibility for violation of any Environmental Law on their respective businesses, operations and properties, and as a result thereof the Borrower has reasonably concluded that such Environmental Laws and claims could not, individually or in the aggregate, reasonably be expected to have a Material Adverse Effect.

  • Environmental Remediation Failure to remediate (or pursue the remediation process with due diligence and good faith) within the time period required by law or governmental order, (or within a reasonable time in light of the nature of the problem if no specific time period is so established), environmental problems in violation of Applicable Law related to Properties of the Borrower and/or its Subsidiaries where the estimated cost of remediation is in the aggregate in excess of Seventy-Five Million Dollars ($75,000,000), in each case after all administrative hearings and appeals have been concluded.

  • Environmental Review (a) Buyer shall have the right to conduct or cause a consultant (“Buyer’s Environmental Consultant”) to conduct an environmental review of the Assets and Seller’s records pertaining to the Assets (as set forth in Section 3.01) prior to the expiration of the Examination Period (“Buyer’s Environmental Review”). The cost and expense of Buyer’s Environmental Review, if any, shall be borne solely by Buyer. The scope of work comprising Buyer’s Environmental Review shall not include any intrusive test or procedure without the prior written consent of Seller. Buyer shall (and shall cause Buyer’s Environmental Consultant to): (i) consult with Seller before conducting any work comprising Buyer’s Environmental Review, (ii) perform all such work in a safe and workmanlike manner and so as to not unreasonably interfere with Seller’s operations and (iii) comply with all applicable laws, rules, and regulations. Seller shall use commercially reasonable efforts to obtain any Third Party consents and otherwise cooperate with Buyer in conducting Buyer’s Environmental Review and any activities related thereto. Seller shall have the right to have a representative or representatives accompany Buyer and Buyer’s Environmental Consultant at all times during Buyer’s Environmental Review. With respect to any samples taken in connection with Buyer’s Environmental Review, Buyer shall take split samples, providing one of each such sample, properly labeled and identified, to Seller. The Parties shall execute a “common undertaking” letter regarding the confidentiality for the Environmental Review where appropriate. Buyer hereby agrees to release, defend, indemnify and hold harmless Seller from and against all claims, losses, damages, costs, expenses, causes of action and judgments of any kind or character (INCLUDING THOSE RESULTING FROM SELLER’S SOLE, JOINT, COMPARATIVE OR CONCURRENT NEGLIGENCE OR STRICT LIABILITY) to the extent arising out of Buyer’s Environmental Review. Buyer hereby covenants and agrees that it will have at least $2,000,000 of general liability insurance to cover its indemnification hereunder prior to the commencement of the Environmental Review.

  • Environmental Contamination Neither Party shall in any event be liable to the other Party for any costs whatsoever resulting from the presence or release of any environmental hazard such Party did not cause or contribute to causing. Each Party shall, at the other Party's request, indemnify, defend, and hold harmless the other Party, each of its officers, directors and employees from and against any losses, damages, claims, demands, suits, liabilities, fines, penalties and expenses (including reasonable attorneys fees) that arise out of or from (i) any environmental hazard that such Party, its contractors or agents caused in the work locations or (ii) the presence or release of any environmental hazard for which such Party is responsible under Applicable Law. In the event both Parties contribute to such environmental hazard, they shall each proportionately bear such liability.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.