ESTIMATED COSTS OF INTERCONNECTION FACILITIES. The total estimated costs (+30%/-15%) of the work associated with the Interconnection Facilities required for the interconnection of the Small Generating Facility are presented in the table below.
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. The total estimated costs (+30%/-15%) of the work associated with the Interconnection Facilities required for the interconnection of the Small Generating Facility are presented in the table below. As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; • all major material is delivered to site (i.e., no costs are included for transport from storage); and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes; • line switching; • property/easement acquisitions; • access roads and associated matting; • future operation and maintenance costs; • recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility; • soil testing; • adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions; • environmental mitigation; • extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve; • extended craft labor hours, to minimize outage and/or construction time; or • any required permits. Cost adders estimated for overtime will be based on 1.5 and 2 times labor rates if required for work beyond normal business hours. Meals and equipment are also extra costs incurred for overtime labor.
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. The total estimated costs (+30%/-15%) of the work associated with the Interconnection Facilities required for the interconnection of the Small Generating Facility are presented in the table below. Interconnection Customer Interconnection Facilities Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field verification, and witness testing $75,500 Connecting Transmission Owner Interconnection Facilities (CTO IF) Engineering, design, construction, testing and commissioning for revenue metering and EMS-RTU at Collector Station and line tap. EMS-RTU & Rev. MeteringLine Tap $183,300 $1,328,200 CTO IF Subtotal $1,511,500 Inter. Facilities Subtotal $1,587,000 Contingency $428,900 INTER. FACILITIES TOTAL $2,015,900 As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: 5X10 construction work week; outages are available; all major material is delivered to site (i.e., no costs are included for transport from storage); and existing equipment to remain is functional. Exclude (as applicable): discussions and negotiations of issued interconnection study; application fees; applicable surcharges; overall project sales tax; property taxes; line switching; property/easement acquisitions; access roads and associated matting; future operation and maintenance costs; recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility; soil testing; adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions; environmental mitigation; extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve; extended craft labor hours, to minimize outage and/or construction time; or any required permits. Cost adders estimated for overtime will be based on 1.5 and 2 times labor rates if required for work beyond normal business hours. Meals and equipment are also extra costs incurred for overtime labor.
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. The total estimated costs (+30%/-15%) of the work associated with the Interconnection Facilities required for the interconnection of the Small Generating Facility are presented in the table below. Q731 Xxxxxxxxx Solar Project Facilities Study Estimate
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. Description Estimated Costs Connecting Transmission Owner’s Interconnection Facilities $635,000 Total $635,000
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. SERVICE AGREEMENT NO. 2591 The total estimated costs (+30%/-15%) of the work associated with the Interconnection Facilities required for the interconnection of the Small Generating Facility are presented in the table below. As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; • permitting is not required; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges;
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. The total estimated costs (+30%/-15%) of the work associated with the Interconnection Facilities required for the interconnection of the Small Generating Facility are presented in the table below. As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; • permitting is not required; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study, • application fees, • applicable surcharges, • overall project sales tax, • property taxes, • line switching, • property/easement acquisitions, • future operation and maintenance costs, • recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility, • soil testing, • adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions, • environmental mitigation, • extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve, • extended craft labor hours, to minimize outage and/or construction time, or • any required permits. Cost adders estimated for overtime will be based on 1.5 and 2 times labor rates if required for work beyond normal business hours. Meals and equipment are also extra costs incurred for overtime labor.
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. Interconnection Customer Interconnection Facilities (ICIF) Engineering review and compliance verification of the ICIFs and JOIFs, including all required drawing and equipment spec reviews, relay settings, construction and testing assistance by engineers, as applicable. $59,000 Connecting Transmission Owner Interconnection Facilities Engineering, design, installation and testing for revenue metering and RTU. $205,000 All estimated costs include a +/- 25% contingency Security to be Posted: Interconnection Customer will provide security to the Connecting Transmission Owner in the amount of $205,000 pursuant to Section 6.3 of the Interconnection Agreement for Connecting Transmission Owner’s Interconnection Facilities, which is in addition to the security in the amount of $484,500 previously posted by the Interconnection Customer for System Upgrade Facilities pursuant to Attachment S of the NYISO OATT.
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. The total estimated costs (+30%/-15%) of the work associated with the Interconnection Facilities required for the interconnection of the Small Generating Facility are presented in the table below. As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: SERVICE AGREEMENT NO. 2550 Assume: • 5X10 construction work week; • outages are available; • all major material is delivered to site (i.e., no costs are included for transport from storage); and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes; • line switching; • property/easement acquisitions; • access roads and associated matting; • future operation and maintenance costs; • recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility; • soil testing; • adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions; • environmental mitigation; • extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve; • extended craft labor hours, to minimize outage and/or construction time; or
ESTIMATED COSTS OF INTERCONNECTION FACILITIES. No new facilities are expected to be constructed by the Connecting Transmission Owner. Customer construction document review, site review and witness testing of customer equipment are the only activities required of the Connecting Transmission Owner. This is estimated to be a cost of $0 to the Interconnection Customer and will be reconciled to the actual costs at project completion. A refund or further invoice will be generated based on the actual costs. Attachment 3 - One-line Diagram Depicting the Small Generating Facility,Interconnection Facilities, Metering Equipment, and Upgrades Attachment 4 - Milestones In-Service Date: July 12, 2021 Critical milestones and responsibility as agreed to by the Parties: Milestone/Date Responsible Party