Infrastructure Development Project. The Infrastructure Development Project will rehabilitate, upgrade and modernize ESCOM’s generation, transmission and distribution assets in most urgent need of repair, in order to preserve existing generation, improve the capacity of the transmission system, and increase the efficiency and sustainability of hydropower generation. To facilitate the development and implementation of the Program, MCC is providing support for the Government’s ability to identify and prioritize investments in the sector by developing an integrated resource plan. MCC Funding will support significant investments in the power system infrastructure to preserve generation and stabilize and modernize the transmission and distribution network. The Infrastructure Development Project is only viable, technically and economically, if the Government and ESCOM maintain current generation assets and expand the generation capacity of the power system. Under the Infrastructure Development Project, the Government will invest in new generation by completing the construction of the Kapichira II hydropower plant. Additionally, the Government will continue to seek to attract sustainable investment from the private sector and other donors to add significant amounts of new generation to the system. The Parties expect that by the end of the Compact Term, the Infrastructure Development Project, together with the Government’s commitment to complete construction of Kapichira II, will result in increases in generation capacity (from 286 MW to approximately 352 MW), network throughput capacity (from 310 MW to approximately 960 MW) and distribution capacity (from 868 MVA to approximately 1,078 MVA), and a reduction of total system losses from 20-25 percent to 18 percent.
AutoNDA by SimpleDocs
Infrastructure Development Project. The evaluation will attempt to assess the effectiveness of individual transmission lines and distribution investments in reducing outages and improving power quality using a combination of approaches, to include potentially an interrupted time series approach, exogenous spatial variation due to the project, combined if sufficiently informative with phased implementation of distribution projects. The incremental impacts of improved reliability, quality and access to power will be explored by comparing key intermediate outcomes, including changes in business investments and productivity, between businesses with access to infrastructure improvements, those without access to improvements, and for those in areas or zones that experience greater or lesser improvements in electricity due to differential levels of infrastructure upgrading. Gender disaggregated information will be pursued to the extent possible.

Related to Infrastructure Development Project

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Construction Development of the Project The Allottee has seen the proposed layout plan/demarcation-cum-zoning/sanctioned plans, / site plan / building plan, specifications, amenities and facilities, etc. depicted in the advertisement / brochure / agreement / website (as the case may be) regarding the Project where the Said Independent Floor for residential usage along with parking is located and has accepted the floor / site plan, Payment Plan and the specifications, amenities, facilities, etc. [annexed along with this Agreement] which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the bye-laws such as Haryana Building Code, 2017, FAR, density norms, provisions prescribed, approved plans, terms and condition of the license/ allotment as well as registration of RERA, etc. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the provisions and norms prescribed by the relevant State laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act and Rules made thereunder or as per approvals/instructions/ guidelines of the competent authorities, and any breach of this term by the Promoter shall constitute a material breach of the Agreement.

  • Project Development a. Collaborate with COUNTY and project clients to identify requirements and develop a project Scope Statement.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.