Lighting Retrofit Project Sample Clauses

Lighting Retrofit Project. The Main Campus Electric usage Baseline was established from the highest usage Main Campus electric utility meters. The table below indicates the electric meters Consumption and Demand used in the Main Campus Electric Baseline. Only one electric meter usage table is shown as it represents 93% of the Main Campus electric usage and establishes the electric Baseline for the Main Campus Lighting Retrofit FIM. This baseline is used with the Main Campus Lighting Sensors FIM as well. Table 5.2.1 - Main Campus 2015 Electric Utility Baseline – All Meters Facility Account Rate Tariff Annual kWH Annual kW % of Total Main Campus Electric Large Demand 10,191,600 26736 92.96% #19-University Ctr. General Service Demand 179,440 458 1.64% Xxxx. 00 XXXX(Xxxxxxxx Xxxxxxxxxxxxx) General Service Demand 158,208 605 1.44% NW Annex, BLDG, 54, 55,56 General Service Non-Demand 97,600 0.89% Xxxx. # 00 Baseball Fieldhouse General Service Demand 83,040 399 0.76% Xxxx. # 00 Xxxxxxxxx Xxxxxxxxxx Xxxx. General Service Non-Demand 69,110 0.63% Xxxx. # 00-Xxxxxxxx General Service Non-Demand 43,520 0.40% Xxxxxxxxxx Bldg. General Service Non-Demand 27,460 0.25% Xxxxx Xxxx.-Combined General Service Non-Demand 25,767 0.24% 32 Baseball Field Lights General Service Demand 23,808 1867 0.22% Xxxx. # 00 Xxxxxxx Xxxx. General Service Non-Demand 16,586 0.15% # 52, Superior Mech. General Service Non-Demand 15,934 0.15% Bldg. # 50-Orkin Bldg. General Service Non-Demand 15,920 0.15% Xxxx. 00 Xxxxxxx Xxxxx house General Service Demand 8,762 333 0.08% NW Annex, BLDG, 54, 55,56 - Lighting General Service Non-Demand 1,760 0.02% SIGN # 2 General Service Non-Demand 1,557 0.01% Bldg. # 46-Xxxxxx - Lighting Commercial Lighting 1,555 0.01% #53-Artcraft Printer General Service Non-Demand 1,360 0.01% Xxxx. # 00 Xxxxxxx Xxxx. General Service Non-Demand 699 0.01% SIGN # 1 General Service Non-Demand 148 0.00% X. Xxxx Sign (1) General Service Non-Demand 7 0.00% Xxxxxxxxxx Building # A General Service Non-Demand 0 0.00% Totals 10,963,841 30,398 Table 5.2.2 - Main Campus 2015 Electric Utility Baseline – Main Campus Meter Month Energy (kWh) Demand (kW) Jan 693,600 1944 Feb 664,800 1704 Mar 808,800 1692 Apr 657,600 1944 May 810,000 1944 Jun 808,800 2340 Jul 1,028,400 2604 Aug 973,200 2664 Sep 1,101,600 2340 Oct 960,000 2544 Nov 787,200 2136 Dec 897,600 2388 Totals 10,191,600 26,244 The FPSI Campus Electric usage Baseline was established from FPSI Campus electric utility meters. The table below indicates the electric meters...
AutoNDA by SimpleDocs
Lighting Retrofit Project. Measurement & Verification Option A/E This facility improvement measure will be implemented throughout the TCC Main, Ghazvini and FPSI campuses. For a detailed room by room description per building, see the Exhibit A lighting retrofit section. Electrical energy and demand savings will be produced from this FIM. Cooling energy savings for the HVAC system is an additional benefit of the lighting retrofit. The variables affecting savings from this lighting FIM are fixture wattages, hours of operation, and level of coincident operation. Pre-retrofit and post-retrofit fixture wattages will be determined from a standard table of wattages or from manufacturer’s data or from actual measurements and annual operating hours will be estimated based on CLIENT-provided data, which was verified during the Site Investment Grade Audit (“IGA”). Option A has been selected for this FIM due to the high confidence with which the fixture demand and operating hours can be determined. Equipment numbers and locations will not vary, and operating hours are not projected to change after the FIM is implemented. SIEMENS uses Option A because of the ability for the isolation of the key parameter, wattage of the lighting fixture, which is affected during the retrofit. Wattage reduction in lighting fixtures is the primary parameter for energy savings for this FIM. Cooling savings resulting from the lighting retrofit have been calculated using standard industry practices and will not be measured; these savings are to be reported under Option E. The following table shows the M&V summary expected from this FIM: Table 4.3.1 - M&V Guaranteed Savings Summary for All Campus Lighting Retrofit M&V Savings Summary – Lighting Retrofit – TCC All Campuses - City of Tallahassee Utility Electric Energy Reduction (kWh) Electric Power Reduction (kW) Natural Gas Reduction (Therms) Water and Sewer Consumption Reduction (kGals) Calculated Cooling Energy Savings (kWh) Operational Savings Total Reduction (Dollars) Units 2,182,189 7,021 - - 421,498 Rate* $0.0634 $11.7431 $0.0000 $0.0000 $0.0642 Dollars $138,304 $82,454 $0 $0 $27,079 $40,173.00 $288,010 Table 4.3.2 - M&V Guaranteed Savings Summary for the Main Campus Lighting Retrofit M&V Savings Summary – Lighting Retrofit – TCC Main Campus - City of Tallahassee Utility Electric Energy Reduction (kWh) Electric Power Reduction (kW) Natural Gas Reduction (Therms) Water and Sewer Consumption Reduction (kGals) Calculated Cooling Energy Savings (kWh) Operational Sav...

Related to Lighting Retrofit Project

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Safety Boot Allowance ‌ Effective January 1, 2022, except for temporary and probationary employees, the Employer agrees to pay one hundred and eighty-five dollars ($185.00) in January of each year towards the cost of safety boots for each full time employee requiring them and one hundred ($100.00) dollars for each part time employee requiring them under the Occupational Health and Safety Act and/or by the Employer, provided the Employee is not eligible for safety footwear through the Workplace Safety and Insurance Board.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

Time is Money Join Law Insider Premium to draft better contracts faster.