Option 1 (Phase II) – Enhanced Design Sample Clauses

Option 1 (Phase II) – Enhanced Design. During Option 1, July 1, 2007 – December 31, 2011, the Contractor shall: (1) Conduct surveillance and maintenance for the 3019 Complex to ensure safety, security, and compliance. (2) Complete design for construction and operation of the dissolution and down-blending systems within the 3019A facility. (3) Initiate planning for program transfer and direct disposal of material, including preparation for contractor readiness activities for material handling. (4) Coordinate with receiver facility to accept Zero Power Reactor plates in accordance with Contractor’s schedule. (5) Initiate Zero Power Reactor plate shipments for programmatic transfer to receiver facility. (6) Support analysis of processing alternatives. (7) Award contracts and/or Purchase Orders for items with advance DOE approval in accordance with FAR requirements. (8) Complete the Documented Safety Analysis (DSA) for surveillance and maintenance, material transfer, and dismantlement/construction (as required) activities and the corresponding TSR (D-9) for both Building 3019A and 3019B. (9) Complete the Safety Design Strategy (SDS) (D-8b), Preliminary Safety Design Report (PSDR) (D-8c) and PDSA (D-8a). (10) Suspend the 3019 Annex design and proof of process testing after the design subcontractor’s scheduled delivery of design documents on January 31, 2011. (11) Suspend 3166 Stack Design until further directed.
AutoNDA by SimpleDocs

Related to Option 1 (Phase II) – Enhanced Design

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Preliminary Design Phase 30 percent plans) A. Proceed with Preliminary Design Phase after the completion of the Conceptual phase which includes: Acceptance by Owner of the Conceptual Report and any other Study and Report Phase deliverables; selection by Owner of a recommended solution; issuance by Owner of any instructions for use of Project Strategies, Technologies, and Techniques, or for inclusion of sustainable features in the design, and Indication by Owner of any specific modifications or changes in the scope, extent, character, or design requirements of the Project desired by Owner. 1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary drawings, outline specifications, and written descriptions of the Project. 2. Include on plans, property lines, structure locations, ownership names and contact information. 3. In preparing the Preliminary Design Phase documents, use any specific applicable Project Strategies, Technologies, and Techniques authorized by Owner during or following the Study and Conceptual Phase, and include sustainable features, as appropriate, pursuant to Owner’s instructions. 4. Provide necessary field surveys, topographic and utility mapping for Engineer’s design purposes. Comply with the scope of work and procedure for the identification and mapping of existing utilities as defined by Section A1.03 “Utility Requirements” and Section A1.04 “Survey Services” 5. Visit the Site as needed to prepare the Preliminary Design Phase documents. 6. Advise Owner if additional reports, data, information, or services of the types described are necessary and assist Owner in obtaining such reports, data, information, or services. 7. Continue to assist Owner with Project Strategies, Technologies, and Techniques that Owner has chosen to implement. 8. Based on the information contained in the Preliminary Design Phase documents, prepare a revised opinion of probable Construction Cost, and assist Owner in tabulating the various cost categories which comprise Total Project Costs. 9. Obtain and review Owner’s instructions regarding Owner’s procurement of construction services (including instructions regarding advertisements for bids, instructions to bidders, and requests for proposals, as applicable), Owner’s construction contract practices and requirements, insurance and bonding requirements, electronic transmittals during construction, and other information necessary for the finalization of Owner’s bidding-related documents (or requests for proposals or other construction procurement documents), and Construction Contract Documents. Also obtain and review copies of Owner’s design and construction standards, Owner’s standard forms, general conditions, supplementary conditions, text, and related documents or content for Engineer to include in the draft bidding-related documents (or requests for proposals or other construction procurement documents), and in the draft Construction Contract Documents, when applicable. 10. Development communication plan for project: considering the use of door hangers, letters, public meetings, changeable message boards. 11. Furnish 6 review copies of the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables to Owner by established due date, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items. 12. Revise the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables in response to Owner’s comments, as appropriate, and furnish to Owner 6 copies of the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other deliverables by the specified due date. 13. Engineer’s services under the Preliminary Design Phase will be considered complete on the date when Engineer has delivered to Owner the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Development Program RWJPRI shall be [**] and have [**] in consultation with the JDAC, to select LICENSED COMPOUNDS which shall then be designated PRODUCTS for further DEVELOPMENT by RWJPRI and marketing by ORTHO and its AFFILIATES. RWJPRI shall provide KOSAN with written notice of its decision to select a LICENSED COMPOUND for DEVELOPMENT. Once a PRODUCT has been selected for further DEVELOPMENT, RWJPRI, with the advice of the JDAC, shall have the [**] right to develop the PRODUCT through STAGES O, I, II and III and shall have the [**] right to prepare and file, and shall be the owner of, all applications for MARKETING AUTHORIZATION throughout the world. During such DEVELOPMENT efforts, KOSAN will assist RWJPRI as may be mutually agreed, at RWJPRI's expense, in chemical development, formulation development, production of labeled material and production of sufficient quantities of material for STAGE O and initial STAGE I studies. RWJPRI shall exercise diligent efforts, commensurate with the efforts it would normally exercise for products with similar potential sales volume and consistent with its overall business strategy, in developing such PRODUCT in accordance with the DEVELOPMENT PLAN established by RWJPRI. In the course of such efforts RWJPRI shall, either directly or through an AFFILIATE or SUBLICENSEE to which the license shall have been extended, take appropriate steps including the following: (i) in consultation with the JDAC, select certain LICENSED COMPOUNDS for STAGE O DEVELOPMENT; and (ii) establish and maintain a program reasonably designed, funded and resourced to obtain information adequate to enable the preparation and filing with an appropriate and properly empowered national regulatory authority all necessary documentation, data and [**] CERTAIN INFORMATION IN THIS EXHIBIT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THE OMITTED PORTIONS. other evidence required for IND non-rejection to commence and conduct human clinical trials of such PRODUCT. (iii) proceed following IND non-rejection to commence PHASE I, II, and III clinical trials, associated studies and such other work which RWJPRI reasonably deems to be required for subsequent inclusion in filings for MARKETING AUTHORIZATION; (iv) after such submissions are filed prosecute such submissions and file all reasonably necessary, reports and respond to all reasonable requests from the pertinent regulatory, authorities for information, data, samples, tests and the like.

  • Research Term The term “

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Development Period The Contractor may commence pre-construction activities like utility shifting, boundary wall construction or any other activity assigned to the Contractor by the Authority to enable construction of the Project Highway immediately after signing of the Agreement, to the extent that such work is ready for execution. The Parties agree that these works may be taken up and completed to the extent feasible by the Contractor, before declaration of the Appointed Date, but no claim against the Authority for delay shall survive during this period and that the undertaking of these works by the Contractor shall not count towards the Scheduled Construction Period of the project which starts counting only from the Appointed Date. No construction activity of the Project Highway shall be undertaken during the development period.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!