Other Core Finishes Sample Clauses

Other Core Finishes. The following shall be required to be completed and installed at agreeable locations: (a) Women's and men's restrooms. Restrooms should be designed to provide flexibility in distribution of stalls between men's and women's, and at a minimum shall provide code required stalls plus 1 for men and women on each floor. At floors 15 through 22, the women's bathroom is provided with only code required stalls. Accessible restrooms shall be provided on each floor (or as required by the city); (b) If telephone closets have exposed steel columns with fireproofing material present, acoustical ceilings shall be installed. Plywood on walls shall be installed, as required, by Tenant; (c) Electrical closets with service and distribution panelboards and transformers 480/277V, 120/208V, (See Paragraph 9 below); (d) Core walls, columns and perimeter bulkhead completed with finished drywall ready for paint; (e) Water coolers shall be provided at a rate of one per 10,000 usable square feet at floors 3, 4, and 5 and one per 14,000 usable square feet at floors 15 through 30; (f) Fire sprinklers as required by code, based on 100% open office; (g) Exit signs as required per code, based on 100% open office; and capacity in electrical system to connect emergency egress lighting. (h) Passenger elevator lobby complete in all respects except finishes, including flat sheetrock ceiling, lighting, HVAC, sprinklers, alarms/detectors, call buttons and lanterns, etc. (i) Core corridor doors primed and ready to receive Tenant's finish; (j) Stairwell doors primed and ready to receive Tenant's finish; (k) Stairwells between floors serving Tenant shall have walls and railings finish painted one-half floor above top Tenant floor, and one-half floor below lowest Tenant floor. Such stairwells shall have lights at each floor landing; (l) Locking devices and closers for all exit, stairwell, and electrical/telephone doors. Stairwell doors shall have locking and unlocking devices; (m) Landlord will provide card readers at select perimeter building entry points, service elevators, low-rise elevator cabs and contacts at all stairwell doors, service elevator vestibules. (n) All ceiling space sufficiently clear of all pipes, ductwork, etc., to provide for a minimum finished ceiling height of nine feet. All base building systems shall be coordinated such that the intersection of the building structural system, medium pressure ductwork, the fire protection system and the base building light fixture will all ...
AutoNDA by SimpleDocs
Other Core Finishes. Drinking fountains, janitor's closets, electrical and mechanical rooms, bathrooms with sinks and toilets, fire exit stairwells and related areas shown on the Building plans to be finished to Building Standard condition. Specifically, the following will be completed: A. Ladies' and men's room complete. B. Telephone closets complete. C. Electrical closets complete with service and distribution panelboards and transformer 480/277v, 208/110v. D. Core walls with finished drywall ready for paint. E. Drinking fountains (two per floor). F. Fire extinguisher cabinets. G. Exit signs (two per floor). H. Painted Lobby elevator doors. I. Painted core corridor doors. J. Stained stairwell doors. K. Hardware and closers for all exit, stairwell and electrical/telephone doors and ladies'/ men's toilets. L. Space clear of all pipes, Base Building ductwork, etc., for ceiling height in accordance with the Base Building plans. M. All pipe sleeves in beams and walls to be sealed where required by code. N. Fire and life safety requirements per county and state codes. O. Ground level public areas complete (elevator lobbies, landscaping, truck dock, fan room, etc.). P. Mechanical, electrical, elevator, Base Building systems, complete as shown on base building plans. Q. All general exhaust required by applicable laws.
Other Core Finishes. Drinking fountains, janitor’s closets, electrical and mechanical rooms, bathrooms with sinks and toilets, fire exit stairwells and related areas shown on the Building plans to be finished to Building Standard condition. Landlord is to be responsible for all base Building conformance to ADA and all required zoning and code compliance, subject to Section 5.04 of this lease. Specifically, the following will be completed: A. Ladies’ and men’s room complete. B. Telephone closets complete. C. Electrical closets complete with service and distribution panelboards and transformer 277/480 volt, and 110/208 volt. D. Core walls with finished drywall ready for paint. E. Drinking fountains (two per floor). F. Fire extinguisher cabinets. G. Exit signs (two per floor). H. Stained elevator lobby doors. I. Painted lobby elevator doors. J. Painted core corridor doors. K. Stained stairwell doors. L. Hardware and closers for all exit, stairwell and electrical/telephone doors and ladies’/ men’s toilets. M. Space clear of all pipes, base Building ductwork, etc., for ceiling height in accordance with the base Building plans. N. All pipe sleeves in beams and walls to be sealed where required by code. O. Fire and life safety requirements per county and state codes. P. Ground level public areas complete (elevator lobbies, landscaping, truck dock, fan room, etc.). Q. Mechanical, electrical, elevator, base Building systems, complete as shown on base Building plans. R. All general exhaust required by applicable laws.

Related to Other Core Finishes

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement. 8.2 The Contractor shall ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring.

  • WHEXXXX xs xxxx of a plan of reorganization, RESTART PARTNERS V, L.P., a Delaware Limited Partnership ("Restart V"), may acquire an ownership interest in Elsinore Corporation ("Elsinore") or the Four Queens, Inc. ("FQI");

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Licenses for Permanent Installation The contractor must comply with all State mandatory licensing requirements prior to installation. Questions on licensing requirements should be directed to the State Licensing Board. Contractor must furnish and install all furniture and materials in compliance with all applicable codes, whether local, state, or federal; and that all permits or licenses required for installation will be obtained without cost to the State.

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Local Government for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier will be notified by the Local Government of the Local Government’s obligations under this Agreement and the Acts and Regulations relative to Nondiscrimination on the grounds of race, color, or national origin.

  • Uncovering and Correction of Work 12.1 The Contractor shall promptly correct Work rejected by the Owner or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of two years from the date of Substantial Completion, or by terms of an applicable special warranty required by the Contract Documents. The provisions of this Article apply to work done by Subcontractors as well as to Work done by direct employees of the Contractor. 12.2 At any time during the progress of the work, or in any case where the nature of the defects shall be such that it is not expedient to have them corrected, the Owner, at their option, shall have the right to deduct such sum, or sums, of money from the amount of the contract as they consider justified to adjust the difference in value between the defective work and that required under contract including any damage to the structure.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Trade in Services 1. The Parties shall aim at gradually liberalising and opening their markets for trade in services in accordance with the provisions of the General Agreement on Trade in Services (hereinafter referred to as the “GATS”), taking into account ongoing work under the auspices of the WTO. 2. If a Party grants to a non-Party, after the entry into force of this Agreement, additional benefits with regard to the access to its services markets, it shall agree to enter into negotiations with a view to extending these benefits to another Party on a reciprocal basis. 3. The Parties undertake to keep under review paragraphs 1 and 2 with a view to establishing an agreement liberalising trade in services between them in accordance with Article V of the GATS.

  • Replacement of Key Personnel The Engineer must notify the State in writing as soon as possible, but no later than three business days after a project manager or other key personnel is removed from association with this contract, giving the reason for removal.

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!