Staffing There shall be a clinician employed by the outside contractor for EAP Services who will be on-site a minimum of 20 hours a week. The clinician shall report directly to the outside contractor, Peer Assistance Oversight Committee and the MIF liaison. There shall be three full-time Peer Assistants reporting to the outside contractor.
Project Staff Contractor shall appoint to the Project Staff: (i) individuals with suitable training and skills to provide the Work, and (ii) sufficient staffing to adequately provide the Work. Contractor shall make commercially reasonable efforts consistent with sound business practices to honor the specific request of the JBE with regard to assignment of its employees. The JBE may require Contractor to remove any personnel from the Project Staff that interact with any personnel of the Judicial Branch Entities or JBE Contractors (including, without limitation, the Contractor Project Manager) upon providing to Contractor a reason (permitted by law) for such removal. Contractor may, with the JBE’s consent, continue to retain such member of the Project Staff in a role that does not interact with any personnel of the Judicial Branch Entities or
Support Staff The College shall designate a clerical person on each campus whose primary responsibility will be to perform clerical duties related to workload assignments for Employees. Faculty assignments to the clerical person shall be given priority over non- faculty assignments. Any conflicts shall be reported to the Chief Academic Officer or to an academic officer of the College who holds the rank of Campus Director or higher. Employees will be notified of the identity of this person and the clerical person will be notified.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Reformulation Standard “Reformulated Products” shall mean Products that contain concentrations less than or equal to 0.1% (1,000 parts per million (ppm)) of DEHP when analyzed pursuant to U.S. Environmental Protection Agency testing methodologies 3580A and 8270C or other methodology utilized by federal or state government agencies for the purpose of determining the phthalate content in a solid substance.
Reformulation Standards A “reformulated” product (a) contains lead in concentrations that do not exceed 90 parts per million, equivalent to 0.009%, in any exterior parts analyzed pursuant to U.S. Environmental Protection Agency (EPA) methodologies 3050B and 6010B, or (b) yields a result of no more than 1.0 micrograms of lead when sampled according to NIOSH 9100 protocol and analyzed according to EPA 6010B. In addition to the above tests, the Settling Entity may use equivalent methods utilized by any California or federal agency to determine lead content in a solid substance or the amount of the bioavailability of the toxicant through a wipe test, respectively.
New Members No person may be admitted as a member of the Company without the approval of the Member.