Power Measurement Sample Clauses

Power Measurement. Upon agreement with the approval authority the power may be determined by performing a full load acceleration according to R49r06, Annex 8, Appendix 4 or by any other suitable method.
AutoNDA by SimpleDocs
Power Measurement. 4.1 Principle for the establishment of metering points Based on the property rights relations, the demarcation between the Station and the power grid is set at the No. 30A switch by the side of the step up transformer 35KV of the Seller, at which the Seller shall install a set of high-pressure electricity metering box and a set of bi-directional kilowatt-hour meters with reverse current stopping device. (see the metering points diagram in the schedule) 4.2 Electric quantity measuring device 4.2.1 The electric quantity measuring devices shall be allocated in accordance with the requirements set out in the Electric Quantity Measuring Device Technical Management Regulations (DL/T448—2000). Before the operation of the installed electric quantity measuring devices, both Parties to the Contract shall conduct the acceptance inspection in accordance with the Electric Quantity Measuring Device Technical Management Regulations (DL/T448—2000). The second return circuit connecting terminal and the testing terminal installed in the electric quantity measuring devices and the electric quantity measuring device container shall satisfy the conditions to meet the requirement for sealing up. 4.2.2 The electric quantity at each point where electricity is connected to or disconnected from the power grid of the Seller shall be measured by an electronic multi-functional kilowatt-hour meter which shall have the bi-directional active power (accuracy degree is 0.2S) and 4-motion-control reactive power (accuracy degree is 2.0) measuring functions. In addition, the kilowatt-hour meter must have the function required for the settlement of electricity fees. There shall be one kilowatt-hour meter. The Seller shall be responsible for purchasing and installing the electric quantity measuring devices. The ownership of such devices shall belong to the Seller. The Seller shall be responsible for daily operation and maintenance of the electric quantity measuring devices and ensure that such devices are not damaged, and the seals are in good condition. 4.3 Inspection and operation management of electric quantity measuring devices 4.3.1 The measuring devices shall be checked and tested by the qualified measurement inspector, and can be installed and operated only when they have passed such inspection. Relevant expenses shall be borne by the Seller. 4.3.2 Operation and management of regular inspections (by turn) and regular on-spot inspections of electric quantity measuring devices shall be con...
Power Measurement. 3.1 On-grid electric quantity metering points at the Seller’s hydroelectric stations A set of two-directional active and reactive kilowatt-hour meters marked by hour and having the remote-transmission function shall be installed in accordance with the state standards and the specifications of the power industry in order to measure the Seller’s on-grid electric quantity by hour, which shall be used as basis for the calculation of tariff. (Matters such as the electric quantity metering points measuring electric quantity sold by the Seller to the Buyer shall be defined in a separately signed power supply and use contract.) 3.2 Parameters of the major on-grid electric quantity metering points at the Seller’s hydroelectric stations No. Purchasing Point Metering Point Meter No. Current Transducer Ratio Voltage Transducer Ratio Multiplying Factor for the Measurement
Power Measurement. 4.1 Principle for the establishment of metering points Based on the property rights relations, the demarcation between the Station and the power grid is set at the No. 381 and 382 switches by the side of the main transformer 35KV of the Seller, at which the Seller shall install a set of high-pressure electricity metering box and a set of bi-directional kilowatt-hour meters with reverse current stopping device. (see the metering points diagram in the schedule)
Power Measurement. The power requirement shall be measured from the outlet or power supply source, to the product under test. Partner shall measure the average True Power (in xxxxx) of the product. When a Partner is performing measurements to self-certify a product model, the products under test must be in the condition (e.g., configuration and settings) shipped to the customer. See the attached Testing Guidelines for ENERGY STAR® TV/VCR Program for more information.
Power Measurement. The provider‘s performance is measured on the basis of the following criteria: ̝ Response time ̝ Troubleshooting time ̝ System availability
Power Measurement. 4.1 Principle for the establishment of metering points Based on the property rights relations, the demarcation between the Station and the power grid is set at the point of 3 meters from the strain clamp by the side of the Wujin Line Tower #1 of Wudong transformer 35KV. And the metering point is set at the side of the set up transformer 35KV of the Station (see the metering points diagram in the schedule)
AutoNDA by SimpleDocs
Power Measurement 

Related to Power Measurement

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Method of Measurement All linear and area measurements under this Agreement are measured on the horizontal plane, unless specified otherwise in an attached Schedule.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Interim Measures Notwithstanding any requirements for alternative dispute resolution procedures as set forth in Articles 18(B), any party to the Dispute may apply to a court for interim measures (i) prior to the constitution of the arbitral tribunal (and thereafter as necessary to enforce the arbitral tribunal’s rulings); or (ii) in the absence of the jurisdiction of the arbitral tribunal to rule on interim measures in a given jurisdiction. The Parties agree that seeking and obtaining such interim measures shall not waive the right to arbitration. The arbitrators (or in an emergency the presiding arbitrator acting alone in the event one or more of the other arbitrators is unable to be involved in a timely fashion) may grant interim measures including injunctions, attachments and conservation orders in appropriate circumstances, which measures may be immediately enforced by court order. Hearings on requests for interim measures may be held in person, by telephone, by video conference or by other means that permit the parties to the Dispute to present evidence and arguments.

  • Sector Sub-Sector Industry Classification Level of Government Type of Obligation Description of Measure Source of Measure All sectors : : - : Central : National Treatment Senior Management and Board of Directors : National Treatment and the Senior Management and Board of Directors obligations shall not apply to any measure relating to small and medium sized domestic market enterprise2. Foreign equity is restricted to a maximum of 40% for domestic market enterprises with paid-in equity capital of less than the equivalent of USD 200,000 Note: Members of the Board of Directors or governing body of corporation or associations shall be allowed in proportion to their allowable participation or share in the capital of such enterprises. : -1987 Constitution of the Republic of the Philippines. - Foreign Investments Act of 1991 (R.A. No. 7042, as amended by R.A. No. 8179). -Presidential and Administrative Issuances. ∞ 2 The concept of a small and medium sized domestic market enterprise is an enterprise with paid in equity capital of less than the equivalent of USD 200,000.00.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4. 5.7.2 BellSouth shall make available the following channelization systems and interfaces: 5.7.2.1 DS1 Channelization System: channelizes a DS1 signal into a maximum of twenty- four (24)

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.