Performance Deficiency The Department or Customer may, in its sole discretion, notify the Contractor of the deficiency to be corrected, which correction must be made within a time-frame specified by the Department or Customer. The Contractor must provide the Department or Customer with a corrective action plan describing how the Contractor will address all issues of contract non-performance, unacceptable performance, and failure to meet the minimum performance levels, deliverable deficiencies, or contract non-compliance.
Offense Level Calculations i. The base offense level is 7, pursuant to Guideline § 2B1.1(a)(1).
Grievance Levels Level One. If not resolved on an informal discussion basis, the grievance shall be reduced to writing, outlining:
Surplus; Shortage and Deficiency of Funds In accordance with RESPA, if there is a surplus of Funds held in escrow, Xxxxxx will account to Borrower for such surplus. If Xxxxxxxx’s Periodic Payment is delinquent by more than 30 days, Xxxxxx may retain the surplus in the escrow account for the payment of the Escrow Items. If there is a shortage or deficiency of Funds held in escrow, Lender will notify Borrower and Borrower will pay to Lender the amount necessary to make up the shortage or deficiency in accordance with RESPA. Upon payment in full of all sums secured by this Security Instrument, Xxxxxx will promptly refund to Borrower any Funds held by Xxxxxx.
Possible Deficiency Insufficient cooling. Performance Standard – Builder will correct if the cooling system is not capable of maintaining a temperature of 78 degrees Fahrenheit under normal operating conditions. The temperature shall be measured in the center of the room, five feet above the floor. On extremely hot days where outside temperature exceeds 95 degrees Fahrenheit, a difference of 15 degrees from outside temperature will be maintained. All doors must remain open to ensure proper performance and rooms may vary by as much as four degrees and between floors the variance can be as much as 6 degrees. These conditions are specified in the ASHRAE handbook. Homes designed with open foyers, stairways, cathedral ceilings and bonus rooms over garages will usually cause abnormal variations from these standards. Any such variations are specifically excluded from this Warranty.
PRIORITY RATING If so identified, this Contract is a "rated order" certified for national defense, emergency preparedness, and energy program use, and SELLER shall follow all the requirements of the Defense Priorities and Allocation System Regulation (15 C.F.R. Part 700).
Contractor Default Failure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract.
Penalty Rates 24.2.1 The following do not apply to Locomotive Running Employees or Train Controllers: • Any time worked on Saturday: Time and a half • Any time worked on Sunday: Double time • Any time worked between 2000 -0600 hours Monday to Friday Time and a quarter
Non-Paid Status During Treatment After Positive Test The employee will be in a non-pay status during any absence for evaluation or treatment, while participating in a rehabilitation program.
Escalation Cap In a single year of the Contract, the maximum price increase for each individual item on contract shall not exceed the lesser of two (2%) percent of the Contractor’s current NYS pricing as found in the OGS Centralized Contract or the percent increase in the latest available National Consumer Price Index - All Urban Consumers (CPI-U), Not Seasonally Adjusted, U.S. City Average, All Items (Series Id: CUUR0000SA0, CUUS0000SA0); as published by the U.S. Department of Labor, Bureau of Xxxxx Xxxxxxxxxx, Xxxxxxxxxx, X.X. 00000. CPI-U data may be obtained at xxx.xxx.xxx.