Project Refinement Sample Clauses

Project Refinement. The recipient will review data collected and analyzed, provide  Funder updates, evaluate the project’s operations, and refine the approach as needed.
AutoNDA by SimpleDocs
Project Refinement. Prior to entry into the Project Agreement, the Developer shall
Project Refinement. Consists of presenting initial project findings; hosting regional workshops; and refining the project; providing educational sessions with other regional fleets; and identifying three Clean Cities Coalitions to receive technical assistance.
Project Refinement. Task 2.1 - Implementation of EVSE Public Use on Software Platform: The recipient will have the software platform updated to allow for public use of the EVSE. Chargers will be available for the public to use through scheduled or ad-hoc charging on a mobile app for EV drivers.
Project Refinement. An integral component of the audit process is securing customer feedback. As part of the process, Xxxxxxxx will regularly discuss progress with the customer and pose questions for feedback, but a successful component of prior comprehensive projects such as this has been submission of a preliminary energy audit along with an interactive selection tool. After completion of the initial baseline, site walkthroughs, and initial recommendations with estimated economics, Thielsch/RISE will submit its preliminary findings to the customer along with a listing of potential ECMs, by building, with cost and savings coupled with a proposed project cash flow in electronic form. This interactive “selection” tool allows Xxxxxxxx/RISE to collaborate real−time with the customer on project selection and refinement, while showing impacts of including or excluding any ECMs. This collaboration process has been successfully used on numerous comprehensive projects and is often a key part of the customer’s decision making process.
Project Refinement. The goal of this activity is to identify the specific project elements that will be deployed based on the final grant funding level. This activity includes: cost estimation; investment prioritization; development of a Concept of Operations and System Engineering documentation; and, initiation of the performance monitoring program.

Related to Project Refinement

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Project Completion Part 1 – Material Completion

  • FABRICATION Making up data or results and recording or reporting them.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Project Implementation 2. The Borrower shall:

  • Project Renewal Renewal of a PI’s access to controlled-access datasets for a previously-approved project.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

Time is Money Join Law Insider Premium to draft better contracts faster.