Record Drawings and As-Builts Sample Clauses

Record Drawings and As-Builts. Upon completion of the Work, the Architect shall compile for and deliver to the Owner a reproducible set of Record Documents conforming to the marked-up prints, drawings and other data furnished to the Architect by the General Contractor. This set of Record Documents shall show the reported location of the Work and significant changes made during the construction process. Because these Record Documents are based on unverified information provided by other parties and assumed reliable, the Architect cannot and does not warrant their accuracy. Not later than thirty
AutoNDA by SimpleDocs
Record Drawings and As-Builts. Upon completion of the Work and at an additional fee under Reimbursable Expenses, the Architect shall compile for and deliver to the Owner a reproducible set of Record Documents conforming to the marked-up prints, drawings and other data furnished to the Architect by the General Contractor. This set of Record Documents shall show the reported location of the Work and significant changes made during the construction process. Because these Record Documents are based on unverified information provided by other parties and assumed reliable, the Architect cannot and does not warrant their accuracy. Not later than thirty (30) calendar days after Substantial Completion of the Project the General Contractor shall transmit to the Architect redlined documents whose completion and accuracy have been a condition for approval of the General Contractor’s monthly payment application and the Architect shall review for completeness, correct where necessary, and forward to the Owner, warranties, guarantees, submittals and the Record Drawings showing all changes in the Work and selections made during the construction process, based on Record Drawings received from the General Contractor including applicable addenda, clarifications, submittal information, and change orders that occurred during the Project. The Project Manual and all engineering calculations shall be provided to Owner in reproducible format at full size. In addition, the Record Drawings, comprised of all architectural, structural, mechanical, electrical, landscape, civil, interior acoustic, and special system plans, reflected ceiling plans, exterior elevations, alternative energy analyses and life cycle cost analysis, if any, shall be provided by the Architect to the Owner in a computer media “tif” and “dwg” format, including one full size hard copy set. Architect’s obligation to provide the Record Drawings to Owner in the requested reproducible format shall be at Owner’s expense.
Record Drawings and As-Builts. 3.13.1 Design-Builder shall maintain a legible set of “as-builts” and provide record drawings of all Work continuously as the job progresses to show: (i) deviations from the approved Construction Documents; (ii) details in the Work not previously shown; (iii) changes to existing conditions or existing conditions found to differ from those shown on any existing drawings and plans; (iv) the actual installed position and location of wire, conduit, piping, fittings, valves and structures; and (v) such other further information as City my reasonably request. In addition, Design-Builder shall continuously update the drawings and plans in the latest version of AutoCAD format.

Related to Record Drawings and As-Builts

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

  • TEACHING LOADS AND ASSIGNMENTS A. The normal daily/weekly teaching load shall be:

  • Design and Drawings (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Shop Drawings and Samples a. Record date of receipt of Samples and approved Shop Drawings.

  • Use of Buildings and Equipment 21.4.1 The Association shall have the right to use District buildings, sites, and equipment during all reasonable hours for meetings and other Association activities.

  • Offer and Acceptance of Weekend Overtime (a) The Employer is committed to providing reasonable notice to Employees of an offer / cancellation of weekend overtime. To this end, notice will generally be provided prior to the normal meal break on Thursday. Where the Employer is unable to give such notice the Employer may offer I cancel such overtime by notifying affected Employees before the finish time of ordinary hours on Friday.