Record Plans. Throughout the Project, Contractor shall maintain records of all deviations from the Contract Plans and Specifications and shall prepare record drawings showing correctly and accurately all changes and deviations from the Work made during construction to reflect the Project as it was actually constructed. These drawings shall conform to recognized standards of drafting, shall be neat and legible. Contractor shall be liable to County for the cost to develop record drawings upon Contractor’s failure or refusal to provide same in a timely manner. Contractor shall keep one copy of the record of all drawings, specifications, addenda, modifications, and shop drawings at the site in good order and annotated to show all changes made during the construction process. These documents shall be available to County at all times.
Record Plans. Within sixty (60) days following the issuance of the Notice of Commercial Operation, Installer shall prepare and deliver to Compact and Homeowner detailed record plans accurately depicting the PV System including, without limitation, all wiring, lines, conduits, piping and other structures or equipment.
Record Plans. Within ninety (90) days following the issuance of the Notice of Commercial Operation, Developer shall prepare and deliver to CVEC detailed record plans accurately depicting the PV System and, if applicable, the Battery Energy Storage System including, without limitation, interconnection applications and utility agreements, all wiring, lines, conduits, piping, other structures or equipment and, for any Battery Energy Storage System, the software controls manual.
Record Plans. Upon completion of the improvements for the project, the Owner shall provide the Township with a full set of as-built plans of the improvements for the Townships records.
Record Plans. Consultant will compile record plans from red line markups in CADD and will provide the Sponsor with one (1) full size mylar reproducible and one (1) pdf reproducible.
Record Plans. It is understood and agreed and made a part of this contract that the A/E will, under Phase E and services, upon completion of the work make final corrections incorporating all changes and revisions that have been made by A/E or its consultants during the progress of the work so as to provide "record drawings" of the Project. A/E will deliver record plans and documents to the University the following:
a) One (1) complete sets of revised, printed Record Documents.
b) Two (2) electronic copies of AUTOCAD and drawings complete contract documents (PDF Document for all contract documents)
Record Plans. The Developer shall be responsible for keeping accurate records of all deviations from the plans. These records shall be utilized along with the Inspector’s records to prepare a complete and accurate set of Record Plans (“As-Builts”). Field measurement and certification by the Design Engineer of all final grades shown on the improvement plans, including the finished pad elevations of subdivision lots, inverts, rims, grates, top of curb at changes in vertical alignment, toe and top of slope on all finished storm drain detention basins, and any other designed and constructed parameters as required by the County Engineer, shall be required prior to final acceptance of the subdivision improvements. Building pad elevations shall be constructed to within
Record Plans. A stormwater report entitled “Stormwater Report Switchpoint Quincy Mixed-Use Redevelopment Quincy, Massachusetts dated November 2021 prepared by Xxxxxx Xxxxxx, Civil & Environmental Consultants, Inc.
Record Plans. Within twenty (20) days after each Delivery Date, Landlord shall provide Tenant three (3) complete sets of completed record plans depicting the completed Base Building Work (with field measurements only as appropriate under the circumstances) for the applicable Floor(s) of the Premises showing, without limitation, all changes and/or revisions that have been made subsequent to the approval of the Approved Tenant Work Plans and Specifications.