Prepare Record Drawings Sample Clauses

Prepare Record Drawings. Prepare and provide to City one set of permanent record drawings representative of the “as constructed” work based on Contractor- and/or City-supplied redlines of changes during construction. Record drawings will be provided to the City in digital format. Task Deliverables
AutoNDA by SimpleDocs
Prepare Record Drawings. The ENGINEER will prepare record drawings upon completion of construction. The record drawings will be prepared based on redline as-built information maintained and provided by the CONTRACTOR. Field data, information, and sketches developed by the ENGINEER will also be incorporated into the record drawings. The record drawings will include all above grade changes from the original construction drawings. Changes made to reflect the as-installed conditions will be made in the same level of detail and to the same degree of drafting quality as the original construction drawings. The following copies of the record drawings will be provided to the City: one CD with electronic files (pdf), and two copies on bond paper (22” x 34” sheet size). Scope of Work - Coldwater East Steel Water Storage Reservoir (2.5 MG) Rehabilitation Design June 20, 2017 Page 5 FEE AND SCHEDULE Construction drawings and specifications will be completed within eight weeks after Notice to Proceed. All tasks described in this proposal are anticipated to be completed by May 2018. NCS’ fee is $81,310, billed on a time and materials basis. The attached Exhibit C provides a breakdown of the fees. Assumptions:
Prepare Record Drawings. Prepare record drawings based upon the Contractor’s markups and Xxxx & Xxxxxxx’x field observations and final inspections. TASKS BY OTHERS It is assumed that the City of Camas will conduct the majority of the onsite inspection, with Consultant inspection limited to the visits in the Scope. It is assumed that the City will prepare agendas and meeting minutes for meetings. EXHIBIT B ENGINEERING SERVICES SCOPE AND ESTIMATED COST City of Camas - Prune Hill Park Wastewater Pump Station Upgrade - Services During Construction Tasks Principal Hours Project Manager Hours Project Engineer Hours Senior Structural Engineer Hours AutoCAD Hours 1 Project Management 2 4
Prepare Record Drawings. Upon receiving written authorization to proceed, CONSULTANT shall:  Review, confirm accuracy and completeness, and prepare record drawings based upon information supplied by the Contractor. Provide one set of reproducible drawings and one set of AutoCAD drawings on a CD. TASK 7 – PERFORM WARRANTY INSPECTION  Perform one-year warranty inspection following anniversary date of Notice of Completion and prepare a report identifying defective items to be repaired under warranty by the contractor. One tank will be dry inspected. Two tanks will be inspected by dive on the same day. EXHIBIT B CONSULTANT’S FEE SCHEDULE FOR WATER TANK IMPROVEMENTS PROJECT (CIP 405-660) EXHIBIT C DESIGN SCHEDULE FOR WATER TANK IMPROVEMENTS PROJECT (CIP 405-660) EXHIBIT D CERTIFICATES OF INSURANCE FORMS FOR WATER TANK IMPROVEMENTS PROJECT (CIP 405-660) CONSULTANT shall provide, in addition to the Certificates of Insurance, original Endorsement affecting the coverages specified in Section 12 - INSURANCE of the Agreement on the attached form. No substitute form will be accepted. ATTACHED
Prepare Record Drawings. L. Prepare a Summary of all Equipment Warranties for City’s records. JQ Infrastructure, LLC (JQ) will perform confined space entry (CSE) into the wet xxxxx for the visual observations and evaluations to determine the extent of abrasion/erosion and H2S deterioration of the interior surfaces of the wet well structure. To facilitate the CSE, the following are assumed:
Prepare Record Drawings. Prepare record drawings of the project, which incorporates the project changes and deviations as documented by the Contractor.
Prepare Record Drawings. Provide record drawings representative of the as-constructed project. Record drawings will be completed based upon contractor and inspector red-lined markups to as-bid drawings. Record drawings will be completed per City standards.
AutoNDA by SimpleDocs
Prepare Record Drawings. Update the original Contract Documents based on information received from the CONTRACTOR through the Construction Manager. Furnish one reproducible set of Record Drawings and electronic media in accordance with Appendix A2 of the CWP Guidelines. DELIVERABLES Record Drawings, and Electronic Media TASK 7 PREPARE OPERATIONS AND MAINTENANCE MANUALS‌ Review O&M maintenance manual submittals collected by the CITY from the contractor. Provide the CITY with comments concerning the submittal completeness and correctness. Review a submittal, if required, and provide the CITY with comments. Assume approximately 1,600 sheets of drawings. DELIVERABLES Submit draft operation and maintenance manual ten (10) months prior to start up (5 copies), and Submit final operation and maintenance manual six (6) months prior to start up (10 copies).
Prepare Record Drawings. Upon completion of the project, revise the construction contract drawings to conform to the construction records furnished by the City and Contractor. Provide City with four (4) half-size sets of drawings and an electronic CAD file in Autocad format and a .pdf format file.
Prepare Record Drawings. Upon receiving written authorization to proceed, CONSULTANT shall: Review, confirm accuracy and completeness, and prepare record drawings based upon information supplied by the Contractor. Provide one set of reproducible drawings and one set of AutoCAD drawings on a CD or other electronic means.