ROADWAY DESIGN CONTROLS. The Engineer shall inform the State of changes made from previous initial meetings regarding each exception, waiver, and variance that may affect the design. The Engineer shall cease all work under this task until the exceptions, waivers, and variances have been resolved between the Engineer and the State unless otherwise directed by the State to proceed. The Engineer shall identify, prepare exhibits, and complete all necessary forms for Design Exceptions and Waivers within project limits prior to the 30% Submittal. These exceptions shall be provided to the State for coordination and processing of approvals.
ROADWAY DESIGN CONTROLS. The Engineer shall inform the State of changes made from previous initial meetings regarding each exception, waiver, and variance that may affect the design. The Engineer shall cease all work under this task until the exceptions, waivers, and variances have been resolved between the Engineer and the State unless otherwise directed by the State to proceed. The Engineer shall identify, prepare exhibits, and complete all necessary forms for Design Exceptions and DocuSign Envelope ID: XX000XX0-0X00-0X0X-X000-X0XXXXX0XX00 Xxxxxxx within project limits prior to the 30% Submittal. These exceptions shall be provided to the State for coordination and processing of approvals.
ROADWAY DESIGN CONTROLS. The Engineer shall inform the FBCTRA of changes made from previous initial meetings regarding each exception, waiver, and variance that may affect the design. The Engineer shall cease all work under this task until the exceptions, waivers, and variances have been resolved between the Engineer and the FBCTRA unless otherwise directed by the FBCTRA to proceed. The Engineer shall identify, prepare exhibits, and complete all necessary forms for Design Exceptions and Waivers within project limits prior to the 50% Submittal. These exceptions shall be provided to the FBCTRA for coordination and processing of approvals.
ROADWAY DESIGN CONTROLS. A. GRADING AND CROSS SECTIONS
1. Model revisions for sidewalk, driveway profiles and retaining wall updates
2. Update earthwork quantities
A. DRAINAGE DESIGN
2. Storm Sewer Design, 10-yr design frequency
a. Re-delineation of drainage areas due TxDOT comments and efforts to avoid utilities
b. Additional area computation effort
c. Additional storm sewer computation effort for changes to project.
d. Additional effort on Drainage plan and profile sheets for changes to project.
e. Update quantities and summary sheet
ROADWAY DESIGN CONTROLS. A. GRADING AND CROSS SECTIONS
1. Model revisions for sidewalk, driveway profiles and retaining wall updates
2. Update earthwork quantities
II. DRAINAGE
A. DRAINAGE DESIGN
ROADWAY DESIGN CONTROLS. GCE shall perform the roadway design and develop design drawings, using the CADD standards as required by the Client, which will be included in the contract documents for construction. The following tasks describe the work to be performed:
ROADWAY DESIGN CONTROLS. The Engineer shall inform the County of changes made from previous initial meetings regarding each exception, waiver, and variance that may affect the design. The Engineer shall cease all work under this task until the exceptions, waivers, and variances have been resolved between the Engineer and the County unless otherwise directed by the County to proceed. The Engineer shall identify, prepare exhibits, and complete all necessary forms for Design Exceptions and Waivers within project limits prior to the 30% Submittal. These exceptions shall be provided to the County for coordination and processing of approvals.
ROADWAY DESIGN CONTROLS. The Engineer shall inform the State of changes made from previous initial meetings regarding each exception, waiver, and variance that may affect the design. The Engineer shall cease all work under this task until the exceptions, waivers, and variances have been resolved between the Engineer and the State unless otherwise directed by the State to proceed. The Engineer shall identify, prepare exhibits, and complete all necessary forms for Design Exceptions and Waivers within project limits prior to the 30% Submittal. These exceptions shall be provided to the State for coordination and processing of approvals. The Engineer shall: Refine Schematic. The Engineer shall refine the horizontal and vertical alignment of the design schematic in English units for main lanes, ramps, direct connectors, xxxxxxxx xxxxx, xxxxx xxxxxxx, including grade separation structures. The Engineer shall determine vertical clearances at grade separations and overpasses, taking into account the appropriate percent grade and super‐elevation rate. Minor modifications in the alignment must be considered to provide optimal design. The State must approve the refined schematic prior to the Engineer proceeding to the 30% milestone submittal, and prior to starting on the bridge layouts. The Engineer shall provide roadway plan and profile drawings using CADD standards as required by the State. The drawings must consist of a planimetric file of existing features and files of the proposed improvements. The roadway base map must contain line work that depicts existing surface features obtained from the schematic drawing. Existing major subsurface and surface utilities must be shown if requested by the State. Existing and proposed right‐of‐way lines must be shown. Plan and Profile must be shown on separate or same sheets (this depends upon width of pavement) for main lanes, frontage roads, and direct connectors. The plan view must contain the following design elements:
ROADWAY DESIGN CONTROLS. The GEC shall review all stages of submittals for plan sheets, typical sections and roadway details submitted by the Developer.