Secondary Clerical Staff Working Alone Sample Clauses

Secondary Clerical Staff Working Alone. During the months of July and August, school clerical staff in secondary schools shall not be required to work alone in the buildings. The WCB Occupational Health and Safety Regulation regarding working alone or in isolation is outlined in Regulation 4.21, 4.22 and 4.23.
AutoNDA by SimpleDocs
Secondary Clerical Staff Working Alone. During the months of July and August, school clerical staff in secondary schools shall not be required to work alone in the buildings.

Related to Secondary Clerical Staff Working Alone

  • PROFESSIONAL DEVELOPMENT AND EDUCATIONAL IMPROVEMENT A. The Board agrees to implement the following:

  • Project Team Cooperation Partnering 1.1.3 Constitutional Principles Applicable to State Public Works Projects.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Project Staff Contractor shall appoint to the Project Staff: (i) individuals with suitable training and skills to provide the Work, and (ii) sufficient staffing to adequately provide the Work. Contractor shall make commercially reasonable efforts consistent with sound business practices to honor the specific request of the JBE with regard to assignment of its employees. The JBE may require Contractor to remove any personnel from the Project Staff that interact with any personnel of the Judicial Branch Entities or JBE Contractors (including, without limitation, the Contractor Project Manager) upon providing to Contractor a reason (permitted by law) for such removal. Contractor may, with the JBE’s consent, continue to retain such member of the Project Staff in a role that does not interact with any personnel of the Judicial Branch Entities or

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Traditional Medicine Cooperation 1. The aims of Traditional Medicine cooperation will be: (a) to build on existing agreements or arrangements already in place for Traditional Medicine cooperation; and (b) to promote information exchanges on Traditional Medicine between the Parties. 2. In pursuit of the objectives in Article 149 (Objectives), the Parties will encourage and facilitate, as appropriate, the following activities, including, but not limited to: (a) encouraging dialogue on Traditional Medicine policies and promotion of respective Traditional Medicine; (b) raising awareness of active effects of Traditional Medicine; (c) encouraging exchange of experience in conservation and restoration of Traditional Medicine; (d) encouraging exchange of experience on management, research and development for Traditional Medicine; (e) encouraging cooperation in the Traditional Medicine education field, mainly through training programs and means of communication; (f) having a consultation mechanism between the Parties' Traditional Medicine authorities; (g) encouraging cooperation in Traditional Medicine therapeutic services and products manufacturing; and (h) encouraging cooperation in research in the fields of Traditional Medicine in order to contribute in efficacy and safety assessments of natural resources and products used in health care.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

Time is Money Join Law Insider Premium to draft better contracts faster.