Solution Design Workshop Sample Clauses

Solution Design Workshop. In preparation for the Design Workshop, Intelex will review all relevant reference documentation provided by the PCCA, including but not limited to functional requirements, current forms, workflow descriptions or diagrams, reports, dashboards, and procedures. Intelex will provide introductory training to the PCCA on the pre-configured standard applications and the Solution, and on the Intelex project methodology to support discussions during the workshop. Intelex will prepare agenda for the workshop. The detailed solution design will occur in an on-site Design Workshop during which Intelex will lead the process for gathering and analyzing requirements for the project. The business capabilities and requirements will be defined to reflect the desired user experience, business process workflow, as well as specific business rules and logic. Forms and sub forms will be reviewed, as well as role access and security for each form. Any third-party interfaces and data imports will be identified, as well as reporting requirements. Using information gathered during Phase 1 and Phase 2 and during the workshop as input, the Intelex Project Manager will refine the project plan. Following the workshop, Intelex will document the workflow, data interfaces/import and reports in a Specifications Document. Also identified will be form-level detail, user roles and security. The Specifications Document will detail the necessary configuration and guide the development and implementation of the Solution. The Design Workshop will be conducted Onsite by one (1) Intelex resources for a period of 1 Business Day. Deliverables: Design Workshop Agenda, Revised Project Plan, Specifications Documentation
AutoNDA by SimpleDocs

Related to Solution Design Workshop

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Research Design The data generated by excavations at the prehistoric site(s) will be used to examine at least three topics: (1) chronology; (2) technology; and (3) subsistence practices. Insights into changing patterns of community organization may also be granted, as may insights into changes in social organization. The data recovered will then be compared to data from other regional sites.

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!