Special Working Rules and Conditions for Tunnels and Sealed Air Pressure Bores Sample Clauses

Special Working Rules and Conditions for Tunnels and Sealed Air Pressure Bores. 1. All terms and conditions of this Agreement shall apply to all employees employed on a tunnel job or project, unless otherwise specified in this Section R. 2. This section covers jobsite work on construction, alteration, repair, modification or demolition of tunnels, shaft, tunnel shafts, adits, silos, raises, subways, underground power houses, including the lining of same which falls within the jurisdiction of the Union. Where open cutwork is covered over or decked with wood, steel or other substitute materials and workmen are required to work under such cover, they shall work and be paid in accordance with the terms and conditions of this Agreement. For all excavation and work related to the excavation, without limiting the scope of the work covered hereby, it is agreed that this Agreement shall cover but not be limited to the construction of, in whole or in part, or the improvement or modification thereof, including any structure or operations which are incidental thereto, the assembly, operation, maintenance and repair of all equipment, vehicles and other facilities used in connection with the performance of the aforementioned work and services and including without limitation the following types of classes or work. 3. The xxxxxxx, running and/or handling of all boring equipment, mole machines, mining machines, mucking machines, heading xxxxxxx, all drilling (except jackleg and jumbo), all diamond core drilling, grinding and sharpening of bits, slushers, tuggers (except in breast board or crown bar headings), all conveyors and conveyor belts, locomotives, rubber-tired equipment, including man trip vehicles, mobile power jumbos, Xxxxx Wagons and tractors, all concrete placing equipment such as Xxx Pumpcrete and all pneumatic placers (flowcrete) Xxxxxx, Xxxxxxx-Xxxxxxxxx and all similar equipment. The jacking of pipe in tunnels, all ground support work including cutting, welding, hauling and hoisting of all liner plate and other materials, all work performed under compressed air which falls within the jurisdiction of the Union. The xxxxxxx of all hoisting equipment including cherry pickers and/or carpassers, mobile powered heading switches, concrete screeds, agitator cars, the moving, raising and setting of forms including slip forms in tunnels and tunneling operation. The operation, tending and maintenance of all pumps, generators, compressors and ice plants in or on tunnels and tunnel shaft projects. 4. Any and all emplacements commonly described as ...
AutoNDA by SimpleDocs

Related to Special Working Rules and Conditions for Tunnels and Sealed Air Pressure Bores

  • CLOUD SPECIFIC TERMS AND CONDITIONS To the extent that Contractor has received an award for Lot 3, Cloud, the following terms and conditions apply to Lot 3, Cloud. For the duration of an Authorized User Agreement, the Cloud Solution shall conform to the Cloud Solution Manufacturer’s specifications, Documentation, performance standards (including applicable license duration, warranties, guarantees, Service Level Agreements, service commitments, and credits). Contractor is responsible for providing physical and logical security for all Data, infrastructure (e.g. hardware, networking components, physical devices), and software related to the services the Contractor is providing under the Authorized User Agreement. All Data security provisions agreed to by the Authorized User and Contractor within the Authorized User Agreement may not be diminished for the duration of the Authorized User Agreement without prior written agreement by the parties amending the Authorized User Agreement.

  • Geographic Area and Sector Specific Allowances, Conditions and Exceptions The following allowances and conditions shall apply where relevant. Where the Employer does work which falls under the following headings, the Employer agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • GENERAL WORKING CONDITIONS Section 18-1. Employment begins and ends at each project site. Section 18-2. The selection of craft foremen and/or general foremen and the number of foremen required shall be entirely the responsibility of the Employer, it being understood that in the selection of such foremen and/or general foremen the Employer will give primary consideration to the qualified individuals available in the local area. After giving such consideration, the Employer may select such individuals from other areas. All foremen shall take orders from the designated Employer representatives. Craft foremen shall be designated working foremen at the request of the Employer. Section 18-3. There shall be no limit on production by employees nor restrictions on the full use of tools or equipment. Employees using tools shall perform any of the work of the trade and shall work under the direction of the craft foremen. There shall be no restrictions on efficient use of manpower other than as may be required by safety regulations. Section 18-4. Employees shall be at their place of work at the starting time and shall remain at their place of work performing their assigned functions under the supervision of the Employer until quitting time. The parties reaffirm their policy of a fair day’s work for a fair day’s wage. Section 18-5. All equipment assigned to a project shall be under the control of the Employer. The Employer shall have the right to determine how many pieces of equipment an individual employee shall operate. In an emergency, foremen shall operate any equipment assigned by the Employer, and there shall be no restriction on foremen in the use of the tools of his or her craft in such emergency. The foremen shall be from the craft normally operating the equipment. In accordance with currently recognized craft jurisdiction, the Employer shall determine the assignment of employees to start, stop, and maintain small portable construction equipment. Such work may be assigned to craft employees within a reasonable distance of their primary duties or an employee may be assigned full time to start, stop and maintain the Employer’s small, portable equipment on the job site. There shall be no over xxxxxxx of this type of equipment. The number of employees assigned to rigging and scaffolding operations shall be at the sole discretion of the Employer. The ratio of journeyperson to welders shall be determined solely by the Employer. Section 18-6. The Employer may utilize the most efficient methods or techniques of construction, tools or other labor saving devices to accomplish the work. Practices not a part of the terms and conditions of this Agreement, stand by crews and feather bedding practices will not be recognized. Section 18-7. It is recognized that specialized or unusual equipment may be installed and/ or serviced by individuals who have special training, skill, or qualifications and are not covered by this Agreement. Testing, inspection, or service performed on plant equipment under warranty may be performed by the vendor’s personnel. Section 18-8. Neither the Union nor its local unions shall coerce or in any way interfere with the Owner’s personnel, operation or facilities at the plant site. The Owner’s right to contract directly with other companies for work at the plant site shall not be limited, and the Union shall cooperate and not interfere with the Employer’s operations. Section 18-9. It is agreed that overtime is undesirable and not in the best interest of the industry or the employees; therefore, except in unusual circumstances, overtime will not be worked. Where unusual circumstances do exist, however, the Employer will have the right to assign specific employees and/or crews to perform such overtime work as is necessary to accomplish the job. Section 18-10. There will be no rest periods, organized coffee breaks or other non-working time established during working hours. Section 18-11. Individual seniority shall not be recognized or applied to employees working on projects under this Agreement. Section 18-12. The Employer shall establish such reasonable project rules as the Employer deems appropriate. These rules will be reviewed at the pre-job conference and posted at the project site by the Employer, and may be amended thereafter as necessary.

  • Use of Basement and Service Areas The basement(s) and service areas, if any, as located within the

  • Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.

  • Change Orders and Contract Amendments 33.1 The Procuring Entity may at any time order the Supplier through notice in accordance GCC Clause 8, to make changes within the general scope of the Contract in any one or more of the following: a) drawings, designs, or specifications, where Goods to be furnished under the Contract are to be specifically manufactured for the Procuring Entity; b) the method of shipment or packing; c) the place of delivery; and d) the Related Services to be provided by the Supplier. 33.2 If any such change causes an increase or decrease in the cost of, or the time required for, the Supplier's performance of any provisions under the Contract, an equitable adjustment shall be made in the Contract Price or in the Delivery/Completion Schedule, or both, and the Contract shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must be asserted within twenty-eight (28) days from the date of the Supplier's receipt of the Procuring Entity's change order. 33.3 Prices to be charged by the Supplier for any Related Services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:

  • Construction Phase Services 3.1.1 – Basic Construction Services

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!