Sufficiency Assessment Sample Clauses

Sufficiency Assessment. ‌ The Portland Harbor ROD Section 14.2.11 states that implementation of the Selected Remedy may need to be conducted in phases and/or work sequenced based on consideration of a range of factors including source control actions and recontamination potential. To evaluate source control actions and recontamination potential, a Sufficiency Assessment Report shall be submitted to EPA for comment and approval. The objective of the Sufficiency Assessment is to evaluate upland (direct discharges, groundwater, river bank, overwater) and in-water sources of contaminants to determine whether they have been adequately investigated and sufficiently controlled or considered such that the RA can proceed. The Sufficiency Assessment will consider whether upland (direct discharges, groundwater, river bank, overwater) and in-water sources will adversely impact the short- or long-term effectiveness of the proposed RA. The Sufficiency Assessment should be completed following the schedule deadlines in Section 6.2. The Sufficiency Assessment shall consider potential impacts from a range of potential sources, including but not limited to: Upland pathways (direct discharges, groundwater, river bank, and overwater); In-water sources of recontamination; Resuspension of sediments from natural and anthropogenic activities; Factors that may impact sediment cap effectiveness; Potential future use for near shore land and in-water uses; and Other future conditions (e.g., climate change impacts) that may impact recontamination potential. The components of the Sufficiency Assessment Report shall include: Description of the Project Area and Xxxxxxxx Street Area setting, the upland and in-water source areas being evaluated and an overview of the remainder of the report. A CSM that describes the geographically relevant upland (direct discharges, groundwater, river bank, and overwater) and in-water sources of contamination, contaminants of concern (COCs) and migration pathways into the Project Area. A summary of available information regarding the source control status of direct discharges, groundwater, river bank, and overwater sources of COCs into the Project Area that may affect achieving any of the remedial action objectives by comparing to ROD Table 17 cleanup levels and Table 21 RALs and PTW thresholds as one line of evidence; identification of any sources, COCs and pathways that have not been effectively addressed and could impact the RA; and identification of data gaps. A summary of in-...
AutoNDA by SimpleDocs
Sufficiency Assessment. (a) The Portland Harbor ROD Section 14.2.11 states that implementation of the Selected Remedy may need to be conducted in phases and/or work sequenced based on consideration of a range of factors including source control actions and recontamination potential. To evaluate source control actions and recontamination potential, a Sufficiency Assessment Report shall be submitted to EPA for comment and approval. The objective of the Sufficiency Assessment is to evaluate upland (direct discharges, groundwater, river bank, overwater) and in-water sources of contaminants to determine whether they have been adequately investigated and sufficiently controlled or considered such that the RA can proceed. The Sufficiency Assessment will consider whether upland (direct discharges, groundwater, river bank, overwater) and in-water sources will adversely impact the short- or long-term effectiveness of the proposed RA. The Sufficiency Assessment should be completed following the schedule deadlines in Section 6.2.
Sufficiency Assessment. The Portland Harbor ROD Section 14.2.11 states that implementation of the Selected Remedy may need to be conducted in phases and/or work sequenced based on consideration of a range of factors including source control actions and recontamination potential. To evaluate source control actions and recontamination potential, a Sufficiency Assessment Report shall be submitted to EPA for comment and approval.

Related to Sufficiency Assessment

  • Security Assessment If Accenture reasonably determines, or in good faith believes, that Supplier’s security practices or procedures do not meet Supplier’s obligations under the Agreement, then Accenture will notify Supplier of the deficiencies. Supplier will without unreasonable delay: (i) correct such deficiencies at its own expense; (ii) permit Accenture, or its duly authorized representatives, to assess Supplier’s security-related activities that are relevant to the Agreement; and (iii) timely complete a security questionnaire from Accenture on a periodic basis upon Accenture’s request. Security issues identified by Accenture will be assigned risk ratings and an agreed-to timeframe to remediate. Supplier will remediate all the security issues identified within the agreed to timeframes. Upon Supplier’s failure to remediate any high or medium rated security issues within the stated timeframes, Accenture may terminate the Agreement in accordance with Section 8 above.

  • PROPERTY ASSESSMENT The Buyer and Seller hereby acknowledge that the Province of Ontario has implemented current value assessment and properties may be re-assessed on an annual basis. The Buyer and Seller agree that no claim will be made against the Buyer or Seller, or any Brokerage, Broker or Salesperson, for any changes in property tax as a result of a re-assessment of the property, save and except any property taxes that accrued prior to the completion of this transaction.

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • Security Assessments Upon advance written notice by the JBE, Contractor agrees that the JBE shall have reasonable access to Contractor’s operational documentation, records, logs, and databases that relate to data security and the Contractor’s Information Security Program. Upon the JBE’s request, Contractor shall, at its expense, perform, or cause to have performed an assessment of Contractor’s compliance with its privacy and data security obligations. Contractor shall provide to the JBE the results, including any findings and recommendations made by Contractor’s assessors, of such assessment, and, at its expense, take any corrective actions.

  • Impact Assessment If Service Provider desires to make any change, upgrade, replacement or addition that may have an adverse impact or require changes as described in Section 9.6(c) or increase the risk of Service Provider not being able to provide the Services in accordance with this Agreement or violate or be inconsistent with DIR Standards or Strategic Plans, then Service Provider shall prepare a written risk assessment and mitigation plan (1) describing in detail the nature and extent of such adverse impact or risk, (2) describing any benefits, savings or risks to DIR or the DIR Customers associated with such change, and (3) proposing strategies to mitigate any adverse risks or impacts associated with such change and, after consultation and agreement with DIR, implement the plan.

  • Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other xxxxx or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test xxxxx or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.

  • Performance Assessment 6.1 The Performance Plan (Annexure A) to this Agreement sets out key performance indicators and competencies that needs to be evaluated in terms of –

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.