Surface Water Monitoring Sample Clauses

Surface Water Monitoring. A certified professional engineer will perform all hydrologic modeling on site and set the surface water gauges and xxxxx at locations as outlined in the mitigation instrument, these will be monitored continuously as per the instrument. A certified professional engineer will also supervise the installation of groundwater xxxxx and the complete monthly monitoring. In conjunction with the vegetative monitoring and interpretation of quantitative and qualitative data, the gauges and xxxxx will be used to interpret the invert elevation being tested at the stoplog weirs, in order to fine tune the final elevation at which they will be set to best restore and maintain the intended ecological conditions. The stop logs may need to be removed periodically to allow the site to dry down for prescribed burn implementation or other access as needed. The drawdown is only intended long enough to allow for the prescribed burn. The hydrologist will also place gauges in the permanent transects to measure groundwater in the soils. These are not required as per the permit.
AutoNDA by SimpleDocs
Surface Water Monitoring. Two off-post surface water sampling sites in First Creek at the north fence line of RMA and in First Creek at Colorado Highway 2 shall be sampled by the Contractor for water quality once each year at low flow. The surface water sites are described in Section 2.10 of the LTMP and locations are shown in Figure 6.3-1 of the LTMP (Attachment L10).
Surface Water Monitoring. Opinaca shall share with the Environment Committee the sampling protocols, the analytical results and the interpretation of data for effluents from the Xxxxxxxx Project, as well as the results of the periodic characterization of receiving waters carried out pursuant to Applicable Laws and the Certificate of Authorization.
Surface Water Monitoring. The Company shall use all reasonable means to operate the Landfill to ensure protection of groundwater and surface waters. The Company shall be responsible for surface water monitoring. Surface water monitoring will be done at Permit- designated locations in accordance with the NPDES storm water monitoring plan.

Related to Surface Water Monitoring

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Monitoring In each case in which the Foreign Custody Manager maintains Foreign Assets with an Eligible Foreign Custodian selected by the Foreign Custody Manager, the Foreign Custody Manager shall establish a system to monitor (i) the appropriateness of maintaining the Foreign Assets with such Eligible Foreign Custodian and (ii) the contract governing the custody arrangements established by the Foreign Custody Manager with the Eligible Foreign Custodian. In the event the Foreign Custody Manager determines that the custody arrangements with an Eligible Foreign Custodian it has selected are no longer appropriate, the Foreign Custody Manager shall notify the Board in accordance with Section 3.2.5 hereunder.

Time is Money Join Law Insider Premium to draft better contracts faster.