Wastewater Treatment Capacity Sample Clauses

Wastewater Treatment Capacity. The City and the Developer agree that there is capacity in the wastewater treatment facility to serve (1) existing residents and businesses that are already hooked up to the facility, (2) anticipated residents and businesses through build-out of the City’s existing General Plan, and (3) the Project. The City and the Developer acknowledge and agree that reserving this capacity for the Project, such that sewer hookups shall be available at such time as they are needed as the Project builds out, is a material element of the consideration provided by the City to the Developer in exchange for the benefits provided to the City under this Agreement. The Parties recognize the availability of sufficient sewer capacity may be affected by regulatory or operational constraints that are not within the City’s discretion. To the extent the availability of sewer capacity is within the City’s discretion (e.g., whether to extend sewer service to areas not currently within the City’s service area), the City shall not approve providing such capacity to areas currently outside the City’s service area if this approval would prevent or delay the ability of the City to provide sewer hookups to the Project as the Project requires hook-ups or connections. This provision shall not affect the City’s ability to provide sewer service within its service boundaries or within the existing City boundaries as they exist on the effective date of this Agreement, and as to such connections, the Parties requesting sewer service shall be connected on a first come first served basis. The Developer shall pay the applicable connection charge pursuant to that specified in Exhibit I of this Agreement at the time of building permit issuance. The Developer acknowledges that connection charge may increase substantially over time and that the cost to comply with the City's new NPDES permit, as they may be approved from time to time during the term of this Agreement, may be substantial.
AutoNDA by SimpleDocs
Wastewater Treatment Capacity. This Contract does not obligate the City to reserve any wastewater treatment capacity at any present or future wastewater treatment plant, or to construct or otherwise provide any new or additional wastewater treatment plant or capacity.
Wastewater Treatment Capacity. (1) Upon the Effective Date, City shall make available capacity from the existing City wastewater treatment plant sufficient to provide the Xxxxx Project with adequate wastewater treatment capacity for eight hundred (800) single-family detached residential units, a swim center and Storage Uses ( Xxxxx Initial Capacity ). There shall be no cost to Owner for the Xxxxx Initial Capacity
Wastewater Treatment Capacity. [placeholder].

Related to Wastewater Treatment Capacity

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Transport 6.1.1 BellSouth shall provide nondiscriminatory access, in accordance with FCC Rules 51.311, 51.319, and Section 251(c)(3) of the Act to interoffice transmission facilities described in this Section 6 on an unbundled basis to EZ Phone for the provision of a qualifying service, as set forth herein.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

Time is Money Join Law Insider Premium to draft better contracts faster.