Ownership and Location of Metering Equipment Sample Clauses

Ownership and Location of Metering Equipment. The Metering Equipment to be constructed, the capability of the Metering Equipment to be constructed, and the ownership thereof, are identified on the attached Schedule C to this ISA.
AutoNDA by SimpleDocs
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership thereof, as required for the Wholesale Transactions shall be identified on the attached Schedule B to this WMPA, and provided consistent with the PJM manuals.
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership thereof, as required for the Wholesale Transactions shall be identified on the attached Schedule B to this WMPA, and provided consistent with the PJM manuals. SCHEDULES: • SCHEDULE A - SINGLE-LINE DIAGRAM (Showing point of interconnection) • SCHEDULE B - LIST OF METERING EQUIPMENTSCHEDULE C - LIST OF LOCAL/NETWORK UPGRADESSCHEDULE D - APPLICABLE TECHNICAL REQUIREMENTS AND STANDARDSSCHEDULE E - WHOLESALE MARKET PARTICIPANT AGREEMENT TO CONFORM WITH IRS SAFE HARBOR PROVISIONS FOR NON-TAXABLE STATUS • SCHEDULE FSCHEDULE OF NON-STANDARD TERMS & CONDITIONS SCHEDULE A SINGLE-LINE DIAGRAM WHOLESALE MARKET PARTICIPANT’s AGREEMENT TO CONFORM WITH IRS SAFE HARBOR PROVISIONS FOR NON-TAXABLE STATUS
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership thereof, as required for the Wholesale Transactions shall be identified on the attached Schedule B to this WMPA, and provided consistent with the PJM manuals. SCHEDULES: • SCHEDULE A - SINGLE-LINE DIAGRAM (Showing point of interconnection) • SCHEDULE B - LIST OF METERING EQUIPMENTSCHEDULE C - LIST OF LOCAL/NETWORK UPGRADESSCHEDULE D - APPLICABLE TECHNICAL REQUIREMENTS AND STANDARDSSCHEDULE E - WHOLESALE MARKET PARTICIPANT AGREEMENT TO CONFORM WITH IRS SAFE HARBOR PROVISIONS FOR NON-TAXABLE STATUS • SCHEDULE FSCHEDULE OF NON-STANDARD TERMS & CONDITIONS SCHEDULE A SINGLE-LINE DIAGRAM a. Instantaneous net MW for the plant. b. Instantaneous net MVAR for the plant. The Wholesale Market Participant is responsible for installing equipment assuring the following non real-time data is transmitted to PJM as per Manual 14D a. Hourly compensated MWh delivered by the plant. b. Hourly compensated MWh received by the plant. c. Hourly compensated MVARh delivered by the plant. d. Hourly compensated MVARh received by the plant. The equipment required for this installation is a phone circuit such that PSE&G can dial up the meter to retrieve the data and then submit it to PJM. Wholesale Market Participant entered suspension on April 1, 2012 for a period of three years, concluding on April 1, 2015 (the “April 2012 Suspension”). Accordingly, the Parties agree to modify the terms set forth in section 3.1 of this WMPA to reflect that the April 2012 Suspension used all suspension rights available to the Wholesale Market Participant pursuant to this WMPA, and that there shall be no further suspension rights available to the Wholesale Market Participant pursuant to this WMPA. Service Agreement No. 3318 GSRP PROJECT HOLDINGS II, LLC Service Agreement No. 3318 GSRP Project Holdings II, LLC And This Wholesale Market Participation Agreement (“WMPA”) including the Specifications, and Schedules attached hereto and incorporated herein, is entered into in order to effectuate sales of energy and/or capacity into PJM’s wholesale markets, by and between PJM Interconnection, L.L.C., the Regional Transmission Organization for the PJM Region (“Transmission Provider”), GSRP Project Holdings II, LLC (“Wholesale Market Participant” or “GSRP Project Holdings”) and Public Service Electric and Gas Company (“Transmission Owner” or “PSE&G”). This WMPA supersedes the WMPA amon...
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership thereof, as required for the Wholesale Transactions shall be identified on the attached Schedule B to this WMPA, and provided consistent with the PJM manuals. SCHEDULES: • SCHEDULE A - SINGLE-LINE DIAGRAM (Showing point of interconnection) • SCHEDULE B - LIST OF METERING EQUIPMENTSCHEDULE C - LIST OF LOCAL/NETWORK UPGRADESSCHEDULE D - APPLICABLE TECHNICAL REQUIREMENTS AND STANDARDSSCHEDULE E - WHOLESALE MARKET PARTICIPANT AGREEMENT TO CONFORM WITH IRS SAFE HARBOR PROVISIONS FOR NON-TAXABLE STATUS • SCHEDULE FSCHEDULE OF NON-STANDARD TERMS & CONDITIONS SCHEDULE A SINGLE-LINE DIAGRAM a. Hourly compensated MWh received from the Participant Facility to the Transmission Owner; b. Hourly compensated MVARh received from the Participant Facility to the Transmission Owner; c. Hourly compensated MWh delivered from the Transmission Owner to the Participant Facility; d. Hourly compensated MVARh delivered from the Transmission Owner to the Participant Facility; and Instantaneous net MW and MVar per unit values in accordance with PJM Manuals M-01 and M- 14D, and Sections 8.1 through 8.5 of Appendix 2 to the Attachment O of the PJM Tariff.
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership thereof, as required for the Wholesale Transactions shall be identified on the attached Schedule B to this WMPA, and provided consistent with the PJM manuals. SCHEDULES: SCHEDULE A - SINGLE-LINE DIAGRAM (Showing point of interconnection) SCHEDULE B - LIST OF METERING EQUIPMENT SCHEDULE C - LIST OF LOCAL/NETWORK UPGRADES SCHEDULE D - APPLICABLE TECHNICAL REQUIREMENTS AND STANDARDS SCHEDULE E - WHOLESALE MARKET PARTICIPANT AGREEMENT TO CONFORM WITH IRS SAFE HARBOR PROVISIONS FOR NON-TAXABLE STATUS SCHEDULE F - SCHEDULE OF NON-STANDARD TERMS & CONDITIONS SCHEDULE A SINGLE-LINE DIAGRAM
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership
AutoNDA by SimpleDocs
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership thereof as required for Wholesale Market Participant to use the Generating Facility to engage in Wholesale Transactions in PJM’s markets shall be identified in Schedule B to this WMPA, and provided consistent with the PJM Manuals. APPENDICES: • APPENDIX 1 - DEFINITIONS • APPENDIX 2 - STANDARD TERMS AND CONDITIONS SCHEDULES: • SCHEDULE A - SITE PLANSCHEDULE C - LIST OF METERING EQUIPMENTSCHEDULE D - LIST OF NETWORK UPGRADESSCHEDULE E - APPLICABLE TECHNICAL REQUIREMENTS AND STANDARDSSCHEDULE F - SCHEDULE OF NON-STANDARD TERMS AND CONDITIONS 1 Survival:
Ownership and Location of Metering Equipment. The metering equipment to be constructed, the capability of the metering equipment to be constructed, and the ownership thereof, as required for the Wholesale Transactions shall be identified on the attached Schedule B to this WMPA, and provided consistent with the PJM manuals. • SCHEDULE A - SINGLE-LINE DIAGRAM (Showing point of interconnection) • SCHEDULE B - LIST OF METERING EQUIPMENTSCHEDULE C - LIST OF LOCAL/NETWORK UPGRADESSCHEDULE D - APPLICABLE TECHNICAL REQUIREMENTS AND STANDARDSSCHEDULE E - WHOLESALE MARKET PARTICIPANT AGREEMENT TO CONFORM WITH IRS SAFE HARBOR PROVISIONS FOR NON-TAXABLE STATUS a. Instantaneous net MW for each unit. b. Instantaneous net MVAR for each unit. c. Circuit Breaker status. At the Wholesale Market Participant's expense, the Interconnected Transmission Owner will supply and own 25kV bi-directional revenue metering equipment that will provide the following data: a. Hourly compensated MWh received from the plant to the transmission system. b. Hourly compensated MVARh received from the plant to the transmission system. c. Hourly compensated MWh delivered from the transmission system to the plant. d. Hourly compensated MVARh delivered from the transmission system to the plant.

Related to Ownership and Location of Metering Equipment

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!