Examples of PJM System Operator in a sentence
Generator shall request permission from the Transmission Operator, the PJM System Operator or the PJM Interconnection LLC, as applicable, prior to opening and/or closing circuit breakers in accordance with applicable switching and operations procedures and Good Utility Practice.
The PJM System Operator has implemented a system of locational marginal prices, cal- culating prices for over 2.000 nodes every five minutes and providing real-time price of4See Hirst and Hadley (1999), and Stoft (2000) for a discussion of this topic.5Although the design of capacity markets differs from system to system, it should be noted that most of our analysis should be helpful in also clarifying the performance of the capacity markets implemented elsewhere.transmission.
The PJM System Operator has implemented a system of locational marginal prices, cal- culating prices for over 2.000 nodes every five minutes and providing real-time price of4See Joskow and Tirole (2004) and Stoft (2000) for an analysis and discussion of this topic.5Although the design of capacity markets differs from system to system, it should be noted that most of our analysis should be helpful in also clarifying the performance of the capacity markets implemented elsewhere.transmission.
Personnel: On May 13th, Erik Petty successfully passed the PJM System Operator Certification exam.
Local criteria projects are approved by the PJM System Operator Board and included in PJM’s regional plan only to ensure that they are developed in a manner that is consistent with PJM’s overall regional plan.
The voltage regulation equipment will control voltage at the respective Points of Interconnection consistent with the range of voltages prescribed by the Company, or the PJM System Operator, as applicable.
The Producer shall notify the Local System Operator or PJM System Operator, as applicable, if any or all generating units at any Station reach a VAR limit, if there is any deviation from the assigned voltage schedule, or if any automatic voltage regulator is removed from or restored to service.
Both DDS and HLA middleware were configured separately to provide human-in-the-loop simulation.
From time to time, the Local System Operator or the PJM System Operator may require the Producer to provide reactive power from a Station, or to cause a Station to absorb reactive power from the BGE System.
To facilitate such consultation and to the extent the information is not available from the PJM System Operator in a timely manner, in June of each year, or on another date mutually acceptable to the Parties, Generator shall furnish Pepco with non-binding preliminary generator maintenance schedules covering the upcoming two years and any material changes thereto.