We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.

For more information visit our privacy policy.

ATTIC Sample Clauses

ATTIC. There is an attic access in the left utility room. We entered the attic area to perform our inspection. Portions of the attic areas are not accessible to inspection due to limited height clearance and ducting. The attic is framed with 2x6 rafters. The ceilings are framed with 2x6 ceiling joists. The rafters are overlaid with board sheathing. Only minimal ventilation is provided to the attic area. We recommend additional ventilation be provided. Adequate attic ventilation is important to prevent the accumulation of moisture that can cause decay and damage and to prevent excessive attic temperatures. Improved ventilation can reduce attic and interior room temperatures. Several attic vents are not screened. We recommend the vents be screened to prevent animal entry. The attic is insulated with fiberglass xxxxx that are approximately 4 to 7 inches thick. The insulation in the attic vestibules near the furnace has been installed reversed with the paper backing facing the open space. See an example below. Inverted vapor barriers can constitute a fire hazard. A warning to this effect is typically found on the insulation vapor barrier. The vapor barrier should be placed against a solid backing, toward the interior of the dwelling and should never be visible from the crawlspace or the attic. In humid environments, this inversion can also cause the accrual of condensation and can damage framing. We recommend vapor barriers be properly placed.
ATTIC. Attics are not to be used for storage or any type of activity. If evidence is found that access to the attic was committed a $150 restoration fee will be assessed.
ATTICLessee SHALL NOT enter the attic for any other reason other than an emergency. Lessee SHALL NOT store anything in the attic at any time for any reason.
ATTIC. The attic inspection is conducted with several goals in mind. While the attic structure is always the first focus there are also many other important pieces of information gathered here. The underside of the roof is investigated for leaks, attic insulation is evaluated, ventilation is evaluated, bathroom and kitchen vents can often be seen, condensation or mold problems are often revealed. Attics tend to be a home for "do it yourself" electric work such as when people add lights and fans to rooms below. Ducts can often be seen and often found disconnected or lacking insulation. Birds, squirrels, mice, bats, and other pests like to live in your attics as well. In the micro view of the structure we are looking for cracked rafters, broken or incorrectly modified trusses, and spots of rot in under roofs. Those items are important but usually not too difficult to repair. The macro view of structure includes rafter sizing, spans and thrust control, the presence or absence of rafter sag and the resultant bow in exterior walls, overloaded trusses, rafter beam condition and bearing. Insulation in modern attics should be at least R-30 (about 9 1/2"). That is rare in old houses. The newest building code (2009) requires R-38 in new houses. Almost every house has some gaps that could be filled. Attic accesses and whole house fans need to be insulated. Although there is a recent trend toward building conditioned attics with no ventilation that is rare. It is allowed in the building code (with strict requirements) but the method has not withstood the test of time yet. A generalized rule for ventilation is that there should be openings equaling 1/300th of the space being ventilated, and half should be low and half should be high. If it is all high you need to double the size of the opening (typical in older houses). A lack of ventilation is often revealed by condensation stains on the nails coming through the roof from the shingles. Since they are cold in winter the warm air from the house tends to condense on the cold nail tips creating stains and drip marks. Mold growth around xxxxx and incorrectly bath fans is common but should be corrected. You should go up in your attic at least once a year to look for pests (every house gets them eventually), disconnected ducts, displaced insulation (from wind and workmen), condensation, and subtle roof leaks.

Related to ATTIC

  • KITCHEN Black Granite counter top, Stainless steel sink (17'' x 20''), glazed wall tiles up to 2 ft above black granite counter.

  • APPLIANCES The Landlord shall: (check one) ☐ - Provide the following appliances: [ENTER APPLIANCES] ☐ - Not provide any appliances.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Moonlighting Employment as a physician in a professional capacity outside of what is outlined in this Agreement, whether temporary special medical activity (“TSMA”) or external moonlighting, must be approved in writing, in advance, by the Departmental Chair, Program Director and Director of Graduate Medical Education (or designee). Even if approved, professional and general liability insurance as outlined in Section 5.4 is not provided to Trainee engaged in external moonlighting. Trainee acknowledges he or she has the responsibility to obtain insurance for such engagement. TSMA and external moonlighting must be included and reported as part of Trainee's hours spent on clinical experience and education. Trainee shall not be required to engage in any outside work.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Dressing Rooms 42.1 Adequate dressing rooms with standard size lockers and sitting areas shall be provided if the physical facilities permit.

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.