Billing Disputes and Final Accounting. (a) If Oglethorpe Power questions or contests the amount of any payment claimed by Georgia Power to be due pursuant to this Agreement, Oglethorpe Power may make such payment under protest and thereafter shall be reimbursed by Georgia Power for any amount in error after the settlement of such question or contest, in accordance with this Section 17.2; provided, however, that no disagreement or dispute of any kind between Oglethorpe Power and Georgia Power concerning any matter, including without limitation the amount of any payment due from Oglethorpe Power or the correctness of any charge made by Georgia Power to Oglethorpe Power, shall permit Oglethorpe Power to delay or withhold any payment pursuant to this Agreement. (b) In the event that Oglethorpe Power, by timely notice to Georgia Power, questions or contests the correctness of any such charge or credit, Georgia Power shall promptly review the questioned charge or credit and shall notify Oglethorpe Power, within sixty (60) Days following receipt by Georgia Power of such notice from Oglethorpe Power, of the amount of any error and the amount of any payment or reimbursement that Oglethorpe Power is required to make or is entitled to receive in respect of such alleged error. Not later than the tenth (10th) banking Day after receipt by Oglethorpe Power of such notice from Georgia Power as to the amount of any payment that Oglethorpe Power is required to make, Oglethorpe Power shall make payment to Georgia Power in immediately available funds. If Georgia Power is required to make any reimbursement to Oglethorpe Power, Georgia Power shall make such reimbursement not later than the tenth (10th) banking Day after Georgia Power receives an invoice from Oglethorpe Power in the amount of such required reimbursement. Payments and reimbursements made by either Oglethorpe Power or Georgia Power under this Section 17.2(b) shall include interest from the date the original payment was due until the date such payment or reimbursement together with interest is made, which interest shall accrue in simple interest terms per annum at the Interest Rate defined herein. Oglethorpe Power shall have until the 180th Day after receipt of an invoice to question or contest the correctness of any charge or credit made to Oglethorpe Power during such Month pursuant to Section 17.1, after which time the correctness of all such charges and credits shall be conclusively presumed. (c) If Oglethorpe Power disputes Georgia Power's resoluti...
AutoNDA by SimpleDocs
Billing Disputes and Final Accounting. 8.2.1 If either Party after receiving a statement or bill reasonably questions or contests the amount or propxxxxy of any payment or amount claimed by the billing Party to be due pursuant to this Agreement, the billed Party shall provide the billing Party with written notice of the disputed amount. [redacted]. 8.2.2 In the event that the billed Party questions or contests the correctness of any such charge or credit, the billing Party shall promptly review the questioned charge or credit and shall notify the billed Party of any error in its determination of amounts owed and the amount of any payment that the billed Party is required to make in respect of such redetermination. Not later than the [redacted] after receipt by LEM of any such notice from Georgia Power as to the amount of any Monthly Capacity Payments, Monthly Energy Payments or Start-Up Payments that LEM is required to make, LEM shall make payment to Georgia Power in immediately available funds. Not later than [redacted] after receipt by Georgia Power of any such notice from LEM as to the amount of any payment [redacted] that Georgia Power is required to make, Georgia Power shall make payment or credit as appropriate, to LEM in immediately available funds. If the billed Party disagrees with the billing Party's resolution of a question or contest, then the dissatisfied billed Party may seek settlement through further negotiations or legal action, subject to the provisions of Section 8.3. Payments made by a Party under this Section 8.2.2 shall include interest at the Interest Rate from the date the original payment was due until the date such payment together with interest at the Interest Rate is made. The billed Party shall have until the end of [redacted] after its receipt of any invoice or statement to question or contest the correctness of any charge or credit on such invoice or statement.
Billing Disputes and Final Accounting. 9.2.1 The Parties shall each have until the three hundred sixty-fifth (365th) Day after receipt of a Monthly invoice to question or contest the correctness of any charge or credit set forth in such invoice. If no question or contest is raised during such time period, the correctness of all such charges and credits shall be conclusively presumed. 9.2.2 In the event a Party questions or contests the correctness of any invoiced amount, whether a charge or a credit, of any payment claimed by the other Party to be due pursuant to this Agreement, such Party shall provide written
Billing Disputes and Final Accounting. 6.2.1 If Buyer questions or contests the amount or propriety of any payment claimed by Seller to be due pursuant to this Agreement, Buyer shall make payment to Seller of amounts not in dispute, but may withhold amounts disputed in good faith until after the settlement of such question or contest in accordance with this Section 6.2. Notwithstanding the foregoing, Buyer shall not be entitled to withhold any Taxes paid by Seller which are, as between Buyer and Seller, the undisputed obligation of Buyer pursuant to Section 3.5. At the time of any such withholding, Buyer shall provide Seller with a written explanation of Buyer’s reasons therefore; provided, however, that the failure of Buyer to provide such explanation shall not alter its right to withhold unless Buyer also fails to provide such written explanation within five (5) Business Days of receipt of Seller’s written inquiry concerning such withholding. 6.2.2 In the event Buyer questions or contests the correctness of any charge or credit, Buyer shall provide Seller with written notice of such amount and the basis for Buyer’s question or contest. Seller shall promptly review the questioned charge or credit and shall notify Buyer of any error in Seller’s determination of amounts owed by Buyer and issue an amended invoice in the amount of any payment that Buyer is required to make in respect of such redetermination. If Buyer disputes in good faith Seller’s amended invoice amount, then the matter shall be resolved pursuant to the provisions of Article 20 applicable to billing disputes. To the extent Seller disagrees with Buyer’s basis for questioning the original invoice, Seller shall provide a written explanation of its position. 6.2.3 Seller shall have until the end of one (1) year after the delivery of energy under this Agreement to correct any invoice for payment due for such energy and associated capacity and deliver a corrected invoice to Buyer. Buyer shall have until the end of one (1) year after its receipt of any invoice to question or contest the correctness of any charge or credit made to Buyer on such invoice. If Buyer has made payment under an invoice and thereafter questions or contests the correctness thereof, Seller shall not be required to refund any payment received from Buyer until such time as it is finally determined that Seller’s invoice was in error.
Billing Disputes and Final Accounting. 6.2.1 If, after receiving a Monthly invoice (or any other statement or xxxx), FPUC reasonably questions or contests the amount or propriety of any payment or amount claimed by Gulf Power to be due pursuant to this Agreement, FPUC shall provide Gulf Power with written notice of such disputed invoice amount. Notwithstanding the notice of a disputed invoice amount, FPUC shall make payments in full in accordance with such disputed invoice and adjustments with interest shall subsequently be made, if appropriate, as set forth below. 6.2.2 FPUC shall have 12 Months after the receipt of any Monthly invoice (or any other statement or xxxx) to question or contest the amount or propriety of any charge or credit on such invoice or statement. In the event that FPUC questions or contests any such charge or credit, Gulf Power shall promptly review the questioned charge or credit and shall notify FPUC of any error in the determination of amounts reflected on such disputed invoice and the amount of any adjusted payment that either Party is required to make as a result of such re-determination. The Party required to make such payment shall make payment to the other Party in immediately available funds by the later of: (i) 10 Days after receipt by FPUC of any such notice of re-determination from Gulf Power as to the adjusted amount; or (ii) the Due Date for the next Monthly invoice. Payments made by a Party under this Section 6.2.2 shall include interest at the Interest Rate from the date the original payment was due until the date such payment together with interest at the Interest Rate is made.
Billing Disputes and Final Accounting. 9.2.1 The Parties shall each have until the three hundred sixty-fifth (365th) Day after receipt of a Monthly invoice to question or contest the correctness of any charge or credit set forth in such invoice. If no question or contest is raised during such time period, the correctness of all such charges and credits shall be conclusively presumed. 9.2.2 In the event a Party questions or contests the correctness of any invoiced amount, whether a charge or a credit, of any payment claimed by the other Party to be due pursuant to this Agreement, such Party shall provide written notice to the other Party (the “Billing Dispute Notice”) that: (a) states the good faith basis for the dispute, (b) specifies the portion of the invoiced amount in dispute, if any, and (c) provides documentation reasonably supporting the determination of the disputed amount. 9.2.3 In the event that a Party, by timely notice in accordance with Sections 9.2.1 and 9.2.2, questions or contests the correctness of any charge or credit, the other Party shall promptly review the questioned charge or credit and shall notify such Party, within twenty (20) Days following receipt by the other Party of the Billing Dispute Notice, of the amount of any error and the amount of any reimbursement, if any, that such Party is entitled to receive with respect to such alleged error (the “Dispute Review Notice”). Reimbursements determined to be due from a Party under this Section 9.2.3 shall be included on the next Monthly invoice and shall include interest from the date the original payment was received until the date such reimbursement together with interest is invoiced, which interest shall be compounded Monthly at the Interest Rate. 9.2.4 In the event a Party disputes the other Party’s resolution under Section 9.2.3 of any question or contest by such Party of the correctness of any charge or credit contained in a Monthly invoice, then the Parties shall submit the dispute for resolution in accordance with Article 16.
Billing Disputes and Final Accounting. 6.2.1 If a Party questions or contests the amount or propriety of any payment claimed by the other Party to be due pursuant to this Agreement, the questioning or contesting Party shall make payment to the other Party [redacted] until after the settlement of such question or contest in accordance with this Section 6.2. At the time of any such withholding, the questioning or contesting Party shall provide the other Party with a written explanation of the reasons for withholding payment; provided, [redacted]. 6.2.2 In the event a Party questions or contests the correctness of any charge or credit, such Party shall provide the other Party with written notice of such amount and the basis for the question or contest. The other Party shall promptly review the questioned charge or credit and shall notify the questioning or contesting Party of any error in the determination of amounts owed and issue an amended invoice in the amount of any payment that the questioning or contesting Party is required to make in respect of such redetermination. If the questioning or contesting Party disputes in good faith the amended invoice amount, then if agreed by the Parties, such Party may submit the matter for dispute resolution. To the extent a Party disagrees with the other Party's basis for questioning the original invoice, it shall provide a written explanation of its position. 6.2.3 Each Party shall have until the end of one (1) year after the delivery of an invoice to correct or dispute the invoice. If a Party has made payment under an invoice and thereafter questions or contests the correctness thereof, the other Party shall not be required to refund any payment received until such time as it is finally determined that the invoice was in error.
AutoNDA by SimpleDocs
Billing Disputes and Final Accounting. 35 9.3 INTEREST.............................................................................................36 9.4

Related to Billing Disputes and Final Accounting

  • Billing and Payment Procedures and Final Accounting 6.1.1 The Connecting Transmission Owner shall xxxx the Interconnection Customer for the design, engineering, construction, and procurement costs of Interconnection Facilities and Upgrades contemplated by this Agreement on a monthly basis, or as otherwise agreed by those Parties. The Interconnection Customer shall pay all invoice amounts within 30 calendar days after receipt of the invoice. 6.1.2 Within three months of completing the construction and installation of the Connecting Transmission Owner’s Interconnection Facilities and/or Upgrades described in the Attachments to this Agreement, the Connecting Transmission Owner shall provide the Interconnection Customer with a final accounting report of any difference between (1) the Interconnection Customer’s cost responsibility for the actual cost of such facilities or Upgrades, and (2) the Interconnection Customer’s previous aggregate payments to the Connecting Transmission Owner for such facilities or Upgrades. If the Interconnection Customer’s cost responsibility exceeds its previous aggregate payments, the Connecting Transmission Owner shall invoice the Interconnection Customer for the amount due and the Interconnection Customer shall make payment to the Connecting Transmission Owner within 30 calendar days. If the Interconnection Customer’s previous aggregate payments exceed its cost responsibility under this Agreement, the Connecting Transmission Owner shall refund to the Interconnection Customer an amount equal to the difference within 30 calendar days of the final accounting report. 6.1.3 If the Interconnection Customer disputes an amount to be paid, the Interconnection Customer shall pay the disputed amount to the Connecting Transmission Owner or into an interest bearing escrow account, pending resolution of the dispute in accordance with Article 10 of this Agreement. To the extent the dispute is resolved in the Interconnection Customer’s favor, that portion of the disputed amount will be credited or returned to the Interconnection Customer with interest at rates applicable to refunds under the Commission’s regulations. To the extent the dispute is resolved in the Connecting Transmission Owner’s favor, that portion of any escrowed funds and interest will be released to the Connecting Transmission Owner.

  • Billing Disputes 7.6.3.1 Each Party agrees to notify the other Party upon the discovery of a billing dispute. In the event of a billing dispute, the Parties will endeavor to resolve the dispute within sixty (60) calendar days of the Xxxx Date on which such disputed charges appear. Resolution of the dispute is expected to occur at the first level of management resulting in a recommendation for settlement of the dispute and closure of a specific billing period. If the issues are not resolved within the allotted time frame, the following resolution procedure will begin: 7.6.3.2 If the dispute is not resolved within sixty (60) days of the Xxxx Date, the dispute will be escalated to the second level of management for each of the respective Parties for resolution. If the dispute is not resolved within ninety (90) days of the Xxxx Date, the dispute will be escalated to the third level of management for each of the respective Parties for resolution 7.6.3.3 If the dispute is not resolved within one hundred and twenty (120) days of the Xxxx Date, the dispute will be escalated to the fourth level of management for each of the respective Parties for resolution. 7.6.3.4 If a Party disputes a charge and does not pay such charge by the payment due date, such charges shall be subject to late payment charges as set forth in the Late Payment Charges provision of this Attachment. If a Party disputes charges and the dispute is resolved in favor of such Party, the other Party shall credit the xxxx of the disputing Party for the amount of the disputed charges along with any late payment charges assessed no later than the second Xxxx Date after the resolution of the dispute. Accordingly, if a Party disputes charges and the dispute is resolved in favor of the other Party, the disputing Party shall pay the other Party the amount of the disputed charges and any associated late payment charges assessed no later than the second xxxx payment due date after the resolution of the dispute. BellSouth shall only assess interest on previously assessed late payment charges in a state where it has authority pursuant to its tariffs.

  • Final Accounting Upon the dissolution of the Company, a proper accounting shall be made from the date of the last previous accounting to the date of dissolution.

  • Accounting and Financial Determinations Unless otherwise specified, all accounting terms used herein shall be interpreted, all accounting determinations and computations hereunder or thereunder (including under Clause 9.4 (Financial Condition)) shall be made, and all financial statements required to be delivered hereunder or thereunder shall be prepared, in accordance with GAAP consistently applied (or, if not consistently applied, accompanied by details of the inconsistencies); provided that if the Borrower elects to apply or is required to apply IFRS accounting principles in lieu of GAAP, upon any such election and notice to the Facility Agent, references herein to GAAP shall thereafter be construed to mean IFRS (except as otherwise provided in this Agreement); provided further that if, as a result of (a) any change in GAAP or IFRS or in the interpretation thereof or (b) the application by the Borrower of IFRS in lieu of GAAP, in each case, after the date of any financial statements referred to in Clause 8.1 (Financial Information, Reports, Notices, etc.), there is a change in the manner of determining any of the items referred to herein or thereunder that are to be determined by reference to GAAP, and the effect of such change would (in the reasonable opinion of the Borrower or the Facility Agent) be such as to affect the basis or efficacy of the financial covenants contained in Clause 9.4 (Financial Condition) in ascertaining the consolidated financial condition of the Borrower and its Subsidiaries and the Borrower notifies the Facility Agent that the Borrower requests an amendment to any provision hereof to eliminate such change occurring after the date hereof in GAAP or the application thereof on the operation of such provision (or if the Facility Agent notifies the Borrower that the Required Lenders request an amendment to any provision hereof for such purpose), then such item shall for the purposes of Clause 9.4 (Financial Condition) continue to be determined in accordance with GAAP relating thereto as if GAAP were applied immediately prior to such change in GAAP or in the interpretation thereof until such notice shall have been withdrawn or such provision amended in accordance herewith. Notwithstanding the foregoing, all obligations of any person that are or would be characterized as operating lease obligations in accordance with GAAP on the B34 Facility Amendment Date (whether or not such operating lease obligations were in effect on such date) shall continue to be accounted for as operating lease obligations for the purposes of this Agreement regardless of any change in GAAP following the B34 Facility Amendment Date that would otherwise require such obligations to be recharacterized (on a prospective or retroactive basis or otherwise) as capital leases.

  • Additional Accounting Services Ultimus shall also perform the following additional accounting services for each Portfolio: (i) Provide monthly (or as frequently as may reasonably be requested by the Trust or a Portfolio's investment adviser) a set of financial statements for each Portfolio as described below, upon request of the Trust: Statement of Assets and Liabilities Statement of Operations Statement of Changes in Net Assets Security Purchases and Sales Journals Portfolio Holdings Reports (ii) Provide accounting information for the following: (A) federal and state income tax returns and federal excise tax returns; (B) the Trust's semi-annual reports with the SEC on Form N-SAR; (C) the Trust's annual, semi-annual and quarterly (if any) shareholder reports; (D) registration statements on Form N-1A and other filings relating to the registration of shares; (E) Ultimus' monitoring of the Trust's status as a regulated investment company under Subchapter M of the Internal Revenue Code, as amended; (F) annual audit by the Trust's auditors; and (G) examinations performed by the SEC.

  • Disputes and Governing Law This Agreement shall be construed in accordance with the laws of the PRC. Any disputes that arise in connection with this Agreement shall be litigated in courts located within the Pudong New Area, Shanghai, the PRC.

  • Disputes Procedure 12.1 If a dispute relating to a Script covered by this Agreement arises between a Writer and the BBC which cannot be settled by direct discussion then either party will have the right to refer the issue to a panel which shall consist of the Head of Talent & Rights Negotiation Group the relevant head of the production department and two of the Writer, the Writer’s representative or representative of the Society, the WGGB or the PMA, at the Writer’s election. This clause shall not however be invoked in a manner which might override any other clause in this Agreement or call into question the BBC’s reasonable and proper discretion to accept or reject a Script. 12.2 Any dispute regarding the interpretation of this Agreement or the interpretation of an individual contract between the BBC and a writer of a Script covered by this Agreement which cannot be resolved by discussion between the parties shall be referred to an Arbitration Committee consisting of two representatives of the BBC and any two of the Writer or Writer’s representative or representative of the Society, the Guild or the PMA as the case may be. Failing settlement it shall then be referred to a single Arbitrator mutually acceptable to both sides who shall determine the issue and whose decision shall be binding on both parties. 12.3 Clause 12.2 shall not apply to disputes arising under clause 12.1, 16.1 and 20-25.

  • Resolving Disputes The Company and the customer will use all reasonable endeavours to resolve any dispute between them. If they cannot resolve their dispute between them, they will:- a. Refer the dispute to mediation which will be conducted in accordance with the Resolution Institute New Zealand Standard Mediation Agreement; and b. If mediation is unsuccessful, the matter of dispute shall be referred to a single arbitrator in accordance with the provisions contained in the Arbitration Xxx 0000 and any amendments. Nothing in this clause will preclude either party from taking immediate steps to seek urgent equitable relief before an appropriate Court.

  • Billing and Payment Procedure for Forest Products Delivered The State will compute and forward to Purchaser a billing statement of charges for forest products delivered during the billing period at the delivered rate shown in P- 028.2 clause. After receipt of the billing statement, Purchaser’s payment must be received by the Department of Natural Resources on or before the due date shown on the billing statement. Purchaser agrees to make payment, payable to the Department of Natural Resources. Failure to pay on time for forest products delivered is considered a breach of contract. Included with the billing statement will be a summary report for the billing period compiled by the State or their log and load reporting service. The State will adjust final xxxxxxxx to account for any State approved payment reductions. Advance payments made under P-045 or P-045.2 remaining on account above the value for the charges shall be returned to Purchaser within 30 days following the final report of charges. Refunds not made within the 30 day period will accrue interest at the interest rate, as established by WAC 000-000-000, computed on a daily basis until paid.

  • Reporting and Payment Procedures The Sub-recipient shall report at least quarterly all expenses incurred and associated project activities carried out with CDBG and non-CDBG funds. The Sub-recipient shall follow the reimbursement request process as set forth by the County and CDBG program administrator. Reimbursements are subject to the following but not limited to: eligibility of expenses, proper reporting and expense documentation, availability of funds, and authorization by the County and CDBG program administrator. DocuSign Envelope ID: E4D55B2A-BBB1-48FF-A259-0798F37C0F0E