City May Correct Defective Work Sample Clauses

City May Correct Defective Work. If the Contractor fails within a reasonable time after written notice of the Project Manager to proceed to correct defective Work or to remove and replace rejected Work as required by the Project Manager in accordance with Paragraph 11.5, or if the Contractor fails to perform the Work in accordance with the Contract Documents, the City may, after seven (7) days written notice to the Contractor, correct and remedy any such deficiency. In exercising its rights under this paragraph, the City shall proceed expeditiously. To the extent necessary to complete corrective and remedial action, the City may exclude the Contractor from all or part of the site, take possession of all or part of the Work, suspend the Contractor’s services related thereto and take possession of the Contractor’s tools, construction equipment and materials stored at the site or elsewhere. The Contractor shall allow the City’s representative agents and employees such access to the site as may be necessary to enable the City to exercise its rights under this paragraph. All direct and indirect costs of the City in exercising such rights shall be charged against the Contractor in an amount verified by the Project Manager, and a Change Order shall be issued incorporating the necessary revisions in the Contract Documents and a reduction in the Contract Price. Such direct and indirect costs shall include, in particular but without limitation, compensation for additional professional services required and costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of the Contractor’s defective Work. The Contractor shall not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise by the City of the City’s right hereunder.
AutoNDA by SimpleDocs
City May Correct Defective Work. A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency.
City May Correct Defective Work. 11.12 If the Design-Builder fails, within three days after written notice from the City, to proceed to correct, or to remove and replace Defective Work as required by the City, or if the Design- Builder fails to perform the Work in accordance with this Contract (including any requirements of the work progress schedule), the City may correct and remedy any such deficiency. In exercising the rights under this paragraph, the City will proceed expeditiously. To the extent necessary to complete corrective and remedial action, the City may: (1) exclude the Design- Builder from all or part of the site; (2) take possession of all or part of the site; (3) suspend the Design-Builder’s services related thereto; (4) take possession of the Design-Builder’s tools, appliances, construction equipment and machinery at the site; and (5) incorporate in the Work material stored at the site or for which the City has paid the Design-Builder but which has been stored elsewhere. The Design-Builder shall allow the City’s representatives, contractors, agents, and employees such access to the site as may be necessary to exercise the rights under this paragraph. All direct and indirect costs in exercising such rights will be charged against the Design-Builder. A Change Order will be executed incorporating the necessary revisions to this Contract and a reduction in the Guaranteed Maximum Price. Such direct and indirect costs will include, in particular but without limitation: (1) additional professional services required; and (2) repair and replacement of the Work of others destroyed or damaged by correction, removal, or replacement of the Design-Builder’s Defective Work. The Design-Builder will not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise of the City’s rights under this section.

Related to City May Correct Defective Work

  • Correction of Defective Work 2.10.1 Design-Builder agrees to correct any Work that is found to not be in conformance with the Contract Documents, including that part of the Work subject to Section 2.9 hereof, within a period of one year from the date of Substantial Completion of the Work or any portion of the Work, or within such longer period to the extent required by the Contract Documents.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Defective Work Work that, for any reason, is not in compliance with the Contract Documents. Defective Work is usually identified in a Notice of Non-Compliant Work.

  • Return of Materials Pertaining to Work Product Upon the request of Customer, but in any event upon termination or expiration of this Contract or a Statement of Work, Vendor shall surrender to Customer all documents and things pertaining to the Work Product, including but not limited to drafts, memoranda, notes, records, drawings, manuals, computer software, reports, data, and all other documents or materials (and copies of same) generated or developed by Vendor or furnished by Customer to Vendor, including all materials embodying the Work Product, any Customer confidential information, or Intellectual Property Rights in such Work Product, regardless of whether complete or incomplete. This section is intended to apply to all Work Product as well as to all documents and things furnished to Vendor by Customer or by anyone else that pertain to the Work Product.

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain.

  • Unsafe Work Conditions No employee shall be disciplined for refusal to work on an assignment which, in the opinion of:

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!