Cost Control Subsystem Sample Clauses

Cost Control Subsystem. The operation of this subsystem shall provide sufficient timely cost data and detail to permit Construction Contractor to control and adjust the Project requirements, needs, materials, equipment and systems by building and site elements so that the Work will be completed at a cost which, together with the Construction Management Fee, will not exceed the GMP. Requirements of this subsystem include submissions at the following phases of the Project: 4.1 Pre-Construction Phase Estimates; and 4.2 At establishment of the GMP.
AutoNDA by SimpleDocs
Cost Control Subsystem. (1) The operation of this subsystem shall provide sufficient timely data and detail to permit the Construction Team to control and adjust the project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the maximum total project budget. Requirements of this subsystem include formal estimates at the following phases of the project: (a) At Completion of Advanced Schematic Design Phase for each item or bid package. (b) At Completion of Design Development Phase for each item or bid package. (c) At Completion of 50% Construction Documents for each item or bid package. (d) Within 10 (ten) days of any Change Order or Construction Change Directive being proposed.
Cost Control Subsystem. The operation of this subsystem shall provide sufficient timely data and detail to permit the Construction Team to control and adjust the project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the maximum total project budget. Requirements of this subsystem include the following submissions at the following phases of the project:
Cost Control Subsystem. The operation of this subsystem shall provide sufficient timely data and detail to permit the Construction Team to control and adjust the project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the maximum total project budget. Requirements of this subsystem include as a minimum the following submissions at the following phases of the project: This schedule shall be modified to match the PAE agreement or when the CM is contracted. (a) At completion of Schematic Design Phase I, for Each Item or scope of work. (b) At Completion of Preliminary Design Phase II, for Each Item or scope of work. (c) At Completion of 66% Construction Documents Phase III, for Each Item or scope of work. (d) At establishment of any partial and final Guaranteed Maximum Price.
Cost Control Subsystem. The operation of this subsystem shall provide sufficient timely data and detail to permit the Construction Team to control and adjust the project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the maximum total project budget. Requirements of this subsystem include as a minimum the following submissions at the following phases of the project: (a) At completion of Schematic Design Phase I, for Each Item or scope of work. (b) At Completion of Preliminary Design Phase II, for Each Item or scope of work. (c) At Completion of 66% Construction Documents Phase III, for Each Item or scope of work. (d) At establishment of any partial and final Guaranteed Maximum Price.
Cost Control Subsystem. (1) The operation of this subsystem shall provide sufficient timely data and detail to permit the Construction Team to control and adjust the project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the maximum total project budget. Requirements of this subsystem include formal estimates at the following phases of the project: (a) At Completion of Advanced Schematic Design Phase For Each Item or Bid Package. (b) At Completion of Design Development Phase For Each Item or Bid Package. (c) At Completion of 50% Construction Documents Phase For Each Item Or Bid Package. (d) Within 10 (ten) days of any Change Order or Construction Change Directive being proposed.
Cost Control Subsystem. The operation of this subsystem shall provide sufficient timely data and detail to permit the Construction Team to control and adjust the Project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other Project costs, will not exceed the maximum total Project budget. Requirements of this subsystem include the following submissions at the following phases of the project: 1. Estimates – Prior to the start of pre-construction services, the requirement of the following estimates will be determined by the Owner: A. Schematic Documents are complete for scope verification budgeting per MOU B. Completion of 75% Design Development Documents. C. Completion of 100% Design Development Documents. D. 100% GMP Estimate – When the Construction Documents are sufficiently complete enough to establish the GMP. It is noted that drawings will be released in stages and priced as such.
AutoNDA by SimpleDocs
Cost Control Subsystem. The operation of this subsystem shall provide sufficient timely data and detail to permit the Construction Team to control and adjust the project requirements, needs, materials, equipment and systems by building and site elements so that construction will be completed at a cost which, together with all other project costs, will not exceed the maximum total project budget. Requirements of this subsystem include the following submissions at the following phases of the project: 1. At completion of Advanced Schematic Preconstruction Phase for each item or bid package. 2. At completion of Design Development Phase for each item or bid package. 3. At completion of 100% Construction Documents Phase for each item or bid package. 4. At establishment of the Guaranteed Maximum Price.

Related to Cost Control Subsystem

  • Cost Control The Construction Manager shall develop a system of cost control for the Work, including regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes. The Construction Manager shall identify variances between actual and estimated costs and report the variances to the Owner and Architect, and shall provide this information in its monthly reports to the Owner and Architect, in accordance with Section 3.3.2.3 above.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos. b. Each party agrees to use, and to cause its Permitted Sublicensees to use, the other party’s trademarks only in good faith and in a dignified manner consistent with such party’s use of the trademarks. Upon written notice to the breaching party, the breaching party has 30 days of the date of the written notice to cure the breach or the license will be terminated.