Design and Construction Administration Services Sample Clauses

Design and Construction Administration Services. A fixed fee of $25,000.00 ($25,000.00 (fixed fee)/$312,500.00 (est. construction cost) = 8.0%*) *This percentage will be applied to all future contract sum changes for A/E increased compensation only when the A/E has provided additional services and/or there has been an addition to the A/E’s scope of work directly related to the additional construction cost per the applicable Base A/E Agreement and Health and Human Services Commission’s Architectural/Engineering Guidelines. There will be no change to A/E compensation if there is no A/E additional services or increase in A/E scope directly related to additional construction cost.
AutoNDA by SimpleDocs
Design and Construction Administration Services. The following information is a general description of the design and construction administration services required for the Luke Air Force Base Wastewater Services (Project) project. The services listed may include, but are not limited to, the following:
Design and Construction Administration Services. These services are for designer-related activities associated with projects anticipated to be Chapter 30 §39M construction projects including:
Design and Construction Administration Services 

Related to Design and Construction Administration Services

  • Construction Administration Services The Engineer shall perform construction administration services during construction as necessary. Such services shall, as part of the services to be rendered for the Engineer's established fee, include as much of the Engineer's professional services and the services of the Engineer's consultants as the State deems necessary for the well-being of the project and efficient prosecution of the construction work, but shall not include the Engineer's undertaking continuous on-site observation of the work. If the Engineer fails to perform such duties in a conscientious and reasonable manner, the State may exercise its right to terminate this contract as hereinafter provided in Section T. Additionally, it is understood and agreed to by the Engineer and the State that the duties of the Engineer shall include, but not be limited to, the following services:

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Construction Administration Redeveloper shall be responsible for all components of the Redeveloper Improvements constructed by Redeveloper including construction management, coordination of contractors and regulatory permitting and other requirements. Redeveloper and its contractor(s) shall reasonably cooperate with City contractors performing work in the vicinity of the Redevelopment Project Area including, but not limited to, Redeveloper's scheduling of its work to provide for a smooth sequence of operations. The Redeveloper will be solely responsible for payment of all construction costs for the Redeveloper Improvements as set forth in this Redevelopment Agreement.

  • COMPENSATION FOR CONSTRUCTION PHASE SERVICES 5.1 For the Construction Manager’s performance of the Work as described in Section 2.3, the Owner shall pay the Construction Manager the Contract Sum in current funds. The Contract Sum is the Cost of the Work as defined in Section 6.1.1 plus the Construction Manager’s Fee.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

  • Project Management Services Contractor shall provide business analysis and project management services necessary to ensure technical projects successfully meet the objectives for which they were undertaken. Following are characteristics of this Service:

  • Construction Administration Phase Delete the following paragraph if Submittal Exchange isn’t going to be used: 2.2.2.

  • Construction Services 3.1.1 Basic Construction Services. 3.1.2 Meetings and Schedule Updates.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!