Detailed Design Drawings Sample Clauses

Detailed Design Drawings. Consultant shall prepare detailed design review packages at 60%, 90% and 100% (final) design completions. Consultant shall submit specifications and half-sized (11” x 17”) drawings for the City’s review at these milestones. Design review packages shall include progressively more detailed design drawings and specifications from 60% to 100% (final) completion. During the detailed design phase, the Consultant shall develop up to 220 design drawings based on the improvements shown in the 30% design package. Potholing or the relocation of existing buried utilities are not included in Consultant’s scope of work. It is anticipated that there will be approximately 170 drawings included with the 60% design submittal, with the remaining drawings developed between the 60% design stage and 90% design. Consultant shall coordinate the preparation of the 60% design documents with the appropriate disciplines. Drawing groupings shall be organized by building, instead of by discipline, except for mechanical schedules. Mechanical schedules sheets for all of the buildings in the project will be included with the General sheets. At this point, all major design decisions should have been documented clearly by Consultant and agreed by the City, and all outstanding issues from the 30% design package must be resolved. The 90% design documents shall be functionally complete such that they are ready for final review and will only need minor adjustments prior to bidding. Consultant shall incorporate City’s comments on the 60% and 90% design completions into the 90% and 100% designs, respectively. Consultant shall also respond to the list of comments and questions received from the City prior to the issuance of the subsequent design review package. Consultant shall develop construction drawings using Consultant’s computer-aided design (“CAD”) standards, and shall include applicable general, civil, structural, mechanical, electrical, and instrumentation drawings.
AutoNDA by SimpleDocs
Detailed Design Drawings. (a) Must be approved in detail by the Electric Department. Up to 5 working days should be allowed for review of each drawing submission.
Detailed Design Drawings. The Concessionaire shall prepare all detailed design drawings necessary to construct the Port Facility. All drawings shall be submitted to the Independent Engineer/Grantor for approval at least forty-four

Related to Detailed Design Drawings

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.