Develop Preliminary Construction and Procurement Specifications Sample Clauses

Develop Preliminary Construction and Procurement Specifications. During the 60 percent design phase, project assumptions, design criteria, and project requirements from the Basis of Design Report will be implemented. This design phase will execute individual portions of this project as described below:  Medium Voltage Primary Switchgear Implementing the design of medium voltage primary switchgear replacement will take place during the 60 percent design phase. In this phase, the project team will begin design implementation with a review of the medium voltage switchgear replacement narrative in the BODR. After comments and concerns are addressed by the project team, BC will verify proposed plans and existing switchgear equipment in the field. Upon completion of field verification, BC will update schematic (one-line) drawings to include new switchgear equipment and update plan drawings to show proposed location of new switchgear equipment. During this phase, a preliminary grounding plan as well as mounting details for the new medium voltage switchgear will be developed. Also during the 60 percent design phase, BC will refine duct bank, manhole, and handhole schedules for the underground routing of 15kV cables to feed existing loads from switchgear 78A, 78B, 78C, and 78D. BC will coordinate with the owner and contractor teams to develop a construction sequence during the 60 percent design phase. This construction sequence will facilitate a seamless transition from the old medium voltage switchgear over to the new installment.  Replacement of the 750kVA transformers The 60 percent design phase will enable design of the two 750kVA transformer replacements. This design implementation will proceed following the review of the transformer replacement narrative in the BODR. After comments and concerns are addressed by the project team, BC will verify proposed plans and existing transformer equipment in the field. Following the field verification, BC will update schematic (one-line) drawings to include new transformer equipment and update plan drawings to show proposed location of new transformers and any conduit or ductbank routing required. During this phase, a preliminary grounding plan as well as mounting details for the new transformers will be developed. Transformer models will be further defined during the 60 percent design phase as well. The 60 percent design phase will facilitate more complete duct bank, manhole, and handhole schedules for the underground routing of 15kV cables that feed the transformers. BC will also r...

Related to Develop Preliminary Construction and Procurement Specifications

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • The Specifications The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Changes to Specifications All Specifications and any changes thereto agreed to by the parties from time to time shall be in writing, dated and signed by the parties. Any change to the Process shall be deemed a Specification change. No change in the Specifications shall be implemented by Catalent, whether requested by Client or requested or required by any Regulatory Authority, until the parties have agreed in writing to such change, the implementation date of such change, and any increase or decrease in costs, expenses or fees associated with such change (including any change to Unit Pricing). Catalent shall respond promptly to any request made by Client for a change in the Specifications, and both parties shall use commercially reasonable, good faith efforts to agree to the terms of such change in a timely manner. As soon as possible after a request is made for any change in Specifications, Catalent shall notify Client of the costs associated with such change and shall provide such supporting documentation as Client may reasonably require. Client shall pay all costs associated with such agreed upon changes. If there is a conflict between the terms of this Agreement and the terms of the Specifications, this Agreement shall control. Catalent reserves the right to postpone effecting changes to the Specifications until such time as the parties agree to and execute the required written amendment.

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Approval of Plans and Specifications The Plans and Specifications will conform to the requirements and conditions set out by applicable law or any effective restrictive covenant, and to all governmental authorities which exercise jurisdiction over the Leased Premises or the construction thereon.