FALSE CEILING Sample Clauses

FALSE CEILING. The rates shall include for: All necessary labour, materials and use of tools and equipments for the satisfactory completion of the job. Work at all heights. Work in narrow widths and all locations as called for and working to specified patterns and profiles. Carrying out work to correct line and level. Providing necessary cutouts and framework for lights, fittings, AC grills, trap doors, sprinkler heads, smoke detectors and similar including supports from ceiling where directed for these. No deductions for openings less than 0.1 sqm. in area. Necessary precautions to prevent damage to the flooring and other works. SPECIFICATIONS GENERAL These specifications are for work to be done, items to be supplied and materials to be used in the works as shown and defined on the drawings and described herein all under supervision and to the entire satisfaction of the Architect/Consultant & owner. The workmanship is to be the best available and of a very high standard, use must be made of specialist tradesmen in all types of work and necessary allowance must be made for the same in the rates quoted. The materials and items to be provided by the contractor shall be the best of their respective kinds as specified in the tender and in accordance with the samples approved, where materials or products are specified in these specifications and/or Xxxx of Quantities by the name of the manufacturer of the brand name, trade name or catalogue reference, the contractor will require to obtain prior approval of the Architect/Consultant and owner for using substitute material or product. The contractor shall produce all invoices, vouchers or receipted accounts for any materials if called upon to do so by the Architect/Consultant and owner. Samples of all materials are to be submitted to the Architect/Consultant/owner for his approval before the contractor orders or delivers in bulk in the site. Samples together with their packing are to be provided by the Contractor free of charge and approved samples will be retained by the owner and designer for comparison with the materials which will be delivered to the site. Should any materials be rejected by the Architect/Consultant/owner, they will be removed from the site at the Contractor's expense. Also the contractor will be required to submit specimen finishes of colours, fabrics, etc. for approval of Architect/Consultants/ owner before proceeding with the works. Should it be necessary to prepare shop drawings, and then four copies of ...
AutoNDA by SimpleDocs
FALSE CEILING. The false ceiling will be provided in the PUF shelters (excluding front verandah of all shelters) as per details given below :-
FALSE CEILING. The false ceiling shall be constructed exactly as per the details in the drawings. All faces shall be finished and free from any cracks and undulations. It must be true to line and level and must be completely error to the satisfaction of the Architect. LIST OF APPROVED AND NOMINATED MANUFACTURERS/SUPPLIERS OF MATERIALS AND SUB- CONTRACTORS. Sr. # MATERIAL MANUFACTURE 1 Commercial boards / ply Make – Sun Light, Sontiex, Supplier – Golden Ply Xxxx, Xxxxx Traders 2 Pre Laminated Board (MDF) Make – Al-Noor (Pakistan),Malaysian manufactured Supplier – Naeem Traders, Golden Ply Wood House 3 Laminate Xxxxxx Art / Xxxxxxx / Equivalent 5 Soft Wood Oak/Deodar Wood 6 Adhesive Make – ICI (Scalabond), German (Movelith) Supplier – ICI 7 Hardware Make – GCC 9forpatch fitting and for floor spring / door closer), Doorset (locks, handles) Supplier – Brothers Glass, 3M Make – Italian, Chinese Supplier – SMC Stainless steel handles available, Saleem Hardware 8 Coir Mattress Make – Diamond, Molty Foam Supplier – Diamond, Molty 10 Gypsum board Make – Elephant Supplier – Thermic Engineering Co. 11 Ceramic wall tiles Make – RAK/Niro Supplier – RAK, X. Xxxxxxxx, Crete Sol 12 Vitrified floor tiles Make – Porcelain Xxxxxxxx tiles Supplier - Xxxxxxxx 13 Wall Paint Make – ICI, Jotun, Supplier – ICI, Jotun, 14 Textured Paint Make – ICI Supplier - ICI 15 Grey Cement Make – Maple Leaf 16 White Cement Make – Maple Leaf (White) 17 Blinds Make – Master Covering, vertical blinds, roller blinds Supplier – Master Covering 18 White Board 3M 20 Looking / Mirror Make – Belgium Manufactured Supplier – Brother Glass 21 Masonry Wall Make – Brick 4.5” thick Dry Gypsum wall 3.5” thick 22 Laminated Floor Make – Swedish, Polish, American Supplier – Stile, Inter wood 23 Carpet Tiles Make – Interface Supplier – Pak Carpet 24 Anti Static Vinyl Flooring Make – LG Supplier - Serena ELECTRICAL MAKES Sr. # MATERIAL MANUFACTURE 1 Commercial boards / ply Make – Sun Light, Sontiex, Supplier – Golden Ply Xxxx, Xxxxx Traders 2 Pre Laminated Board (MDF) Make – Al-Noor (Pakistan),Malaysian manufactured Supplier – Naeem Traders, Golden Ply Wood House 3 Laminate Xxxxxx Art / Xxxxxxx / Equivalent 5 Soft Wood Oak/Deodar Wood 6 Adhesive Make – ICI (Scalabond), German (Movelith) Supplier – ICI 7 Hardware Make – GCC 9forpatch fitting and for floor spring / door closer), Doorset (locks, handles) Supplier – Brothers Glass, 3M Make – Italian, Chinese Supplier – SMC Stainless steel handles available, Saleem Hardware 8 Coir Mat...
FALSE CEILING. (a) False Ceiling shall be provided all as shown on drawings of manufacturers and as per details given in drawing. The workmanship and fixing shall be all as specified in clause 12.19, 12.20 and 12.31 of MES Schedule 2009 Part-I (Specifications).

Related to FALSE CEILING

  • TRAFFIC INFRACTIONS The State will not be liable for any expense incurred by the Contractor for any parking fees or as a consequence of any traffic infraction or parking violations attributable to employees of the Contractor.

  • Submitting False Claims; Monetary Penalties Pursuant to San Francisco Administrative Code §21.35, any contractor, subcontractor or consultant who submits a false claim shall be liable to the City for the statutory penalties set forth in that section. A contractor, subcontractor or consultant will be deemed to have submitted a false claim to the City if the contractor, subcontractor or consultant: (a) knowingly presents or causes to be presented to an officer or employee of the City a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by the City; (c) conspires to defraud the City by getting a false claim allowed or paid by the City; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to pay or transmit money or property to the City; or

  • Offense Level Calculations i. The base offense level is 7, pursuant to Guideline § 2B1.1(a)(1).

  • Emergency Call Back Employees who are called back to work after completing their regular shift and who are relieved of duty before commencing their next regular shift shall be paid a minimum of four (4) hours’ straight-time pay for all time worked up to two (2) hours. Any time worked in excess of two (2) hours shall be paid for at double the straight-time rate of pay for actual hours worked. Example: Zero (0) minutes to two (2) hours = 4 hours’ straight-time pay. Two and one-half (2 1/2) hours = 5 hours’ straight-time pay. Four (4) hours = 8 hours’ straight-time pay.

  • Substance Abuse Treatment Information Substance abuse treatment information shall be maintained in compliance with 42 C.F.R. Part 2 if the Party or subcontractor(s) are Part 2 covered programs, or if substance abuse treatment information is received from a Part 2 covered program by the Party or subcontractor(s).

  • Harassment Prevention 38.1 Employees should refer in the first instance to the provisions and procedures specified in the employer’s Harassment Policy. The employee’s attention is also drawn to clause 39 Resolution of Employment Relationship Problems. Harassment can take many forms, including sexual harassment, bullying, racial harassment, violence, and other forms of intimidating behaviour.

Time is Money Join Law Insider Premium to draft better contracts faster.