HARD SURFACE RESTORATION PROCEDURES Sample Clauses

HARD SURFACE RESTORATION PROCEDURES. Hard surface restoration striping must be completed per State and Local Municipality and Company standards and requirements within three (3) months of road cut completion. If additional pavement cutbacks are required by State or Local Municipalities beyond specified permit conditions and/or construction drawings, the Contractor will be compensated upon approval by the Company. Compensation for cut-backs shall be through the increased number of Paving Units based on actual pavement restored with approval by Company representative. Note: All pavement removals require an initial full depth pavement saw-cut prior to start of excavations for gas main and services. Backfill with structural fill in 6" lifts under all sidewalks, roadways, driveways, or any other improvement, and compact to a minimum of 95%. Final full depth saw-cut a straight edge on all existing asphalt, concrete and any other surface where permanent restoration is required following placement and compaction of crusher run subbase. All debris from excavation and backfilling operations (rocks, roots branches, etc.) larger than three (3) inches shall be removed and disposed of by the Contractor at the time of backfilling. Excavations in hard surface areas not receiving permanent restoration within two (2) weeks of finishing, backfilling shall be temporarily restored and maintained to within one half (1/2) inch of finished grade. All finishes not accepted due to settling, finishing of the concrete or asphalt within 24 months from the date of installation shall be replaced by the Contractor at the Contractors’ expense. If disturbed, all survey and property pins shall be replaced by a licensed surveyor at the Contractor expense. Spoils from excavation that will not be used as backfill shall not be stockpiled in the work area. It is the responsibility of the Contractor that all spoils at a job site shall be brought to a facility approved by Avangrid. Curb boxes, other utilities, and pre-existing features damaged during the Contractors’ operations shall be replaced at the Contractors’ expense.
AutoNDA by SimpleDocs

Related to HARD SURFACE RESTORATION PROCEDURES

  • Job Restoration Upon return from FMLA leave, an employee must be restored to his or her original job, or to an "equivalent" job, which means virtually identical to the original job in terms of pay, benefits, and other employment terms and conditions.

  • Outage Restoration If an outage on the Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades of the Connecting Transmission Owner or Developer adversely affects the other Party’s operations or facilities, the Party that owns the facility that is out of service shall use Reasonable Efforts to promptly restore such facility(ies) to a normal operating condition consistent with the nature of the outage. The Party that owns the facility that is out of service shall provide the other Party and NYISO, to the extent such information is known, information on the nature of the Emergency State, an estimated time of restoration, and any corrective actions required. Initial verbal notice shall be followed up as soon as practicable with written notice explaining the nature of the outage.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • School Improvement Plan As permitted under IC § 20-10.2-3-1.5, the Charter shall serve as the Charter School's strategic and continuous school improvement and achievement plan (hereafter, the "School Improvement Plan"). To the extent that IC § 20-10.2 applies to the Charter in its function as the School Improvement Plan, the Organizer shall comply with the requirements under IC § 20-10.2.

  • Restoration The following provisions shall apply in connection with the Restoration of the Property:

  • Improvement Plans a. An improvement plan is a clearly articulated assistance program for a teacher/counselor/SLP whose overall summative rating is ineffective.

  • REPAIRS AND RESTORATION Landlord agrees that in the event of the damage or destruction of the Leased Premises, Landlord forthwith shall proceed to repair, restore, replace or rebuild the Leased Premises (excluding Tenant's leasehold improvements), to substantially the condition in which the same were immediately prior to such damage or destruction. The Landlord thereafter shall diligently prosecute said work to completion without delay or interruption except for events beyond the reasonable control of Landlord . Notwithstanding the foregoing, if Landlord does not either obtain a building permit within ninety (90) days of the date of such damage or destruction, or complete such repairs, rebuilding or restoration and comply with conditions (a), (b) and (c) in Section 1 of Article XIII within nine (9) months of such damage or destruction, then Tenant may at any time thereafter cancel and terminate this Lease by sending ninety (90) days written notice thereof to Landlord , or, in the alternative, Tenant may, during said ninety (90) day period, apply for the same and Landlord shall cooperate with Tenant in Tenant's application. Notwithstanding the foregoing, if such damage or destruction shall occur during the last year of the term of this Lease, or during any renewal term, and shall amount to twenty-five (25%) percent or more of the replacement cost, (exclusive of the land and foundations), this Lease, except as hereinafter provided in Section 3 of Article XV, may be terminated at the election of either Landlord or Tenant, provided that notice of such election shall be sent by the party so electing to the other within thirty (30) days after the occurrence of such damage or destruction. Upon termination, as aforesaid, by either party hereto, this Lease and the term thereof shall cease and come to an end, any unearned rent or other charges paid in advance by Tenant shall be refunded to Tenant, and the parties shall be released hereunder, each to the other, from all liability and obligations hereunder thereafter arising.

  • Improvement Plan A written plan developed by the evaluator, utilized when a teacher received a Rating of Ineffective on his/her Evaluation or on any individual deficiency in the evaluation system.

  • Alterations, Additions and Improvements Subject to the provisions of this Article IV, Lessee may make any alterations, additions, improvements or other changes to the Premises and the Relevant Assets as may be necessary or useful in connection with the operation of the Relevant Assets (collectively, the “Additional Improvements”). If such Additional Improvements require alterations, additions or improvements to the Premises or any of the Shared Access Facilities, Lessee shall notify Lessor in writing in advance and the parties shall negotiate in good faith any increase to the fees paid by Lessee under the Site Services Agreement by Lessee or otherwise provide for reimbursement of any material increase in cost (if any) to Lessor under the Site Services Agreement that results from any modifications to the Premises or the Shared Access Facilities necessary to accommodate the Additional Improvements, or as otherwise mutually agreed by the parties. Any alteration, addition, improvement or other change to the Premises, Relevant Assets or Additional Improvements (and, if agreed by Lessee and Lessor, to the Shared Access Facilities) by Lessee shall be made in a good and workmanlike manner and in accordance with all applicable Laws. The Relevant Assets and all Additional Improvements shall remain the property of Lessee and shall be removed by Lessee within one (1) year after termination of this Lease (provided that such can be removed by Lessee without unreasonable damage or harm to the Premises) or, at Lessee’s option exercisable by notice to Lessor, surrendered to Lessor upon the termination of this Lease. Lessee shall not have the right or power to create or permit any lien of any kind or character on the Premises by reason of repair or construction or other work. In the event any such lien is filed against the Premises, Lessee shall cause such lien to be discharged or bonded within thirty (30) days of the date of filing thereof.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!