OWNER FURNISHED EQUIPMENT. (a) Within forty-five (45) days of the Effective Date of this Agreement, Builder and Owner shall agree upon a schedule of in-yard delivery dates of those items of material, equipment, engineering data and information ("Owner Furnished Equipment"), as are set forth in the Specifications to be provided by Owner. The time for delivery of the Owner Furnished Equipment as detailed on such delivery schedule shall be such so as to not cause Builder to be delayed in the timely prosecution of the work in accordance with the Production Schedule.
(b) Builder shall at its own cost install the Owner Furnished Equipment and obtain ABS approval of such installation. Builder's scope of work includes all necessary foundations and supplies, such as, but not limited to, electric, instrumentation, controls and hydraulic power, air, fuel, steam, etc., in each case including all necessary connections such as electric wiring and piping. All Owner Furnished Equipment shall be delivered by Owner to Builder at Builder's Yard in their assembled form to the extent reasonably feasible, tested and in proper condition, ready for installation in or on the Platform, in accordance with the Production Schedule. Builder will unload all Owner Furnished Equipment. Suitable storage will be provided by Builder for all Owner Furnished Equipment. The cost of such storage is included in the Contract Price. The Owner Furnished Equipment shall be at Builder's risk from the time of their delivery to the shipyard until the time of their redelivery to Owner either as part of the Platform or otherwise. Upon delivery of each item of Owner Furnished Equipment, unless such item is accompanied by a weight certificate issued by a reputable body, Builder shall weigh at Owner's expense such item in order to incorporate the actual weight in the Lightship Weight calculations.
(c) In order to facilitate installation by Builder of the Owner Furnished Equipment on the Platform, Owner shall furnish the Builder with all reasonably necessary information including specifications, plans, drawings, instruction books, manuals, test reports and certificates. Owner, if so requested by Builder, shall without any charge to Builder cause specialist engineers and representatives of the manufacturers of the Owner Furnished Equipment to provide technical assistance to Builder in installation thereof in or on the Platform or to make necessary adjustments thereof at the Yard. Builder's scope of work under this Agreement excludes any...
OWNER FURNISHED EQUIPMENT. The Owner shall at its own risk, cost and expense, supply and deliver to the Contractor all OFE at the warehouse or other storage of the Yard in proper condition ready for installation in or on the Vessel, in accordance with the time schedule stated in Appendix 4 hereto or such other time schedule as may be mutually agreed between the Parties.
OWNER FURNISHED EQUIPMENT. The Contractor shall perform all work required to subcontract the installation of Owner Furnished Contractor Installed (OFCI) and Owner Existing Contractor Installed (OECI) equipment.
OWNER FURNISHED EQUIPMENT. Owner shall, at its sole cost and expense, deliver the Owner-Furnished Equipment to the Site in accordance with the critical path dates identified in the Project Schedule.
OWNER FURNISHED EQUIPMENT. All Owner-furnished equipment and information, if any, must be delivered F.O.B. Builder's yard(s) at Mobile, Alabama, in accordance with Section 1 of the Specifications. All Owner Supplied Equipment shall be stored at no cost to Owner (estimated space: 10,000 sqft). Some equipment may require climate controlled storage or covered space (estimated: 2,000 sqft).
OWNER FURNISHED EQUIPMENT. 40.1 The Owner shall at its own risk, cost and expense, supply and deliver to the Contractor all OFE at the warehouse or other storage of the Yard in proper condition ready for installation in or on the Vessel, in accordance with the time schedule stated in Appendix 4 (OFE And Owner Engineering Deliverables Ros Dates) hereto or such other time schedule as may be mutually agreed between the Parties.
40.2 In order to facilitate installation by the Contractor of the OFE in or on the Vessel, the Owner shall furnish the Contractor with necessary specifications, plans, drawings, instruction books, manuals, test reports and certificates required by the rules and regulations within the time schedule stated in Appendix 4 (OFE And Owner Engineering Deliverables Ros Dates) hereto. The Owner, if so requested by the Contractor, shall without any charge to the Contractor, cause the representatives of the manufacturers of the OFE to assist the Contractor in installation thereof in or on the Vessel and/or to carry out installation thereof by themselves or to make necessary adjustment thereof at the Yard.
40.3 The delivery dates mentioned in Appendix 4 (OFE And Owner Engineering Deliverables Ros Dates) are based on the Delivery of the Vessel to the Contractor by the Delivery Date. In the event of any delay in the Delivery of the Vessel to the Contractor, the delivery dates or delivery periods mentioned in Appendix 4 (OFE And Owner Engineering Deliverables Ros Dates) shall be extended by the period of delay in the Delivery of the Vessel to the Contractor or such dates or periods as the Parties may otherwise mutually agree in writing.
40.4 Any and all of the OFE shall be subject to the Contractor's reasonable right of rejection, as and if they are found to be unsuitable or in improper condition for installation.
40.5 Should the Owner fail to deliver any of the OFE within the prescribed time, the Redelivery Date shall be extended for a period of such delay in delivery or such longer period caused to the performance of the Works if the Contractor is able to demonstrate the same. In such event, the Owner shall be responsible and pay to the Contractor for all losses and damages incurred by the Contractor by reason of such delay in delivery of the OFE and such payment shall be made upon Redelivery of the Vessel. If delay in delivery of any of the Owner's OFE exceeds thirty (30) Days, then, the Contractor shall be entitled to proceed with the Works without installation thereof in ...
OWNER FURNISHED EQUIPMENT. Within ten (10) business days from the execution of this Contract, Builder shall deliver to Owner a schedule of dates for the delivery to Builder by Owner of Owner Furnished equipment and information (the “Schedule of Delivery of Owner Furnished Equipment”). If delivery by Owner to the designated shipyard of any of the components of Owner Furnished Equipment is delayed beyond the respective scheduled dates of delivery shown on the Schedule of Delivery of Owner Furnished Equipment, it is agreed that the Stipulated Delivery Date of the affected Unit(s) shall be extended on a day for day basis for each day of delay of such Owner Furnished Equipment or such other period, whether longer or shorter, as the parties may mutually agree in writing taking into consideration the degree the Work is actually delayed by the delay of such Owner Furnished Equipment. Owner shall be responsible for all costs of transportation of Owner Furnished Equipment to the designated shipyard as well as all classification and regulatory certificates. All Owner furnished equipment arriving at Builder’s yard shall be stored in a secure area allocated to Owner for storage of equipment and supplies until required by Builder for installation into the Vessels. Such securing area shall be plainly marked to indicate Owner’s possession and ownership of such equipment and supplies.
OWNER FURNISHED EQUIPMENT. A. The networking electronic hub equipment and wireless access points shall be furnished and installed by the Owner.
OWNER FURNISHED EQUIPMENT. Services related to Owner-furnished equipment, furniture, and furnishings that are not a part of the Work.
OWNER FURNISHED EQUIPMENT. DELIVERY OF THE OWNER FURNISHED EQUIPMENT: RESPONSIBILITY OF THE BUILDER........................................39