Engineering Deliverables Sample Clauses

Engineering Deliverables. Supplier will provide Buyer, upon Buyer’s request, all the information (in the English language) required to enable Buyer to procure alternate Repair source(s), including but not limited to the following: • Product drawings • Schematics / diagrams • Engineering specificationsPerformance specifications • Component placement listings • Certified component source listings (IEC / UC / CSA 950) • Debug / fault isolation test proceduresSpecial tooling drawings / specifications if applicable • Rework / upgrade instructions • Test procedures / software / equipment • Repair verification procedures / test software / equipment • Hazardous materials listings
AutoNDA by SimpleDocs
Engineering Deliverables. 1. Engineering design for replacement of One (1) 34.5kV circuit breaker
Engineering Deliverables. In the event Supplier is unable to fulfill repair responsibilities, Supplier will provide Buyer, upon Buyer’s request, all the information (in the English language) required to enable Buyer to procure alternate Repair source(s), including but not limited to the following: Product drawings Schematics / diagrams Engineering specifications Performance specifications Component placement listings Certified component source listings (IEC / UC / CSA 950) Debug / fault isolation test procedures Special tooling drawings / specifications if applicable Rework / upgrade instructions Test procedures / software / equipment Repair verification procedures / test software / equipment Hazardous materials listings
Engineering Deliverables. The primary deliverables for this Project are a basic preliminary design package for each production facility consisting of the preliminary engineering documents, which may include: o Develop scope and rough cost estimate for modifications to Long Beach existing process equipment to begin production of biodiesel as soon as possible. EXHIBIT A-2 o Translation of process flow diagrams and material balances from metric to U.S. units. o Development preliminary P&ID's for the process sections and systems. o Develop an equipment list. o Develop an instrument list. o Develop a motor and electrical users list. o Develop a piping line list. o Develop preliminary equipment data sheets. o Resize equipment as necessary. o Develop preliminary piping specifications. o Identify equipment and piping that require insulation. o Develop civil foundation and structural design criteria for the specific locations. o Develop preliminary equipment layout arrangement for each site or process section. o Mark up the equipment guide drawixxx to meet design requirements for domestic manufacture. o Identify the electrical hardware and motor control requirements for each site or facility. o Specify the control system hardware, software, and programming requirements to control the process.
Engineering Deliverables. The following documents and or engineering deliveries constitute part of the Results and define the general technical requirements for the affected commodities which will be delivered to the Purchaser in accordance with the NPDS. Program Management content according to NPDS: Establish Engineering Program team and contacts Secure systems in place to allow the generation of the necessary data to support release in Geely systems and transfer to Polestar systems Data format provided for release in Polestar systems same as Geely used format. Formally communicate all changes proposed to requirements or design to Polestar for review and identification of impact. Identify and facilitate resolution of system, subsystem, assembly and component interfaces issues including removal & repair. Geely to lead program engineering and launch process meetings including change management and/or open issues lists Coordinate needed decision- and review meetings ◾ Communicate program assessment status, including the sign–off and approval of progress throughout the product development process Review and approve all deliverables (e g attributes and functionality) Inform and obtain Polestar approval and decision for all changes and implement the approved changes using a robust ‘manage the change’ process – according to RASIC defined in Appendix 1.15. Provide list of team members with UPL level roles & responsibilities and ensure staffing requirements are met to support engineering program deliverables. This includes support for team meetings as deemed necessary by Polestar. Provide / Co-ordinate price and investment quotations including cost split ups for all module and engineering changes Manage the overall program timing by creating a delivery work plan to ensure that all key milestones are met. Deliver necessary information (tool plans, verification plans etc) Support all Polestar documentation including change management release processes Communicate all risks to Polestar when discovered, including mitigating actions Product / program status reviews All work products delivered to the Purchaser shall be written in English language. A second language may be added but shall not contain any other information than what is provided in the English version. In the event of inconsistency or contradictions between the English and other language text the English tax should prevail. Submit and store all work products in an agreed electronic format. Secure that deliveries are in accordance t...

Related to Engineering Deliverables

  • Closing Deliverables (a) At the Closing, Seller shall deliver to Buyer the following:

  • Other Deliverables For any Deliverable that is not a System Deliverable, the applicable Work Order will set forth the acceptance criteria and other testing required for District to evaluate and accept (or, where necessary, reject) such Deliverable; provided, however, that in no case will a Deliverable be accepted by District until District has provided Contractor with District’s written acceptance thereof.

  • Deliverables Upon satisfactory completion of the work authorization, the Engineer shall submit the deliverables as specified in the executed work authorization to the State for review and acceptance.

  • Post-Closing Deliverables On or before the Closing Date, the applicable Seller shall deliver to Buyer the following:

  • Seller Deliverables At the Closing, the Seller shall deliver to the Purchaser:

  • Closing Date Deliverables On the Closing Date, the Sponsor Holdco shall deliver to Acquiror and the Company a duly executed copy of that certain Amended and Restated Registration Rights Agreement, by and among Acquiror, the Company, the Sponsor Holdco and certain of the Company’s stockholders or their respective affiliates, as applicable, in substantially the form attached as Exhibit C to the Merger Agreement.

  • Purchaser Deliverables The Purchaser shall have delivered its Purchaser Deliverables in accordance with Section 2.2(b).

  • Seller’s Deliverables At the Closing, Seller shall deliver to Buyer:

  • Seller’s Closing Deliverables At the Closing, Seller shall deliver or cause to be delivered to Purchaser, at Seller's expense, each of the following items:

  • Seller Closing Deliverables At the Closing, Seller shall deliver to Buyer the following:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!