PRELIMINARY DESIGN DRAWINGS Sample Clauses

PRELIMINARY DESIGN DRAWINGS. The service provider should prepare and submit preliminary design drawings for the entire scope of works with sufficient details to enable evaluation. This information is critical in the award of the contract as this will be the basis for the design development should the offer be acceptable. All design assumptions and calculations should be included herein. Tenderer is to submit preliminary design, layout plans, Erf connections details, over head line (MV and LV), meter and etc. with detail materials specifications along with TENDER justifying each parameters. PRELIMINARY DESIGN DRAWINGS Should there be no preliminary design drawings, mark the above “NIL”.
AutoNDA by SimpleDocs
PRELIMINARY DESIGN DRAWINGS. HDR will develop 30% level preliminary design drawings to document proposed project design and layout. Technical specifications and OPCCs are not included in this subtask. Review comments from this package will serve as the basis for further developing the project design and preliminary proposal packages described below.
PRELIMINARY DESIGN DRAWINGS. Sheet List for Preliminary Drawings to include the following: o Cover o Sheet Index, Legend, and General Notes o Horizontal Control and Project Layout o Drainage Area Map and Drainage Calculations o Channel Improvements Typical Sections o Channel Improvements Plan and Profile o Grading Plan o Demolition Plan o Erosion Control Plan o Gabion Transition Structure Plan o Gabion Details o TRM Details o Modular Block Wall Details o Standard Details
PRELIMINARY DESIGN DRAWINGS. Milestone 1 Deadline
PRELIMINARY DESIGN DRAWINGS. Subcontractor shall use the Pipeline List provided by the DCSEU to develop design drawings for a Project, and submit preliminary design drawings to the DCSEU to demonstrate project feasibility. The DCSEU will review the preliminary design drawings to verify the Project design meets the following requirements:
PRELIMINARY DESIGN DRAWINGS. Upon execution of the Lease, Tenant shall submit to Landlord one (1) reproducible and three (3) prints of preliminary drawings showing the intended design character and finishing of the Premises (the "Preliminary Design Drawings").
PRELIMINARY DESIGN DRAWINGS. Preliminary design drawing(s) shall be of high quality and complete to permit the ACP a through test of the technical solution provided for the proposed retrofit kits. The preliminary drawing(s) shall include but not limited to: General Arrangement of the proposed hydraulic cylinder assembly, including principal dimensions and clearances.
AutoNDA by SimpleDocs
PRELIMINARY DESIGN DRAWINGS. The service provider should prepare and submit preliminary design drawings for the entire scope of works with sufficient details to enable evaluation. This information is critical in the award of the contract as this will be the basis for the design development should the offer be acceptable. All design assumptions and calculations should be included herein. Tenderer is to submit preliminary design, layout plans, centipede connection 88kv, new NECR 88KV, new 88KV centre rotate ISOL, new set of 3xcts 88KV, new GIS CB 88KV, surge arrestors and etc. with detail materials specifications along with TENDER justifying each parameters. PRELIMINARY DESIGN DRAWINGS Should there be no preliminary design drawings, mark the above “NIL”.

Related to PRELIMINARY DESIGN DRAWINGS

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!