Preliminary Field Check Sample Clauses

Preliminary Field Check. The CONSULTANT will schedule a Preliminary Field Check with the CLIENT’s Project Manager following the review and acceptance of the Stage 1 Plan submission. Preliminary field check plans will be developed in accordance with IDM Chapter 14-2.01(05) and will be distributed to the preliminary field check invitees prior to the meeting. The CONSULTANT will lead and attend the PFC meeting. The CONSULTANT will record meeting minutes and distribute them to all attendees.
AutoNDA by SimpleDocs
Preliminary Field Check. The CONSULTANT shall revise plans based on preliminary review comments provided by the LOCAL PUBLIC AGENCY during the over-the-shoulder review. The CONSULTANT shall schedule and hold a Preliminary Field Check (PFC) with the LOCAL PUBLIC AGENCY’s Project Manager following the review and acceptance of the Preliminary Plan submission. The PFC plans shall include: • Preliminary Drainage Design or Connection to Existing System. • Preliminary Layout of Existing Utilities. • Updates to Plan and Profile Sheets based on Preliminary Drainage and Utility Updates. • Updates to Construction Details Sheets based on Preliminary Drainage and Utility Updates. • Updates to Intersection Detail Sheets based on Preliminary Drainage and Utility Updates. • Updates to Curb Ramp Detail Sheets based on Preliminary Drainage and Utility Updates. The plans developed will be distributed to the Preliminary Field Check invitees prior to the meeting. The CONSULTANT will provide up to two (2) attendees at the PFC meeting and will record meeting minutes and distribute them to attendees.
Preliminary Field Check. The CONSULTANT shall prepare preliminary field check plans, in accordance with IDM 14- 2.01(05). The CONSULTANT will schedule a Preliminary Field Check (PFC) meeting with the INDOT Project Manager, utilities, and City of West Lafayette. PFC plans will be provided to the preliminary field check attendees. The CONSULTANT will record meeting minutes and distribute them to all attendees. Plan sheets will be in 24” x 36” format, and will be distributed electronically. The submission will include:
Preliminary Field Check. The CONSULTANT will attend a Preliminary Field Check with the CLIENT’s Project Manager following the review and acceptance of the Stage 1 Plan submission. One traffic representative will attend the PFC meeting.

Related to Preliminary Field Check

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Background Screening VENDOR shall comply with all requirements of Sections 1012.32 and 1012.465, Florida Statutes, and all of its personnel who (1) are to be permitted access to school grounds when students are present, (2) will have direct contact with students, or (3) have access or control of school funds, will successfully complete the background screening required by the referenced statutes and meet the standards established by the statutes. This background screening will be conducted by SBBC in advance of VENDOR or its personnel providing any services under the conditions described in the previous sentence. VENDOR shall bear the cost of acquiring the background screening required by Section 1012.32, Florida Statutes, and any fee imposed by the Florida Department of Law Enforcement to maintain the fingerprints provided with respect to VENDOR and its personnel. The parties agree that the failure of VENDOR to perform any of the duties described in this section shall constitute a material breach of this Agreement entitling SBBC to terminate immediately with no further responsibilities or duties to perform under this Agreement. VENDOR agrees to indemnify and hold harmless SBBC, its officers and employees from any liability in the form of physical or mental injury, death or property damage resulting from VENDOR’s failure to comply with the requirements of this section or with Sections 1012.32 and 1012.465, Florida Statutes.

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • APPLICATION/SCOPE 1.1 This collective agreement shall be applicable to every person who requires a teacher certificate as a condition of employment with the School Division excepting those positions agreed to be excluded in local bargaining between the School Division and the Association. Effective March 4, 2020, clause 1.1 above is repealed and replaced by the following clause:

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.