Preliminary Field Check Sample Clauses

Preliminary Field Check. The CONSULTANT will schedule a Preliminary Field Check with the CLIENT’s Project Manager following the review and acceptance of the Stage 1 Plan submission. Preliminary field check plans will be developed in accordance with IDM Chapter 14-2.01(05) and will be distributed to the preliminary field check invitees prior to the meeting. The CONSULTANT will lead and attend the PFC meeting. The CONSULTANT will record meeting minutes and distribute them to all attendees.
AutoNDA by SimpleDocs
Preliminary Field Check. The CONSULTANT shall revise plans based on preliminary review comments provided by the LOCAL PUBLIC AGENCY during the over-the-shoulder review. The CONSULTANT shall schedule and hold a Preliminary Field Check (PFC) with the LOCAL PUBLIC AGENCY’s Project Manager following the review and acceptance of the Preliminary Plan submission. The PFC plans shall include: • Preliminary Drainage Design or Connection to Existing System. • Preliminary Layout of Existing Utilities. • Updates to Plan and Profile Sheets based on Preliminary Drainage and Utility Updates. • Updates to Construction Details Sheets based on Preliminary Drainage and Utility Updates. • Updates to Intersection Detail Sheets based on Preliminary Drainage and Utility Updates. • Updates to Curb Ramp Detail Sheets based on Preliminary Drainage and Utility Updates. The plans developed will be distributed to the Preliminary Field Check invitees prior to the meeting. The CONSULTANT will provide up to two (2) attendees at the PFC meeting and will record meeting minutes and distribute them to attendees.
Preliminary Field Check. The CONSULTANT will attend a Preliminary Field Check with the CLIENT’s Project Manager following the review and acceptance of the Stage 1 Plan submission. One traffic representative will attend the PFC meeting. Task 7.3: Stage 3 Plans Submission
Preliminary Field Check. The CONSULTANT shall prepare preliminary field check plans, in accordance with IDM 14- 2.01(05). The CONSULTANT will schedule a Preliminary Field Check (PFC) meeting with the INDOT Project Manager, utilities, and City of West Lafayette. PFC plans will be provided to the preliminary field check attendees. The CONSULTANT will record meeting minutes and distribute them to all attendees. Plan sheets will be in 24” x 36” format, and will be distributed electronically. The submission will include: 1. Field Visit to verify the scope of work 2. Abbreviated Engineer’s Assessment in accordance with IDM 14-2.01(03) item 2. 3. Level One Checklist and design calculations for final conditions to meet 3R (Non- Freeway) criteria. Design Exceptions will be prepared as necessary. 4. Plan sheets developed in accordance with IDM 14-2.03 5. Quality assurance and quality control on all deliverable documents developed by the CONSULTANT.

Related to Preliminary Field Check

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Preliminary Design Phase 30 percent plans) A. Proceed with Preliminary Design Phase after the completion of the Conceptual phase which includes: Acceptance by Owner of the Conceptual Report and any other Study and Report Phase deliverables; selection by Owner of a recommended solution; issuance by Owner of any instructions for use of Project Strategies, Technologies, and Techniques, or for inclusion of sustainable features in the design, and Indication by Owner of any specific modifications or changes in the scope, extent, character, or design requirements of the Project desired by Owner. 1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary drawings, outline specifications, and written descriptions of the Project. 2. Include on plans, property lines, structure locations, ownership names and contact information. 3. In preparing the Preliminary Design Phase documents, use any specific applicable Project Strategies, Technologies, and Techniques authorized by Owner during or following the Study and Conceptual Phase, and include sustainable features, as appropriate, pursuant to Owner’s instructions. 4. Provide necessary field surveys, topographic and utility mapping for Engineer’s design purposes. Comply with the scope of work and procedure for the identification and mapping of existing utilities as defined by Section A1.03 “Utility Requirements” and Section A1.04 “Survey Services” 5. Visit the Site as needed to prepare the Preliminary Design Phase documents. 6. Advise Owner if additional reports, data, information, or services of the types described are necessary and assist Owner in obtaining such reports, data, information, or services. 7. Continue to assist Owner with Project Strategies, Technologies, and Techniques that Owner has chosen to implement. 8. Based on the information contained in the Preliminary Design Phase documents, prepare a revised opinion of probable Construction Cost, and assist Owner in tabulating the various cost categories which comprise Total Project Costs. 9. Obtain and review Owner’s instructions regarding Owner’s procurement of construction services (including instructions regarding advertisements for bids, instructions to bidders, and requests for proposals, as applicable), Owner’s construction contract practices and requirements, insurance and bonding requirements, electronic transmittals during construction, and other information necessary for the finalization of Owner’s bidding-related documents (or requests for proposals or other construction procurement documents), and Construction Contract Documents. Also obtain and review copies of Owner’s design and construction standards, Owner’s standard forms, general conditions, supplementary conditions, text, and related documents or content for Engineer to include in the draft bidding-related documents (or requests for proposals or other construction procurement documents), and in the draft Construction Contract Documents, when applicable. 10. Development communication plan for project: considering the use of door hangers, letters, public meetings, changeable message boards. 11. Furnish 6 review copies of the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables to Owner by established due date, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items. 12. Revise the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables in response to Owner’s comments, as appropriate, and furnish to Owner 6 copies of the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other deliverables by the specified due date. 13. Engineer’s services under the Preliminary Design Phase will be considered complete on the date when Engineer has delivered to Owner the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables.

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following: .1 Confirmation of the allocations of program functions; .2 Site plan; .3 Building plans, sections and elevations;

  • SINGLE-USE PRODUCTS The Board of County Commissioners has established a single-use products and plastic bags policy intended to reduce the use of products which have become globally recognized as having lasting negative impacts on the environment. Neither single-use products nor plastic bags may be sold or disbursed on County property by staff or contracted vendors, except as set forth in Orange County Administrative Regulation 9.01.03. Failure to comply with the Regulation may result in termination of the contract or other contractual remedies, and may affect future contracting with the County. The use of reusable, recyclable, biodegradable, or compostable materials is encouraged.

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner and any other information that is obtained by the Design Professional. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Title Report (a) Not later than four (4) business days after the date of this Agreement, Seller, with Buyer's assistance and cooperation as necessary, shall arrange for the Title Company to prepare and deliver to Buyer a preliminary title report (the "Title Report") covering the Real Property dated not earlier than the date of this Agreement, such report showing all matters of record and all items which would be shown as exceptions on a ALTA owner's policy of title insurance, together with a recent ALTA survey of the Real Property certified by a licensed land surveyor and a legible copy of each recorded document underlying any exceptions shown in the Title Report. Subject only to the following permitted exceptions (the "Permitted Exceptions"), Seller shall cause all exceptions to title to the Real Property set forth in such Title Report to be removed prior to the Closing: (1) the standard printed exceptions contained in the Title Company's form of Owner's Policy; (2) building restrictions and zoning regulations heretofore or hereafter adopted by any municipal or other public authority relating to the Property; (3) current property taxes not yet delinquent; (4) the exceptions approved by Buyer in accordance with Section 5.13(b); and (5) any exception to which Buyer, in Buyer's sole discretion, specifically and expressly consents in writing prior to the Closing. Buyer shall pay all fees and costs associated with obtaining the Title Report. (b) Buyer shall have until 5:00 p.m. (Los Angeles time) on the fifth (5th) calendar day following Buyer's receipt of the Title Report to disapprove, in Buyer's sole discretion, any matters set forth in the Title Report; provided, however, that Buyer may not disapprove of the exceptions described in items (1), (2) and (3) of Section 5.13(a). If Buyer timely disapproves of any matters set forth in the Title Report, other than with respect to the exceptions described in items (1), (2) and (3) of Section 5.13(a), Seller shall have three (3) business days to indicate in writing whether Seller will cause such disapproved matters to be removed as exceptions to title prior to or concurrently with the Closing. Seller's failure to timely respond shall be deemed to constitute Seller's irrevocable agreement to remove all such disapproved matters as exceptions to title. If Seller timely indicates that it is unwilling to remove any such disapproved matters as exceptions to title, Buyer may elect to (i) proceed with the transaction contemplated hereby and take title subject to such disapproved matters, or (ii) terminate this Agreement. Buyer's failure to make such election within three (3) business days after being informed of Seller's decision shall be deemed an election of option (i). If Buyer terminates this Agreement pursuant to this Section 5.13(b), the Deposit (and all interest accrued thereon) shall be returned to Buyer, and the parties shall have no further obligations to one another except for any obligations that, by their terms, survive the termination of this Agreement.

  • Preliminary Settlement Statement Seller and Buyer shall execute and deliver the Preliminary Settlement Statement.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Preliminary Approval 50. Upon execution of this Agreement by all signatories, Class Counsel shall promptly move the Court for an order granting preliminary approval of this Settlement (“Preliminary Approval Order”). The proposed Preliminary Approval Order that will be filed with the motion shall be in a form agreed upon by Class Counsel and SPE, and substantially in the form as that attached as Exhibit 1 to this Agreement. The motion for preliminary approval shall request that the Court: (1) preliminarily approve the terms of the Settlement as within the range of fair, adequate, and reasonable; (2) provisionally certify the Settlement Class pursuant to Federal Rule of Civil Procedure 23(b)(3) and (e) for settlement purposes only; (3) approve the Notice Program set forth herein and approve the form and content of the Notice; (4) approve the procedures set forth in Section VII for Settlement Class Members to exclude themselves from the Settlement Class or to object to the Settlement; (5) stay the Action pending Final Approval of the Settlement; (6) stay and/or enjoin, pending Final Approval of the Settlement, any actions brought by Settlement Class Members concerning a Released Claim; and (7) schedule a Final Approval hearing for a time and date mutually convenient for the Court, Class Counsel, and counsel for SPE, at which the Court will conduct an inquiry into the fairness of the Settlement, determine whether it was made in good faith and should be finally approved, and determine whether to approve Class Counsel’s application for attorneys’ fees, costs, and expenses, and for Service Awards (“Final Approval Hearing”). 51. Within 10 days of the filing of the motion for preliminary approval, SPE, at its own expense, shall serve or cause to be served a notice of the proposed Settlement, in conformance with the requirements under the Class Action Xxxxxxxx Xxx, 00 X.X.X. § 0000(x) (“CAFA”).