Plans Submission Sample Clauses

Plans Submission. Two (2) blackline drawings and one (1) CAD disk showing all architectural, mechanical and electrical systems, including cutsheets, specifications and the following: CONSTRUCTION PLANS:
AutoNDA by SimpleDocs
Plans Submission. Two (2) blackline drawings and one (1) CAD disk (subject to Xxxxxx’s architect’s and its consultants’ and subconsultants’ reasonable conditions for re-use) showing all architectural, mechanical and electrical systems, including cutsheets (where reasonably requested by Landlord), specifications and the following: CONSTRUCTION PLANS: (1) All partitions shall be shown; indicate ratings of all partitions; indicate all non-standard construction and details referenced; (2) Dimensions for partition shall be shown to face of dry wall; critical tolerances and ± dimensions shall be clearly noted; (3) All plumbing fixtures or other equipment requirements and any equipment requiring connection to Building plumbing systems shall be noted. REFLECTED CEILING PLAN: (1) Layout suspended ceiling grid pattern in each room, describing the intent of the ceiling working point, origin and/or centering; and (2) Locate all ceiling-mounted lighting fixtures and air handling devices including air dampers, fan boxes, etc., lighting fixtures, supply air diffusers, wall switches, down lights, special lighting fixtures, special return air registers, special supply air diffusers, and special wall switches. TELECOMMUNICATIONS AND ELECTRICAL EQUIPMENT PLAN: (1) All telephone outlets required; (2) All electrical outlets required;, note non-standard power devices and/or related equipment; (3) All electrical requirements associated with plumbing fixtures or equipment; append product data for all equipment requiring special power, temperature control or plumbing considerations; (4) Location of telecommunications equipment and general layout of conduits; and (5) Components and design of antennas, if any, (including associated equipment) as installed, in sufficient detail to evaluate weight, bearing requirements, wind-load characteristics, power requirements and the effects on Building structure, moisture resistance of the roof membrane and operations of pre-existing telecommunications equipment, to the extent known or based on information provided by Landlord. DOOR SCHEDULE: (1) Provide a schedule of doors, sizes, finishes, hardware sets and ratings; and (2) Non-standard materials and/or installation shall be explicitly noted. HVAC: (1) Areas requiring special temperature and/or humidity control requirements; (2) Heat emission of equipment (including catalogue cuts where reasonably required by Landlord or, where unavailable, based on engineer’s assumptions therefor), such as CRTs, copy machines...
Plans Submission. The Division of State Fire Marshal will require the submitter to furnish two sets of plans and one set of specifications for review to the Plans Review Section. The submitter may, however, submit plans at an earlier stage, i.e., design review, in which case only one unsigned set needs to be submitted. Only one design review will be allowed per project. When the documents are approved for construction, the plans and specs will be stamped "APPROVED" and returned to the submitter. The stamped set of plans must be kept on the job site for the fire safety inspector's use at the time of inspection. It shall be the responsibility of the submitter to see that the "approved" set of plans is on the construction site before work begins and remains there until final inspection and approval has been issued. Plan approval is good for one year from the date of issue. The construction contract must be let within this period or the approval will expire and the plans must be re‐ submitted with another review fee. The editions of the pertinent codes that will apply to your project will be those that are adopted at the date of your first submittal, regardless of phase, i.e. 50% or final, and will not change even if a newer edition is adopted during the review process. Any change orders or redesign during construction that affect life safety shall be submitted for review with the State Fire Marshal’s file number indicated. There is no additional fee required for changes. If there are any special circumstances or hazards that require further clarification, the reviewer will attempt to contact you; therefore, please include the name and telephone number of a contact person with your plan submission. Please remember that if you are called and asked for additional information or clarification, the reviewer needs this information in writing before he can approve the project. If the statutory time (10 working days on a lease or 30 calendar days on state owned) expires he must disapprove the project and a re‐submittal process may add further delay to the project.
Plans Submission. Two (2) blackline drawings and one (1) CAD disk (subject to Tenant’s architect’s and its consultants’ and subconsultants’ reasonable conditions for re-use) showing all architectural, mechanical and electrical systems, including cutsheets (where reasonably requested by Landlord), specifications and the following:
Plans Submission. Following approval of the Scope-of-Work the CONSULTANT shall prepare the Stage 1 Plans Submission. Plan sheets will be in 24” x 36” format. The submission will include: • Field Visit to verify the scope of work. • Attend preliminary scoping meeting with CLIENT. • Traffic Data for the Title Sheet and Pavement Design. • Plan sheets developed in accordance with IDM 14-2.01(03). The plan sheets are anticipated to be developed at a scale of 1” = 20’. • Quality assurance and quality control on all deliverable documents developed by the CONSULTANT.
Plans Submission. Following the approval of the Final Right-of-Way plans the CONSULTANT shall prepare the Stage 3 Plans Submission. The Stage 3 Plan Submission will be 24” x 36” format and shall include applicable items from IDM 14-2.01(12).
Plans Submission. Two (2) blackline drawings and one (1) CAD disk showing all architectural, mechanical and electrical systems, including cutsheets, specifications and the following: CONSTRUCTION PLANS: (i) All partitions shall be shown; indicate ratings of all partitions; indicate all non-standard construction and details referenced; (ii) Dimensions for partition shall be shown to face of stud; critical tolerances and ± dimensions shall be clearly noted; (iii) All doors shall be shown on and shall be numbered and scheduled on door schedule; indicate ratings of all doors; (iv) All non-standard construction, non-standard materials and/or installation shall be explicitly noted; equipment and finishes shall be shown and details referenced; and (v) All plumbing fixtures or other equipment requirements and any equipment requiring connection to Building plumbing systems shall be noted. REFLECTED CEILING PLAN:
AutoNDA by SimpleDocs
Plans Submission. Two (2) blackline drawings and one (1) CAD disk showing all architectural, mechanical and electrical systems, including cutsheets, specifications and the following: CONSTRUCTION PLANS: (1) All partitions shall be shown; indicate ratings of all partitions; indicate all non-standard construction and details referenced; (2) Dimensions for partition shall be shown to face of stud; critical tolerances and ± dimensions shall be clearly noted; (3) All doors shall be shown on and shall be numbered and scheduled on door schedule; indicate ratings of all doors;
Plans Submission. Following approval of the Scope-of-Work the CONSULTANT shall prepare the Stage 1 Plans Submission. The submission will include:  Plan sheets and deliverables developed in accordance with IDM 14-2.01(03).  Quality assurance and quality control on deliverable documents developed by the CONSULTANT.
Plans Submission. Following approval of the Scope-of-Work the CONSULTANT shall prepare the traffic components of the Stage 1 Plans Submission. The submission will include:  Traffic Data for the Title Sheet and Pavement Design.  Plan sheets developed in accordance with IDM 14-2.01(03).  Pavement Marking Layout  Photometric Analysis and Preliminary Lighting Layout  Voltage Drop Calculations.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!