Road Paving Sample Clauses

Road PavingAsphalt paving of the roads described in paragraphs 2 (E)(1), (2), (3) and (4) shall be required on the earlier of: (i) the issuance of 30 residential building permits; or (ii) December 31, 2026. A letter of credit shall remain in place until the asphalt paving is completed.
Road PavingPrior to Substantial Completion, OWNER will be responsible for paving of all roads on an installation schedule that is mutually agreeable to DESIGN/BUILDER.
Road Paving. Paving of National Forest System roads and existing graveled parking areas or roads within recreation areas, and at administrative facilities where such paving does not require the removal of earth and there are no known historic properties.
Road Paving. Carrying out of road paving works in the six provincial road sections listed in the Operational Manual (which works will require the widening of the existing right-of-way of said road sections).
Road Paving. 1i) Loop Road. Asphalt paving of the Loop Road shall be completed by December 31, 2026, or when 30 residential building permits are issued within River Rim, whichever is sooner. ii2) Turning Lanes. Asphalt paving for the turning lanes on State Highway 33 (main entrance) shall be completed by either December 31, 2026; mandate of the Idaho Transportation Department; the issuance of 30 building permits in Division II Phase I; or when the Average Daily Traffic (ADT) exceeds 200 ADT, whichever is sooner. The North and West entrance turning lanes will not be required prior to the completion of additional commercial development to within West Rim Village area after the date of this Agreement; or as mandated by the Idaho Transportation Department..
Road Paving. If particulate matter restrictions in the air permit require paving of the plant roads, this will be part of the requirements of OWNER.
Road Paving. 670 1. Effective January 1, 2002 Road Paving shall be amended to include all curb work, 671 sidewalks, drains,catch basin repair. .
Road Paving 

Related to Road Paving

  • Sidewalks doorways, vestibules, halls, stairways and other similar areas shall not be obstructed by Tenant or used by Tenant for any purpose other than ingress and egress to and from the Premises. No rubbish, litter, trash, or material shall be placed, emptied, or thrown in those areas. At no time shall Tenant permit Tenant’s employees to loiter in Common Areas or elsewhere about the Building or Property.

  • Roads The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments.

  • Landscaping The Owner will, before its plan of subdivision is released for registration, pay to the Town in lieu of planting any trees on the public streets within the plan, the amount shown for the purpose upon Schedule “J”.

  • WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.

  • Moonlighting Employment as a physician in a professional capacity outside of what is outlined in this Agreement, whether temporary special medical activity (“TSMA”) or external moonlighting, must be approved in writing, in advance, by the Departmental Chair, Program Director and Director of Graduate Medical Education (or designee). Even if approved, professional and general liability insurance as outlined in Section 5.4 is not provided to Trainee engaged in external moonlighting. Trainee acknowledges he or she has the responsibility to obtain insurance for such engagement. TSMA and external moonlighting must be included and reported as part of Trainee's hours spent on clinical experience and education. Trainee shall not be required to engage in any outside work.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Stormwater Management a) The Owner AGREES to implement the requirements incorporated in the Draft Plan Conditions attached as Schedule “F” and any reports submitted to Kawartha Region Conservation Authority and the City pertaining to: i) pre and post development run-off flows and water balance calculations, and the intended means of conveying stormwater flow from each Lot, Block and the entire proposed Plan of Subdivision; ii) the anticipated impact of the Plan of Subdivision on water quality and phosphorus control, as it relates to fish and fish habitat once adequate protective measures have been taken; iii) the means whereby erosion and sedimentation and their effects will be minimized on the site during and after construction; iv) the site soil conditions, including grain size distribution profiles; v) a site grading plan. b) The Owner AGREES to erect and maintain all stormwater management and erosion and sedimentation control structures operating and in good repair during the construction period, in a manner satisfactory to Kawartha Region Conservation Authority and the City. c) Prior to the execution of this Agreement, the Owner AGREES to confirm to the City that Conservation Authority has reviewed and approved the stormwater management report and plan, erosion and sedimentation plan, and final Lot Grading Plans as required under this Section. a) UPGRADES TO EXISTING STORM SEWER b) UPGRADES TO EXISTING SANITARY SEWER