Specific Project Description Sample Clauses

Specific Project Description. Contractor shall provide a new bowl assemble, as necessary for Well 12 and 19 in accordance with Schedule I and II, Fee Schedule Items 110 and 113 and Item 1.02, hereafter. Specific pumping unit related work to be performed as part of this project is identified in the Schedule I- Well 12 Fee Schedule-Scope of Work. Schedule II well 19 fee schedule – Scope of Work Well 12 and 19. Pumping Unit Repair Special Requirements, and generally described as follows: In the event the existing pumping unit is deemed non re-buildable Contractor shall provide up to two
AutoNDA by SimpleDocs
Specific Project Description. A. Design Guidelines-The project shall be designed in accordance with the site, building and sign design standards set forth in the Freeway Tourist Design Standards – March 2014. Such design standards are minimal standards and may be enhanced as provided in “Urban Design Features” (C. 3. below).
Specific Project Description. Contractor shall provide a new bowl assemble in accordance with Fee Schedule Item 111 and Item 1.02, hereafter. Specific pumping unit related work to be performed as part of this project is identified in the Fee Schedule-Scope of Work, Well 26 Pumping Unit Repair Special Requirements, and generally described as follows:  Provide temporary facilities as necessary for removal of pumping facilities. In the event the Vendor proposes to land the pumping unit on the top of the below grade vault during the removal process, the Vendor shall provide a temporary support system (i.e. steel beams, etc.) which bridge the top of the vault lid to provide pumping unit support without loading said vault lid. Specifically, support shall at least reach from vault side wall to vault side wall (approximately 18’-6”).  Remove existing Well 26 pumping unit equipment including 400 horsepower 480 volt 3 phase electric motor, discharge head, 647’± of column, tube and line shaft (including couplings, centering spiders, and bearings) for oil lubricated pumping unit. Tag well to determine presence of fill.  Inspect and provide comments and/or recommendations regarding serviceability of existing pump column, tube, and shaft.  Deliver the District’s existing 400 hp electric motor from the Well 26 project site to the District’s electrical repair vendor, Brithinee Electric. District will arrange and pay for Brithinee Electric to inspect and perform a full spectrum vibration analysis on the existing motor and make any repairs deemed necessary to the motor. Brithinee Electric is located at 000 Xxxxx Xxxxxx Xxxxxx in the City of Colton, Ca.  Haul Column, Tube, and Shaft and pump bowl assembly to Vendor yard for evaluation regarding condition and serviceability of the column, tube, and shaft.  Recondition (as required) 647’± of existing 12" pump column.  Disassemble and inspect pump bowl assembly. Measure and record wear and damage. Provide report and recommendations to District of bowl conditions and refurbishment options (this work is to be completed in order for the District to access the existing bowl condition only, upon completion of this work, the District will then make the decision whether to rebuild the existing bowl assembly or replace said existing bowl assembly with a new bowl assembly). In the event the District elects to replace the existing bowl assembly, said existing bowl assembly shall be delivered from the Vendors place of disassembly to the District’s Well 2 site ...
Specific Project Description. Contractor shall remove existing pumping unit including discharge head, column, tube, shaft, and bowl assemble in accordance with Fee Schedule and as described in the special requirements. Specification Section is provided as a reference for work activities related to pumping unit removal and installation, and startup requirements. Specific work to be performed as part of this project is identified in the Fee Schedule-Scope of Work, Well 22 Placement of Gravel Seal, Bentonite Plug, and Cement Cap Special Requirements.

Related to Specific Project Description

  • General Project Description 2. Substation location.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • Contract Description The Description and Location of the Contract and related project(s) are as follows.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 76L Single Lane / Level 2 76 0.00 Ending 0.48

  • Project Location & Description The Project, for which the provision of financial assistance is the subject of this Agreement, is hereby described as follows:

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.

  • Specific Provisions 4.1 Unless the CERT otherwise agrees, based on exceptional circumstance and sufficient justification, Implementing Agreements shall be for an initial term of up to, but no more than, five years.

  • State Specific Provisions N/A. ATTACHED EXHIBIT. The Exhibit noted below, if marked with an "X" in the space provided, is attached to this Note: X Exhibit A Modifications to Multifamily Note

Time is Money Join Law Insider Premium to draft better contracts faster.