Stage 1B Completion Tests Sample Clauses

Stage 1B Completion Tests. Project Co must undertake and successfully pass Completion Tests that demonstrate: (a) that the Stage 1B New Car Park is secure, weatherproof and watertight; (b) the calibration, setting and adjusting of all control instruments, control systems and safety controls; (c) the operation of all mechanical plant for a seven day week under automatic control; (d) that the building management system is operational; (e) all aspects of the electrical system including that all circuit protective devices are in place and sized and adjusted to protect installed circuits; (f) that emergency and safety systems operate correctly after failure of the normal (mains) power supply; (g) the simulation of the security alarm and the operation of the security systems including quality and resolution of the digital CCTV footage; (h) the operability of all locks; (i) the operability of way finding signage; (j) the operability of all boom gates and ticket machines; (k) the operability of all fixtures, fittings and items of equipment in accordance with the manufacturer’s requirements; (l) safe operation of vertical transportation under automatic control; (m) compliance with the Environmental Protection (Noise) Regulations 1997 (WA) for noise emissions from the building; (n) simulation of a mains power failure and demonstration of emergency lighting and lift escape methodology; (o) demonstration of the ventilation system; (p) simulation of a fire alarm and operation of the fire alarm and sprinkler systems; (q) the operation of the lift services including call buttons, levelling, communications and ride quality; and (r) hydraulic systems under normal working conditions, flushing of pipelines and testing of hot or warm water services.
AutoNDA by SimpleDocs

Related to Stage 1B Completion Tests

  • Project Completion Date It is agreed between the Parties that the Project Completion Date is <END DATE, YEAR>. If the Project is not completed by such date then, subject to an amendment agreed to between the Parties, Alberta Innovates may elect to terminate this Investment Agreement. In such event, Alberta Innovates will notify the Applicant of its decision to terminate as soon as reasonably practical and shall advise the Applicant of the effective date of termination. Alberta Innovates will have no liability or obligation to reimburse the Applicant for any Project Costs incurred after the effective date of termination and may require the Applicant to return any portions of the Investment which were spent on Ineligible Expenses. Additionally, any portion of the Investment not used and accounted for in accordance with this Agreement as of the Project Completion Date or earlier termination is repayable by the Applicant to AI at AI’s request.

  • Project Completion The Contractor agrees to schedule a final job walk with the County. If required, the County will prepare a list of incomplete items, the “Punch List”. The Contractor agrees to complete the “Punch List” corrections and schedule a final project completion job walk. The County will sign the “Punch List” as completed when determined, the project is finished. The Contractor agrees to submit the following along with its final payment request:

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • Final Completion Date Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31, 2024.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Substantial Completion Date Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 2022.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Substantial Completion 9.8.1 When the Contractor considers that the Work, or a designated portion thereof which has been accepted in writing to by the State, is substantially complete as defined in Subparagraph

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.