Street Paving. Technical specifications shall conform to current City or applicable County minimum requirements. All paving shall be either concrete curb and gutter or asphalt and monolithic concrete curb and gutter. Open-ditch roadway drainage requires specific written approval of the ARC.
AutoNDA by SimpleDocs
Street Paving. (b) High Groundwater Levels - an overall groundwater study was prepared in conjunction with the approval of the concept plan for the Brighton Neighbourhood. The Developer shall hire a consulting engineer to report specifically on the groundwater conditions within the Development Area. The report shall include recommendations of the consulting engineer, including recommendations respecting remediation procedures deemed appropriate to mitigate high groundwater conditions. The City shall review the recommendations and if the City considers it necessary, it shall inform the Developer of the requirement to implement the recommended remediation procedures. The Developer agrees to complete the recommended remediation procedures at its cost. The work shall be completed to the satisfaction of the Manager.

Related to Street Paving

  • Street Lighting 4.4.1 The Developer shall provide streetlights for the entire Subdivision at his sole expense. The type of lighting standard, pole spacing, and installation shall be per Memphis Light, Gas and Water standards. Memphis Light Gas and Water shall bill the City for installation of street lighting per its standards.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Glazing All new and replacement exterior windows shall have sealed, low emmissivity, insulating glass units which are manufactured by members of SIGMA and IGCC. Sealed insulating glass shall meet ASTM E774, class B. Glass shall be hermetically dual sealed, inert gas filled, double pane units with exterior 3/16” bronze float glass (IoE second surface), ½” air space, and interior 3/16” clear float glass. Insulated panels, if used, shall be 1” laminated panels equal to Xxxxx Industries architectural panels with a porcelain fused-on finish. Wired or clear fire-rated glass shall be UL approved. Safety glass shall be tempered or laminated, and shall meet ANSI 297.1 standard.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Hazing Hazing is a process, based on tradition that is used by groups to maintain a hierarchy (i.e., a pecking order) within the group. Regardless of consent, the rituals require individuals to engage in activities that are physically and/or psychologically stressful. These activities can be humiliating, demeaning, intimidating, and exhausting, all of which results in physical or emotional discomfort. Hazing is about group dynamics and proving one’s worthiness to become a member of a specific group. The newcomer, or victim, is hazed. Once accepted by the group, the victim may become a bystander, watch others get hazed, achieve senior status, and ultimately become a perpetrator of hazing. In New Jersey, hazing is a separate criminal offense under N.J.S.A. 2C:40-3. School officials should be aware that hazing which involves the participation of a coach or a teacher may also constitute child abuse. Hazing may also involve other predicate crimes, such as sexual assault. Hazing may also constitute HIB. As noted in Article 4.4.2, although HIB is not a separately defined criminal offense, the conduct that constitutes bullying may constitute one or more criminal or disorderly person offenses, including assault, harassment, threats, robbery and sexual offenses.

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Sidewalks doorways, vestibules, halls, stairways and other similar areas shall not be obstructed by Tenant or used by Tenant for any purpose other than ingress and egress to and from the Premises. No rubbish, litter, trash, or material shall be placed, emptied, or thrown in those areas. At no time shall Tenant permit Tenant’s employees to loiter in Common Areas or elsewhere about the Building or Property.