Surveying and Mapping. The Surveyor shall evaluate the existing ROW envelope and make recommendations for the acquisition of ROW necessary for the Project including but not limited to roadway, corner cuts, sight distance triangles, detention, and outfalls. The Surveyor shall prepare a ROW Acquisition Table which shall include a parcel ID number, acreage (and square footage) to be acquired, acreage of the parent tract, acreage remaining of the parent tract, current owner, recording information, current flood plain zone, and note any issues that may affect the acquisition of the parcels. The scope and fee from the sub-consultant is attached to this exhibit.
Surveying and Mapping. Land Surveying
Surveying and Mapping. INTERSECTION EVALUATION
Surveying and Mapping. No map or plat herein referred to, or required to be furnished hereunder, shall be used by anyone other than the parties hereto for the purposes of this agreement as a basis of attempting to establish what any person may believe to be the boundary of Xxxx Xxxxxxx Island, and the parties hereto shall not be estopped from asserting as against third parties that some other boundary is the correct boundary of Xxxx Xxxxxxx Island. In other words, any such map used or referred to in connection herewith is for the purposes of this agreement and the convenience of the parties hereto, and shall have no other effect, bearing, consequence, result, applicability, reference or relevancy to any other ownership, map, thing, or otherwise whatsoever.
Surveying and Mapping. The topographic survey will be at a drawing scale of 1 inch = 20 feet, unless otherwise requested, with one-foot contour intervals. The topographic survey will also include: Prior to the field survey, Quincy shall perform a records search and will call Underground Service Alert to provide utility markings in the project area. Quincy will obtain an Encroachment Permit from Contra Costa County Flood Control for creek access.
Surveying and Mapping. COUNTY will provide a Surveyor to verify road alignment, 2 pile locations on each abutment, abutment wall forms, and bridge slab forms. CONSULTANT will coordinate with COUNTY’s Surveyor for spot verification of COUNTY Contractor’s (CONTRACTOR) staking and layout. TASK 3 Geotechnical Not used Utility co-ordination on the project must be carefully carried out so that local disruptions of service are kept at a minimum during relocations or other utility work. CONSULTANT will:
Task 4.1 Establish communication with utility companies affected by the project.
Task 4.2 Monitor CONTRACTOR’s coordination with utility agencies and observe utility work by utility agencies for compliance with project documents.
Surveying and Mapping. The Consultant will provide professional staff to advise and confer with the Department in the performance of Professional surveying and Mapping functions as directed. • Review, coordinate, and manage for completeness and acquiring all Surveying and Mapping work. • Advise and consult on questions of surveying and mapping with respect to project intent. • Incidental survey work as requested. • Advise and consult on questions of surveying and mapping with respect to construction of the project. Establish and maintain a records system. Meet with public officials of government agencies as required. • Provide management services necessary to coordinate, plan, execute, direct and control the surveying and mapping functions in conformance with the Department procedures and directives.
Surveying and Mapping. The ENGINEER will provide surveying and mapping services for the project limits as described below:
Surveying and Mapping. 1. A - 1.C Surveying and Mapping 24 40 80 120 10 274 $ - $ 37,850 2.A-2.K Geotechnical Evaluation and Report 1 4 3 2 3 13 $ 24,460 $ 26,160
Surveying and Mapping. As part of our work, SHN will gather data and documentation on existing property and right-of-way lines. After researching records, the project surveyor will develop a plan to assure that the all the necessary information is collected to support design, utility relocations, if any, and right-of-way determination. Prior to commencement of the topographic field survey SHN will communicate with the Geotechnical consultant to insure the project area is marked for Underground Service Alert purposes to facilitate future geotechnical tasks as well as identifying utilities in the project mapping. Topographic, streams and boundary field surveys will include all necessary work to produce topographic and cross section mapping as outlined in Task 2 of the Request for Proposal (RFP). During this effort the property corners identified on maps in the project vicinity and right of way monuments set on State Highway 128 that control the location of Xxxxxxx Xxxx where it crosses Xxxxxxxx Creek will be surveyed. In addition to the topographic field survey, the South Quarter Corner of Section 2, T. 13 N., R. 14 W. will be located or positioned base upon local record maps. The purpose of this survey is to establish the project location within Section 2 and to provide ties to the Section for use in plotting, right of way descriptions and Graphic Information Systems. The field surveys will be compiled in AutoCAD Civil 3D (2013). All mapping will comply with the requirements for deliverables identified in Task 2 of the RFP. Accurate locations of existing rights of way and boundary lines will be determined based upon record title information, found monuments shown on recorded surveys in the project area and right of way monuments for State Highway 128. The basis for the topographic, right of way and boundary related surveys will be State Plane Coordinate System NAD 83 horizontally and NAVD 88 vertically. Project surveys will be accomplished using only field survey techniques and will adhere to Caltrans survey manual for standards of accuracy, Caltrans survey manual for field procedures and the Caltrans safety manual for safe surveying practices.